[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258923":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1258923,842,2,"多选题","人工挖孔灌注桩施工过程中应对（ ）等进行全过程检查。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","成孔清渣",true,{"key":16,"text":17,"correct":14},"B","放置钢筋笼",{"key":19,"text":20,"correct":14},"C","混凝土灌注",{"key":22,"text":23,"correct":24},"D","周边土的强度",false,{"key":26,"text":27,"correct":14},"E","挖孔桩的孔底持力层土（岩）性","ABCE","人工挖孔灌注桩施工过程中应对成孔清渣，放置钢筋笼，混凝土灌注和挖孔桩的孔底持力层土（岩）性等进行全过程检查。",{"id":6,"name":31,"category":32,"favorite":33},"(土建施工)专业管理实务 岗位知识","建筑工程",0]