[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-841-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},841,"(土建施工)基础知识","建筑工程",0,6,50,1496,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,404,416,428,440,452,464,476,488,500,512,524,536,548,560,572,584,596,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1257042,1,"单选题","下列对楼梯的叙述正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","楼梯是联系上下层的垂直交通设施",true,{"key":24,"text":25,"correct":26},"B","建筑中采用最多的是预制钢筋砼楼梯",false,{"key":28,"text":29,"correct":26},"C","楼梯是施工中要求较低的构件",{"key":31,"text":32,"correct":26},"D","任何情况下螺旋楼梯都不能作为疏散楼梯使用","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1257043,"机电类成产车间多采用（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"砖混结构单层厂房",{"key":24,"text":41,"correct":26},"排架结构单层厂房",{"key":28,"text":43,"correct":22},"钢架结构单层厂房",{"key":31,"text":45,"correct":26},"混凝土结构单层厂房",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1257044,"关于抗震缝说法不正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"抗震缝不可以代替沉降缝。",{"key":24,"text":53,"correct":26},"抗震缝应沿建筑的全高设置。",{"key":28,"text":55,"correct":22},"一般情况下抗震缝以基础断开设置。",{"key":31,"text":57,"correct":26},"建筑物相邻部分的结构刚度和质量相差悬殊时应设置抗震缝。",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1257045,"下列关于屋顶的叙述正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"屋顶是房屋最上部的外围护构件",{"key":24,"text":65,"correct":26},"屋顶排水方式常用无组织排水",{"key":28,"text":67,"correct":26},"屋顶承受其上部的各种荷载，但是对房屋没有水平支撑作用",{"key":31,"text":69,"correct":26},"屋顶结构形式对屋顶坡度没有影响",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1257046,"散水的宽度一般为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"300～500mm",{"key":24,"text":77,"correct":26},"500～800mm",{"key":28,"text":79,"correct":22},"600～1000mm",{"key":31,"text":81,"correct":26},"800～1000mm",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1257047,"砌体结构中，6、7度时钢筋混凝土圈梁中的纵向钢筋不少于（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"4φ8",{"key":24,"text":89,"correct":22},"4φ10",{"key":28,"text":91,"correct":26},"4φ12",{"key":31,"text":93,"correct":26},"4φ14",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1257048,"建筑物伸缩缝的宽度一般为（ ）mm。",[98,100,102,104],{"key":20,"text":99,"correct":26},"10～20",{"key":24,"text":101,"correct":26},"10～30",{"key":28,"text":103,"correct":22},"20～30",{"key":31,"text":105,"correct":26},"20～40",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1257049,"大跨度工业厂房应用（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"钢筋混凝土楼板",{"key":24,"text":113,"correct":22},"压型钢板组合楼板",{"key":28,"text":115,"correct":26},"木楼板",{"key":31,"text":117,"correct":26},"竹楼板",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1257050,"下列关于涂饰工程基层处理做法，错误的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"新建筑物的混凝土基层在涂饰前应涂刷抗碱封闭底漆",{"key":24,"text":125,"correct":22},"新建筑物的抹灰基层在涂饰涂料后应涂刷抗碱封闭底漆",{"key":28,"text":127,"correct":26},"旧墙面在涂饰涂料前应清除疏松的旧装修层，并涂刷界面剂",{"key":31,"text":129,"correct":26},"基层腻子应刮实、磨平达到牢固、无粉化、起皮和裂缝。",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1257051,"计算构件各钢筋的直线下料长度、根数及重量，编出钢筋配料单，属于（ ）工作。",[134,136,138,140],{"key":20,"text":135,"correct":26},"钢筋备料",{"key":24,"text":137,"correct":22},"钢筋配料",{"key":28,"text":139,"correct":26},"钢筋加工",{"key":31,"text":141,"correct":26},"钢筋绑扎",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1257052,"下列深基坑工程挖土方案中，属于无支护结构挖土的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"放坡挖土",{"key":24,"text":149,"correct":26},"中心岛式挖土",{"key":28,"text":151,"correct":26},"盆式挖土",{"key":31,"text":153,"correct":26},"逆作挖土",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1257053,"在涂膜防水屋面施工的工艺流程中，清理基层的紧后工作是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"特殊部位处理",{"key":24,"text":161,"correct":22},"涂布基层处理剂",{"key":28,"text":163,"correct":26},"涂膜防水层施工",{"key":31,"text":165,"correct":26},"保护层施工",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1257054,"砖砌体留直槎时应加设拉结筋，拉结筋沿墙高每（ ）mm设一层。",[170,172,174,176],{"key":20,"text":171,"correct":26},"300",{"key":24,"text":173,"correct":22},"500",{"key":28,"text":175,"correct":26},"700",{"key":31,"text":177,"correct":26},"1000",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1257055,"回灌井点应布置在降水井的外围，两者之间的水平距离不得小于（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"4m",{"key":24,"text":185,"correct":26},"5m",{"key":28,"text":187,"correct":22},"6m",{"key":31,"text":189,"correct":26},"7m",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1257056,"下列关于钢结构安装施工要点的说法中，正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"钢构件拼装前应检查清除飞边、毛刺、焊接飞溅物，摩擦面应保持干燥、整洁，采取相应防护措施后，可在雨中作业",{"key":24,"text":197,"correct":26},"螺栓应能自由穿入孔内，不能自由穿入时，可采用气割扩孔",{"key":28,"text":199,"correct":22},"起吊事先将钢构件吊离地面50cm左右，使钢构件中心对准安装位置中心",{"key":31,"text":201,"correct":26},"高强度螺栓可兼作安装螺栓",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1257057,"地下工程防水卷材的设置与施工最宜采用（ ）法。",[206,208,210,212],{"key":20,"text":207,"correct":22},"外防外贴",{"key":24,"text":209,"correct":26},"外防内贴",{"key":28,"text":211,"correct":26},"内防外贴",{"key":31,"text":213,"correct":26},"内防内贴",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1257058,"钢结构的连接方法不包括（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"绑扎连接",{"key":24,"text":221,"correct":26},"焊接",{"key":28,"text":223,"correct":26},"螺栓连接",{"key":31,"text":225,"correct":26},"铆钉连接",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1257059,"相邻基坑开挖时，应遵循（ ）或同时进行的施工程序。",[230,232,234,236],{"key":20,"text":231,"correct":26},"先大后小",{"key":24,"text":233,"correct":26},"先远后近",{"key":28,"text":235,"correct":22},"先深后浅",{"key":31,"text":237,"correct":26},"先浅后深",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1257060,"相同种类和级别的钢筋，现场代换的原则是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"等面积代换",{"key":24,"text":245,"correct":26},"等应力代换",{"key":28,"text":247,"correct":26},"等强度代换",{"key":31,"text":249,"correct":26},"等间距代换",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1257061,"下列关于毛石砌体施工工艺的基本规定中，有误的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"毛石料和粗石料砌体的灰缝厚度不宜大于10mm，细石料砌体的灰缝厚度不宜小于10mm",{"key":24,"text":257,"correct":26},"施工工艺流程为：施工准备→试排撂底→砌筑毛石（同时搅拌砂浆）→勾缝→检验评定",{"key":28,"text":259,"correct":26},"每日砌筑高度不宜超过1.2m，在转角处及交接处应同时砌筑，如不能同时砌筑时，应留斜槎",{"key":31,"text":261,"correct":26},"毛石挡土墙一般按3～4皮为一个分层高度砌筑，每砌一个分层高度应找平一次",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1257062,"下列关于木门窗施工工艺的说法中，正确的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"木门窗施工的施工工艺流程为：找规矩弹线→安装门窗框→门窗框嵌缝→安装门窗扇→安装五金（玻璃）→成品保护",{"key":24,"text":269,"correct":26},"门窗安装前，应在离楼地面900mm高的墙面上测弹一条水平控制线",{"key":28,"text":271,"correct":26},"外门窗一般采用与墙面抹灰相同的砂浆将门窗框与洞口的缝隙塞实",{"key":31,"text":273,"correct":26},"安装门窗扇时，将扇放入框中试装合格后，按扇高的1\u002F10～1\u002F14，在框上按合页大小画线，并剔出合页槽，槽深一定要与合页厚度相适应，槽底要平",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1257063,"混凝土在运输时如有离析现象，则必须在浇筑前进行（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":26},"加水",{"key":24,"text":281,"correct":22},"二次搅拌",{"key":28,"text":283,"correct":26},"加水泥",{"key":31,"text":285,"correct":26},"振捣",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1257064,"普通硅酸盐水泥配制的混凝土，若采用洒水养护，养护时间不少于（ ）d。",[290,292,294,296],{"key":20,"text":291,"correct":26},"3",{"key":24,"text":293,"correct":22},"7",{"key":28,"text":295,"correct":26},"14",{"key":31,"text":297,"correct":26},"28",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1257065,"下列属于造成水磨石地面空鼓原因的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"底层未清理干净，未能洒水湿润透，刷素水泥浆不到位",{"key":24,"text":305,"correct":26},"水泥强度等级不够",{"key":28,"text":307,"correct":26},"水灰比过大",{"key":31,"text":309,"correct":26},"滚压遍数不够",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},1257066,"混凝土浇水养护的时间：对采用硅酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥拌制的混凝土，不得少于（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"7d",{"key":24,"text":317,"correct":26},"10d",{"key":28,"text":319,"correct":26},"5d",{"key":31,"text":321,"correct":26},"14d",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},1257067,"当屋面坡度小于3％时，防水卷材的铺设方向宜（ ）铺设。",[326,328,330,332],{"key":20,"text":327,"correct":26},"垂直于屋脊",{"key":24,"text":329,"correct":22},"平行于屋脊",{"key":28,"text":331,"correct":26},"平行或垂直于屋脊",{"key":31,"text":333,"correct":26},"从高处向低处",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1257068,"下列关于钢筋混凝土扩展基础混凝土浇筑的基本规定，错误的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":26},"混凝土宜分段分层浇筑，每层厚度不超过500mm",{"key":24,"text":341,"correct":22},"混凝土自高处倾落时，其自由倾落高度不宜超过3m，如高度超过3m，应设料斗、漏斗、串筒、斜槽、溜管，以防止混凝土产生分层离析",{"key":28,"text":343,"correct":26},"各层各段间应相互衔接，每段长2～3m，使逐段逐层呈阶梯形推进",{"key":31,"text":345,"correct":26},"混凝土应连续浇筑，以保证结构良好的整体性",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1257069,"关于基础大体积混凝土、设备基础分层浇筑顺序的说法，正确的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"从低处开始，沿长边方向自一端向另一端浇筑",{"key":24,"text":353,"correct":26},"从低处开始，沿短边方向自一端向另一端浇筑",{"key":28,"text":355,"correct":26},"从高处开始，沿长边方向自一端向另一端浇筑",{"key":31,"text":357,"correct":26},"从高处开始，沿短边方向自一端向另一端浇筑",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},1257070,"有主次梁的楼板，宜顺着次梁的方向浇筑，其施工缝应留设在次梁跨度中间、（ ）范围内。",[362,364,366,368],{"key":20,"text":363,"correct":26},"1\u002F5",{"key":24,"text":365,"correct":26},"1\u002F4",{"key":28,"text":367,"correct":22},"1\u002F3",{"key":31,"text":369,"correct":26},"1\u002F2",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1257071,"下列关于石材和木地板楼地面铺设施工的说法中，有误的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":26},"根据地面标筋铺找平层，找平层起到控制标高和粘结面层的作用",{"key":24,"text":377,"correct":22},"按设计要求用1:1～1:3干硬性水泥砂浆，在地面均匀铺一层厚度为20～30mm的干硬性水泥砂浆",{"key":28,"text":379,"correct":26},"空铺式一般用于平房、底层房屋或较潮湿地面以及地面敷设管道需要将木地板架空等情况",{"key":31,"text":381,"correct":26},"搁栅式实铺木地板的施工工艺流程为：基层处理→安装木搁栅→钉毛地板→弹线、铺钉硬木地板、钉踢脚板→刨光、打磨→油漆",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":28,"analysis":33},1257072,"深基坑开挖过程中或开挖后，要做好（ ）施工和维护，防止边坡失稳。",[386,388,390,392],{"key":20,"text":387,"correct":26},"土方工程",{"key":24,"text":389,"correct":26},"地下室",{"key":28,"text":391,"correct":22},"支护结构",{"key":31,"text":393,"correct":26},"降水工程",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":28,"analysis":33},1257073,"浇筑钢筋混凝土阶梯形独立基础时，每一台阶高度内应整层作为一个浇筑层，每浇灌一台阶应稍停（ ）min，使其初步获得沉实，再浇筑上层。",[398,399,400,402],{"key":20,"text":99,"correct":26},{"key":24,"text":103,"correct":26},{"key":28,"text":401,"correct":22},"30～60",{"key":31,"text":403,"correct":26},"60～90",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":31,"analysis":33},1257074,"采用一次投料法在投料斗中投料时，正确的投料顺序是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":26},"砂、石、水泥",{"key":24,"text":411,"correct":26},"水泥、砂、石",{"key":28,"text":413,"correct":26},"砂、水泥、石",{"key":31,"text":415,"correct":22},"石、水泥、砂",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":31,"analysis":33},1257075,"在混凝土工程中，配制有抗渗要求的混凝土可优先选用（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":26},"硅酸盐水泥",{"key":24,"text":423,"correct":26},"矿渣水泥",{"key":28,"text":425,"correct":26},"粉煤灰水泥",{"key":31,"text":427,"correct":22},"火山灰水泥",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},1257077,"砌体结构所用的材料主要有（ ）等块材和砂浆。",[432,434,436,438],{"key":20,"text":433,"correct":26},"型钢、木枋、砖",{"key":24,"text":435,"correct":22},"砖、砌块、石材",{"key":28,"text":437,"correct":26},"混凝土砌块、钢板、陶瓷",{"key":31,"text":439,"correct":26},"玻璃、木块、石块",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},1257078,"下列关于预制桩施工的基本规定，正确的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"静力压桩不宜用于地下有较多孤石、障碍物或有4m以上硬隔离层的情况",{"key":24,"text":447,"correct":26},"如遇特殊原因，压桩时可以不连续进行",{"key":28,"text":449,"correct":26},"静力压桩的施工工艺流程：测量放线→桩机就位、吊桩、插桩、桩身对中调直→静压沉桩→接桩→送桩、再静压沉桩→终止压桩→切割桩头",{"key":31,"text":451,"correct":26},"送桩时必须采用送桩器",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},1257079,"基坑开挖中，施工降水和排水一般分为明排水和（ ）降水。",[456,458,460,462],{"key":20,"text":457,"correct":26},"人工抽水",{"key":24,"text":459,"correct":22},"人工井点",{"key":28,"text":461,"correct":26},"人工截水",{"key":31,"text":463,"correct":26},"人工排污",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":28,"analysis":33},1257080,"下列选项中不属于常用施涂方法的是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":26},"刷涂",{"key":24,"text":471,"correct":26},"滚涂",{"key":28,"text":473,"correct":22},"甩涂",{"key":31,"text":475,"correct":26},"喷涂",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":31,"analysis":33},1257081,"钢筋混凝土预制桩在制作过程中，强度需达到设计强度的（ ）时方可运输。",[480,482,484,486],{"key":20,"text":481,"correct":26},"30％",{"key":24,"text":483,"correct":26},"40％",{"key":28,"text":485,"correct":26},"70％",{"key":31,"text":487,"correct":22},"100%",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":28,"analysis":33},1257082,"关于混凝土构件施工缝的留设位置，下列说法不正确的是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":26},"柱应留在基础的顶面、梁或吊车梁牛腿的下面、无梁楼盖柱帽的下面",{"key":24,"text":495,"correct":26},"双向受力板、拱、薄壳应按设计要求留设",{"key":28,"text":497,"correct":22},"单向板留置在平行于板的长边方向任何位置",{"key":31,"text":499,"correct":26},"有主次梁的留置在次梁跨中的1\u002F3范围内",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":28,"analysis":33},1257083,"下列关于陶瓷地砖楼地面施工的说法中，正确的是（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":26},"湿贴法主要适用于地砖尺寸在500mm×500mm以下的小地砖的铺贴",{"key":24,"text":507,"correct":26},"干贴法应首先在地面上用1:2的干硬性水泥砂浆铺一层厚度为20～50mm的垫层",{"key":28,"text":509,"correct":22},"铺贴前应先进行试拼，试拼后按顺序排列，编号，浸水备用",{"key":31,"text":511,"correct":26},"铺完砖24h后洒水养护，时间不得少于14d",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},1257084,"下列各项中，关于钢筋连接的基本规定不正确的说法是（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":26},"钢筋的连接可分为绑扎连接、焊接和机械连接三种",{"key":24,"text":519,"correct":26},"在任何情况下，纵向受拉钢筋绑扎搭接接头的搭设长度不应小于300mm，纵向受压钢筋的搭接长度不应小于200mm",{"key":28,"text":521,"correct":26},"钢筋机械连接有钢筋套筒挤压连接、钢筋锥螺纹套筒连接、钢筋镦粗直螺纹套筒连接、钢筋滚压直螺纹套筒连接",{"key":31,"text":523,"correct":22},"当受拉钢筋的直径d>22mm及受压钢筋的直径d>25mm时，不宜采用绑扎搭接接头",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1257085,"下列土的工程分类，除（ ）之外，均为岩石。",[528,530,532,534],{"key":20,"text":529,"correct":26},"软石",{"key":24,"text":531,"correct":22},"砂砾坚土",{"key":28,"text":533,"correct":26},"坚石",{"key":31,"text":535,"correct":26},"特坚石",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},1257086,"下列关于砌块砌体施工工艺的基本规定中，错误的是（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":26},"灰缝厚度宜为15mm",{"key":24,"text":543,"correct":22},"灰缝要求横平竖直，水平灰缝应饱满，竖缝采用挤浆和加浆方法，允许用水冲洗清理灌缝",{"key":28,"text":545,"correct":26},"在墙体底部，在砌第一皮加气砖前，应用实心砖砌筑，其高度宜不小于200mm",{"key":31,"text":547,"correct":26},"与梁的接触处待加气砖砌完7d后采用灰砂砖斜砌顶紧",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},1257087,"下列关于涂料防水中防水层施工的说法中，正确的是（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":26},"湿铺法是在铺第三遍涂料涂刷时，边倒料、边涂刷、便铺贴的操作方法",{"key":24,"text":555,"correct":22},"对于流动性差的涂料，为便于抹压，加快施工进度，可以采用分条间隔施工的方法，条带宽800～1000mm",{"key":28,"text":557,"correct":26},"胎体增强材料混合使用时，一般下层采用玻璃纤维布，上层采用聚酯纤维布",{"key":31,"text":559,"correct":26},"所有收头均应用密封材料压边，压扁宽度不得小于20mm",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":31,"analysis":33},1257088,"钢筋套筒连接工艺参数不包括（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":26},"压接顺序",{"key":24,"text":567,"correct":26},"压接力",{"key":28,"text":569,"correct":26},"压接道数",{"key":31,"text":571,"correct":22},"压接时间",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":20,"analysis":33},1257089,"涂料防水施工中，下列保护层不适于在立面使用的是（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"细石混凝土保护层",{"key":24,"text":579,"correct":26},"水泥砂浆保护层",{"key":28,"text":581,"correct":26},"泡沫塑料保护层",{"key":31,"text":583,"correct":26},"砖墙保护层",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":31,"analysis":33},1257090,"下列各项中，关于混凝土拌合料运输过程中一般要求不正确的说法是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":26},"保持其均匀性，不离析、不漏浆",{"key":24,"text":591,"correct":26},"保证混凝土能连续浇筑",{"key":28,"text":593,"correct":26},"运到浇筑地点时应具有设计配合比所规定的坍落度",{"key":31,"text":595,"correct":22},"应在混凝土终凝前浇入模板并捣实完毕",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":28,"analysis":33},1257091,"钢筋混凝土预制桩在制作过程中，强度需达到设计强度的（ ）以上时方可起吊。",[600,601,602,603],{"key":20,"text":481,"correct":26},{"key":24,"text":483,"correct":26},{"key":28,"text":485,"correct":22},{"key":31,"text":604,"correct":26},"100％",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":28,"analysis":33},1257092,"下列关于砖基础的施工工艺的基本规定，错误的是（ ）。",[609,611,613,615],{"key":20,"text":610,"correct":26},"垫层混凝土在验槽后应随即浇灌，以保护地基",{"key":24,"text":612,"correct":26},"砖基础施工工艺流程：测量放线→基坑开挖，验槽→混凝土垫层施工→砖基础砌筑",{"key":28,"text":614,"correct":22},"砖基础中的洞口、管道、沟槽等，应在砌筑时1留出，宽度超过900mm的洞口上方应砌筑平拱或设置过梁",{"key":31,"text":616,"correct":26},"基础砌筑前，应先检查垫层施工是否符合质量要求，在清扫垫层表面，将浮土及垃圾清除干净",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]