[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258615":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1258615,842,1,"单选题","施工单位现场质量检查的内容不包括下列哪一项（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","成品保护检查",false,{"key":16,"text":17,"correct":18},"B","开工后检查",true,{"key":20,"text":21,"correct":14},"C","工序交接检查",{"key":23,"text":24,"correct":14},"D","停工后复工前的检查","施工单位现场质量检查的内容有：①开工前检查；②工序交接检查；③隐蔽工程检查；④停工后复工前的检查；⑤分项分部工程完工后，应经检查认可，签署验收记录后，才允许进行下一工程项目施工；⑥成品保护检查。",{"id":6,"name":27,"category":28,"favorite":29},"(土建施工)专业管理实务 岗位知识","建筑工程",0]