[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258647":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1258647,842,1,"单选题","水泥土墙支护结构位移超过设计值较多时，水泥土墙卸载方式是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","背后",true,{"key":16,"text":17,"correct":18},"B","上部",false,{"key":20,"text":21,"correct":18},"C","前部",{"key":23,"text":24,"correct":18},"D","下部","水泥土墙支护结构位移超过设计值较多时，水泥土墙卸载方式是背后。",{"id":6,"name":27,"category":28,"favorite":29},"(土建施工)专业管理实务 岗位知识","建筑工程",0]