[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-841-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":577},{"id":5,"name":6,"category":7,"favorite":8},841,"(土建施工)基础知识","建筑工程",0,9,50,1496,[13,34,46,58,70,82,94,106,118,130,142,154,162,174,186,194,206,218,230,242,250,262,274,285,293,303,314,326,335,345,357,369,378,390,402,411,423,435,447,456,468,479,491,503,515,526,534,545,557,565],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1257193,1,"单选题","墙体砌筑1m高以上时，一般需在室内墙身上弹出（ ）m标高线作为该层地面、墙面装饰施工标高控制线。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","+0.200",false,{"key":24,"text":25,"correct":22},"B","+0.300",{"key":27,"text":28,"correct":29},"C","+0.500",true,{"key":31,"text":32,"correct":22},"D","+0.800","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1257194,"编制工程量清单出现工程量计量规范附录中未包括的清单项目时，编制人应作补充，下列关于编制补充清单项目的说法中，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"补充项目编码由三位阿拉伯数字组成",{"key":24,"text":41,"correct":22},"补充项目应报县级工程造价管理机构备案",{"key":27,"text":43,"correct":29},"补充项目的项目名称、项目特征、计量单位、工程量计算规则和工作内容等应予以明确",{"key":31,"text":45,"correct":22},"补充项目编码应顺序编制，起始序号由编制人根据需要自主确定",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1257195,"某单位在进行项目前期可行性研究时，利用工程建设投资估算指标进行项目的经济分析，最终形成项目可行性报告，并将报告上报给单位决策层作为决策的依据。请针对工程建设投资估算指标的有关要求，回答下列有关问题： 建设项目综合指标是指应列人建设项目总投资的从立项筹建开始至竣工验收交付使用的全部投资额，其组成项目中不应包括（ ）。（单选题）",[50,52,54,56],{"key":20,"text":51,"correct":22},"单项工程投资",{"key":24,"text":53,"correct":22},"工程建设其他费用",{"key":27,"text":55,"correct":22},"预备费",{"key":31,"text":57,"correct":29},"建设项目总投资",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1257196,"用概算指标编制概算时，要以（ ）为计算基础。",[62,64,66,68],{"key":20,"text":63,"correct":22},"使用面积",{"key":24,"text":65,"correct":22},"辅助面积",{"key":27,"text":67,"correct":22},"结构面积",{"key":31,"text":69,"correct":29},"建筑面积",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1257197,"建筑物顶部有围护结构的楼梯间，层高在（ ）m及以上者应计算全面积。",[74,76,78,80],{"key":20,"text":75,"correct":22},"2.0",{"key":24,"text":77,"correct":22},"2.1",{"key":27,"text":79,"correct":29},"2.2",{"key":31,"text":81,"correct":22},"2.3",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1257198,"工程造价计价的基本原理在于项目的（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"特殊性与普遍性",{"key":24,"text":89,"correct":22},"固定性与流动性",{"key":27,"text":91,"correct":29},"分解与组合",{"key":31,"text":93,"correct":22},"单件性与多样性",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1257199,"建筑安装工程直接费由直接工程费和（ ）组成。",[98,100,102,104],{"key":20,"text":99,"correct":22},"间接费",{"key":24,"text":101,"correct":22},"利润",{"key":27,"text":103,"correct":29},"措施费",{"key":31,"text":105,"correct":22},"税金",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1257200,"根据《建筑工程施工质量验收统一标准》GB50300，下列属于分项工程的是（ ）",[110,112,114,116],{"key":20,"text":111,"correct":22},"砌体结构",{"key":24,"text":113,"correct":29},"土方开挖",{"key":27,"text":115,"correct":22},"基坑支护",{"key":31,"text":117,"correct":22},"混凝土结构",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1257201,"根据《房屋建筑与装饰工程工程量计算规范》GB50854，关于基础土方开挖的工程量计算，说法正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"基础设计底面积乘以基础埋深",{"key":24,"text":125,"correct":22},"基础设计底面积乘以基础设计高度",{"key":27,"text":127,"correct":29},"基础垫层设计底面积乘以挖土深度",{"key":31,"text":129,"correct":22},"基础垫层设计底面积乘以基础设计高度和垫层厚度之和",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1257202,"分部分项工程量清单的内容中，构成分部分项工程项目、措施项目自身价值的本质特征的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"项目名称",{"key":24,"text":137,"correct":29},"项目特征",{"key":27,"text":139,"correct":22},"计量单位",{"key":31,"text":141,"correct":22},"工程数量的计算",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1257203,"下列属于措施费项目清单的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"住房公积金",{"key":24,"text":149,"correct":22},"企业管理费",{"key":27,"text":151,"correct":29},"文明施工费",{"key":31,"text":153,"correct":22},"工伤保险费",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1257204,"雨篷结构的外边线至外墙结构外边线的宽度超过（ ）m者,应按雨篷结构板的水平投影面积的1\u002F2计算。",[158,159,160,161],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":29},{"key":27,"text":79,"correct":22},{"key":31,"text":81,"correct":22},{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":27,"analysis":33},1257205,"已知某挖土机挖土，一次正常循环工作时间是40秒，每次循环平均挖土量0.3m3，机械正常利用系数为0.8，机械幅度差为25%。则该机械挖土方1000m3的预算定额机械耗用台班量是（ ）台班。",[166,168,170,172],{"key":20,"text":167,"correct":22},"4.63",{"key":24,"text":169,"correct":22},"5.79",{"key":27,"text":171,"correct":29},"7.23",{"key":31,"text":173,"correct":22},"7.41",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":20,"analysis":33},1257206,"有永久性顶盖无围护结构的加油站的水平投影面积为80㎡，其建筑面积为（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":29},"40",{"key":24,"text":181,"correct":22},"80",{"key":27,"text":183,"correct":22},"160",{"key":31,"text":185,"correct":22},"120",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":27,"analysis":33},1257207,"有围护结构的舞台灯光控制室，层高在（ ）m及以上者应计算全面积。",[190,191,192,193],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":29},{"key":31,"text":81,"correct":22},{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":31,"analysis":33},1257208,"下列不属于建筑安装工程费中材料费的是（ ）。",[198,200,202,204],{"key":20,"text":199,"correct":22},"采购及保管费",{"key":24,"text":201,"correct":22},"工程设备费",{"key":27,"text":203,"correct":22},"材料运杂费",{"key":31,"text":205,"correct":29},"材料检验试验费",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":27,"analysis":33},1257209,"按照建筑面积计算规则，下列不需计算建筑面积的是（ ）。",[210,212,214,216],{"key":20,"text":211,"correct":22},"建筑物外墙外侧保温隔热层",{"key":24,"text":213,"correct":22},"建筑物内的变形缝",{"key":27,"text":215,"correct":29},"无永久性顶盖的架空走廊",{"key":31,"text":217,"correct":22},"有围护结构的屋顶水箱间",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":27,"analysis":33},1257210,"建设项目总投资可以表示为（ ）。",[222,224,226,228],{"key":20,"text":223,"correct":22},"固定资产+流动资产",{"key":24,"text":225,"correct":22},"建设投资+流动资产投资",{"key":27,"text":227,"correct":29},"固定资产投资+流动资产投资",{"key":31,"text":229,"correct":22},"工程费十工程建设其他费",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":20,"analysis":33},1257211,"某单位在进行项目前期可行性研究时，利用工程建设投资估算指标进行项目的经济分析，最终形成项目可行性报告，并将报告上报给单位决策层作为决策的依据。请针对工程建设投资估算指标的有关要求，回答下列有关问题： 与概预算定额相比较，工程建设投资估算指标可以以（ ）为编制对象。（单选题）",[234,236,238,240],{"key":20,"text":235,"correct":29},"单位工程",{"key":24,"text":237,"correct":22},"子单位工程",{"key":27,"text":239,"correct":22},"分部工程",{"key":31,"text":241,"correct":22},"子分部工程",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":27,"analysis":33},1257212,"坡地的建筑物吊脚架空层、深基础架空层，设计加以利用并有围护结构的，层高在（ ）m及以上的部位应计算全面积。",[246,247,248,249],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":29},{"key":31,"text":81,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1257213,"根据《建筑工程建筑面积计算规范》GB\u002FT50353，建筑面积计算正确的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":29},"单层建筑物应按其外墙勒脚以上结构外围水平面积计算",{"key":24,"text":257,"correct":22},"单层建筑高度2.10m以上者计算全面积，2.10m及以下计算1\u002F2面积",{"key":27,"text":259,"correct":22},"设计利用的坡屋顶，净高不足2.10m的不计算面积",{"key":31,"text":261,"correct":22},"坡屋顶内净高在1.20～2.20m部位应计算1\u002F2面积",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1257214,"关于建筑物内管道井的建筑面积计算，说法正确的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"不计算建筑面积",{"key":24,"text":269,"correct":22},"按管道图示结构内边线面积计算",{"key":27,"text":271,"correct":22},"按管道井净空面积的一半乘以层数计算",{"key":31,"text":273,"correct":29},"按自然层计算建筑面积",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1257215,"下列应计算建筑面积的部位是（ ）。",[278,280,281,283],{"key":20,"text":279,"correct":22},"自动人行道",{"key":24,"text":213,"correct":29},{"key":27,"text":282,"correct":22},"装饰性幕墙",{"key":31,"text":284,"correct":22},"无永久性顶盖的架空通廊",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},1257216,"立体书库、立体仓库、立体车库，层高在（ ）m及以上者应计算全面积。",[289,290,291,292],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":29},{"key":31,"text":81,"correct":22},{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":31,"analysis":33},1257217,"按工程量清单计价方式，下列构成招标报价的各项费用中，应该在单位工程费汇总表中列项的是（ ）。",[297,299,301,302],{"key":20,"text":298,"correct":22},"直接工程费",{"key":24,"text":300,"correct":22},"管理费",{"key":27,"text":101,"correct":22},{"key":31,"text":105,"correct":29},{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":31,"analysis":33},1257218,"工程量计算规则，是确定建筑产品（ ）工程数量的基本规则。",[307,309,311,312],{"key":20,"text":308,"correct":22},"工程建设项目",{"key":24,"text":310,"correct":22},"单项工程",{"key":27,"text":235,"correct":22},{"key":31,"text":313,"correct":29},"分部分项",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":27,"analysis":33},1257219,"挑阳台的水平投影面积为10㎡，其建筑面积为（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":22},"10",{"key":24,"text":321,"correct":22},"20",{"key":27,"text":323,"correct":29},"5",{"key":31,"text":325,"correct":22},"15",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":31,"analysis":33},1257220,"最上层楼梯无永久性楼盖，其自然层的水平投影面积为10㎡，上层楼梯的建筑面积为（ ）。",[330,331,332,333],{"key":20,"text":319,"correct":22},{"key":24,"text":321,"correct":22},{"key":27,"text":323,"correct":22},{"key":31,"text":334,"correct":29},"不算面积",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":24,"analysis":33},1257221,"使用面积和辅助面积的总和称为（ ）。",[339,340,342,343],{"key":20,"text":67,"correct":22},{"key":24,"text":341,"correct":29},"有效面积",{"key":27,"text":69,"correct":22},{"key":31,"text":344,"correct":22},"净面积",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":20,"analysis":33},1257222,"多层建筑物二层以上楼层按其外墙结构外围水平面积计算建筑面积，层高在2.20m及以上者计算全面积，其层高是指（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":29},"上下两层楼面结构标高之间的垂直距离",{"key":24,"text":352,"correct":22},"本层地面与屋面板结构标高之间的垂直距离",{"key":27,"text":354,"correct":22},"最上一层层高是指其楼面至屋面板底结构标高之间的垂直距离",{"key":31,"text":356,"correct":22},"最上层遇屋面找坡的以其楼面至屋面板最高处板面结构之间的垂直距离",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":31,"analysis":33},1257223,"预制混凝土构件的工程量计算，遵循统筹图计算程序安排的原则（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"共性和在一起",{"key":24,"text":364,"correct":22},"个性分别处理",{"key":27,"text":366,"correct":22},"先主后次",{"key":31,"text":368,"correct":29},"独立项目单独处理",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},1257224,"利用坡屋顶内空间时净高超过（ ）m的部位应计算全面积。",[373,375,376,377],{"key":20,"text":374,"correct":22},"2.O",{"key":24,"text":77,"correct":29},{"key":27,"text":79,"correct":22},{"key":31,"text":81,"correct":22},{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},1257225,"单位工程计算顺序一般按（ ）列项顺序计算。",[382,384,386,388],{"key":20,"text":383,"correct":29},"计价规范清单",{"key":24,"text":385,"correct":22},"顺时针方向",{"key":27,"text":387,"correct":22},"图纸分项编号",{"key":31,"text":389,"correct":22},"逆时针方向",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":31,"analysis":33},1257226,"基础定额项目主要是以（ ）为对象划分。",[394,396,398,400],{"key":20,"text":395,"correct":22},"最终产品",{"key":24,"text":397,"correct":22},"实际完成工程",{"key":27,"text":399,"correct":22},"主体项目",{"key":31,"text":401,"correct":29},"施工过程",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},1257227,"现行《建筑安装工程费用项目组成》中，脚手架费用应计人（ ）。",[406,407,408,410],{"key":20,"text":298,"correct":22},{"key":24,"text":103,"correct":29},{"key":27,"text":409,"correct":22},"规费",{"key":31,"text":149,"correct":22},{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":31,"analysis":33},1257228,"某分部分项工程量清单编码为010302006003，则该分部分项工程的清单项目顺序编码是（ ）。",[415,417,419,421],{"key":20,"text":416,"correct":22},"01",{"key":24,"text":418,"correct":22},"02",{"key":27,"text":420,"correct":22},"006",{"key":31,"text":422,"correct":29},"003",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},1257229,"分部分项工程量清单项目的工程量应以实体工程量为准，对于施工中的各种损耗和需要增加的工程量，投标人投标报价时，应在（ ）中考虑。",[427,429,431,433],{"key":20,"text":428,"correct":22},"措施项目",{"key":24,"text":430,"correct":29},"该清单项目的单价",{"key":27,"text":432,"correct":22},"其他项目清单",{"key":31,"text":434,"correct":22},"预留金",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":27,"analysis":33},1257230,"关于建筑物雨篷结构的建筑面积计算，说法正确的是（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"有柱雨篷按结构外边线计算建筑面积",{"key":24,"text":442,"correct":22},"无柱雨篷按雨篷水平投影面积计算",{"key":27,"text":444,"correct":29},"无柱雨篷外边线至外墙结构外边线不足2.1m的不计算面积",{"key":31,"text":446,"correct":22},"雨篷外边线至外墙结构外边线超过2.1m时按投影计算面积",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":27,"analysis":33},1257231,"建筑物场地厚度在±（ ）cm以内的挖、填、运、找平，应按平整场地项目编码列项。",[451,452,453,455],{"key":20,"text":319,"correct":22},{"key":24,"text":321,"correct":22},{"key":27,"text":454,"correct":29},"30",{"key":31,"text":179,"correct":22},{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":31,"analysis":33},1257232,"关于建筑面积的计算，说法正确的是（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":22},"建筑物凹凸阳台按其水平投影面积计算",{"key":24,"text":463,"correct":22},"有永久性顶盖的室外楼梯，按自然层水平投影面积计算",{"key":27,"text":465,"correct":22},"建筑物顶部有围护结构的楼梯间，层高超过2.10m的部分计算全面积",{"key":31,"text":467,"correct":29},"雨篷外挑宽度超过2.1m时，按雨篷结构板的水平投影面积的一半计算面积",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},1257233,"根据《建筑安装工程费用项目组成》，某办公楼工程所需安装的永久性水表的费用属于（ ）。",[472,473,475,477],{"key":20,"text":409,"correct":22},{"key":24,"text":474,"correct":29},"材料费",{"key":27,"text":476,"correct":22},"施工机具使用费",{"key":31,"text":478,"correct":22},"人工费",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":24,"analysis":33},1257234,"以（ ）确定工程造价，是我国采用的一种与计划经济相适应的工程造价管理制度。",[483,485,487,489],{"key":20,"text":484,"correct":22},"工程量清单计价",{"key":24,"text":486,"correct":29},"预算定额单价法",{"key":27,"text":488,"correct":22},"企业定额",{"key":31,"text":490,"correct":22},"概算定额",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":20,"analysis":33},1257235,"统筹图以（ ）作为基数，连续计算与之有共性关系的分部分项工程。",[495,497,499,501],{"key":20,"text":496,"correct":29},"三线一面",{"key":24,"text":498,"correct":22},"册",{"key":27,"text":500,"correct":22},"图示尺寸",{"key":31,"text":502,"correct":22},"面",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":31,"analysis":33},1257236,"一单项工程分为3个子项，它们的概算造价分别是500万元、1200万元、3600万元，该工程设备购置费是900万元，则该单项工程总概算造价是（ ）万元。",[507,509,511,513],{"key":20,"text":508,"correct":22},"4800",{"key":24,"text":510,"correct":22},"1700",{"key":27,"text":512,"correct":22},"1200",{"key":31,"text":514,"correct":29},"6200",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},1257237,"下列不属于措施项目清单编制依据的是（ ）。",[519,521,522,524],{"key":20,"text":520,"correct":22},"拟建工程的施工技术方案",{"key":24,"text":432,"correct":29},{"key":27,"text":523,"correct":22},"招标文件",{"key":31,"text":525,"correct":22},"有关的施工规范",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":27,"analysis":33},1257238,"设有围护结构不垂直于水平面而超出底板外沿的建筑物，层高在（ ）m及以上者应计算全面积。",[530,531,532,533],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":29},{"key":31,"text":81,"correct":22},{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},1257239,"（ ）活动涵盖施工招标、合同管理以及竣工交付全过程。",[538,539,541,543],{"key":20,"text":484,"correct":29},{"key":24,"text":540,"correct":22},"工程定额计价",{"key":27,"text":542,"correct":22},"招标控制价",{"key":31,"text":544,"correct":22},"项目交易过程",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":27,"analysis":33},1257240,"固定资产投资在数量上就等于建设项目的（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"建设投资",{"key":24,"text":552,"correct":22},"流动资金",{"key":27,"text":554,"correct":29},"工程造价",{"key":31,"text":556,"correct":22},"工程费用",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":27,"analysis":33},1257241,"单层建筑物高度在（ ）m及以上者应计算全面积。",[561,562,563,564],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":29},{"key":31,"text":81,"correct":22},{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":27,"analysis":33},1257242,"CAD绘图中，若要在标注文字时插入“±”符号，则应输入的字符是（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"%%w",{"key":24,"text":572,"correct":22},"％％d",{"key":27,"text":574,"correct":29},"％％p",{"key":31,"text":576,"correct":22},"%%s",[578,581,584,587,590,593],{"id":15,"name":579,"category":7,"favorite":580},"领导干部任职前廉政法规知识测试题",92,{"id":582,"name":583,"category":7,"favorite":15},595,"建筑结构与设备",{"id":585,"name":586,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":588,"name":589,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":591,"name":592,"category":7,"favorite":8},534,"BIM工程师",{"id":594,"name":592,"category":7,"favorite":8},535]