[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258592":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1258592,842,1,"单选题","根据该工程实际完成的工程量产值，每月扣回的工程预付款为（ ）万元。（单题）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3.816",false,{"key":16,"text":17,"correct":14},"B","4.770",{"key":19,"text":20,"correct":21},"C","6.360",true,{"key":23,"text":24,"correct":14},"D","9.540","根据该工程实际完成的工程量产值，每月扣回的工程预付款为6.360万元。",{"id":6,"name":27,"category":28,"favorite":29},"(土建施工)专业管理实务 岗位知识","建筑工程",0]