[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258972":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1258972,842,3,"判断题","实施性施工进度计划确定了各分部分项工程的施工时间及其相互之间的衔接、穿插、平行搭接、协作配合等关系。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"实施性施工进度计划确定了各分部分项工程的施工时间及其相互之间的衔接、穿插、平行搭接、协作配合等关系。",{"id":6,"name":21,"category":22,"favorite":23},"(土建施工)专业管理实务 岗位知识","建筑工程",0]