[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258825":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1258825,842,2,"多选题","施工项目质量控制的基本程序划分为几个阶段，包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","计划控制",true,{"key":16,"text":17,"correct":18},"B","过程控制",false,{"key":20,"text":21,"correct":14},"C","监督检查阶段",{"key":23,"text":24,"correct":14},"D","报告偏差阶段",{"key":26,"text":27,"correct":14},"E","采取纠正行动阶段","ACDE","施工项目质量控制的基本程序划分为四个阶段：①计划控制阶段：这一阶段主要是制定质量目标，实施方案和计划；②监督检查阶段；③报告偏差阶段；④采取纠正行动阶段。",{"id":6,"name":31,"category":32,"favorite":33},"(土建施工)专业管理实务 岗位知识","建筑工程",0]