[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258897":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1258897,842,2,"多选题","施工进度计划编制依据包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","约束条件",true,{"key":16,"text":17,"correct":14},"B","工程的工期要求及开工、竣工日期",{"key":19,"text":20,"correct":14},"C","资源需求",{"key":22,"text":23,"correct":24},"D","施工方法",false,{"key":26,"text":27,"correct":14},"E","作业制度安排","ABCE","施工进度计划编制依据：资源需求；作业制度安排；约束条件；项目工作的提前和滞后要求等。",{"id":6,"name":31,"category":32,"favorite":33},"(土建施工)专业管理实务 岗位知识","建筑工程",0]