[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258968":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1258968,842,2,"多选题","建筑工程质量验收的程序和组织中指出，建设单位收到工程报告后，应由建设单位负责人组织（ ）负责人进行单位（子单位）工程验收。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","质检部门",false,{"key":16,"text":17,"correct":18},"B","施工单位",true,{"key":20,"text":21,"correct":18},"C","监理单位",{"key":23,"text":24,"correct":18},"D","勘察单位",{"key":26,"text":27,"correct":18},"E","设计单位","BCDE","单位工程完工后，建设单位收到工程竣工报告后，由建设单位项目负责人组织监理、施工、设计、勘察等单位项目负责人对单位工程进行了验收。",{"id":6,"name":31,"category":32,"favorite":33},"(土建施工)专业管理实务 岗位知识","建筑工程",0]