[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258929":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1258929,842,2,"多选题","属于结构吊装工程验收记录表格中主控项目的是（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","预制构件的进场检查",true,{"key":16,"text":17,"correct":14},"B","预制构件的连接",{"key":19,"text":20,"correct":14},"C","接头和拼缝的混凝土强度",{"key":22,"text":23,"correct":24},"D","预制构件吊装",false,{"key":26,"text":27,"correct":24},"E","安装控制标志","ABC","预制构件的进场检查，预制构件的连接，接头和拼缝的混凝土强度属于结构吊装工程验收记录表格中主控项目",{"id":6,"name":31,"category":32,"favorite":33},"(土建施工)专业管理实务 岗位知识","建筑工程",0]