[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258444":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1258444,842,1,"单选题","以下关于各专业施工图的排列顺序说法错误的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","基础图在前，详图在后",false,{"key":16,"text":17,"correct":14},"B","总体图在前，局部图在后",{"key":19,"text":20,"correct":21},"C","次要部分在前，主要部分在后",true,{"key":23,"text":24,"correct":14},"D","先施工的在前，后施工的在后","各专业施工图应按图纸内容的主次关系来排列：基础图在前，详图在后、总体图在前，局部图在后、主要部分在前，次要部分在后、先施工的在前，后施工的在后。",{"id":6,"name":27,"category":28,"favorite":29},"(土建施工)专业管理实务 岗位知识","建筑工程",0]