[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258842":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1258842,842,2,"多选题","根据成本管理要求，工程项目成本的形式可划分为（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","承包成本",true,{"key":16,"text":17,"correct":18},"B","直接成本",false,{"key":20,"text":21,"correct":14},"C","计划成本",{"key":23,"text":24,"correct":18},"D","固定成本",{"key":26,"text":27,"correct":14},"E","实际成本","ACE","工程项目成本的形式：①根据成本管理要求划分为：承包成本、计划成本、实际成本。",{"id":6,"name":31,"category":32,"favorite":33},"(土建施工)专业管理实务 岗位知识","建筑工程",0]