[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-841-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},841,"(土建施工)基础知识","建筑工程",0,27,50,1496,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1258110,3,"判断题","放坡开挖是最经济的挖土方案，当基坑开挖深度不大（软土地基挖深不超过4m；地下水位低的图纸较好地区挖深亦可较大）周围环境又允许时，均可采用放坡开挖；放坡坡度按经验确定即可。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1258111,"土方回填压实的施工工艺流程：填方土料处理→基底处理→分层回填压实→对每层回填土的质量进行检验，符合设计要求后，填筑上一层。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1258112,"土钉支护施工时，为确保所喷混凝土层的整体性，禁止将混凝土分层喷射。（ ）",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1258113,"强夯法是利用强大的夯击能，迫使深层土压密，以提高地基承载力，降低其压缩性。（ ）",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1258114,"基坑（槽）开挖施工工艺流程：测量放线→切线分层开挖→排水、降水→修坡→留足预留土层→整平。",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1258115,"建筑施工是指工程建设实施阶段的生产活动，是各类建筑物的建造过程，也是把设计图纸上的各种线条，在指定的地点变成实物的过程。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1258116,"一般抹灰等级可分为基础抹灰和高级抹灰。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1258117,"普通水磨石面层磨光遍数不应少于2遍，高级水磨石面层磨光遍数不应少于3遍。（ ）",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1258118,"混凝土必须养护至其强度达到1.2MPa以上，才准在上面行人和架设支架、安装模板。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1258119,"搅拌时间是指从原材料全部投人搅拌筒时起，到混凝土拌合物全部卸出时所经历的时间。（ ）",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1258120,"砌一砖厚及以上的砖墙必须双面挂线。（ ）",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1258121,"主排水沟最好设置在施工区域的边缘或道路的两旁，一般排水沟的横断面不应小于0.5m×0.5m，纵坡不应小于2‰。",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1258122,"柱钢筋绑扎的施工工艺流程为：调整插筋位置，套入箍筋→立柱子四个角的主筋→立柱内其余主筋→绑扎钢筋接头→将主骨架钢筋绑扎成形。",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":25,"analysis":27},1258123,"普通土的现场鉴别方法为：用镐挖掘。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1258124,"钢筋套筒挤压连接的挤压顺序，应从两端逐步向中间压接。（ ）",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1258125,"根据预制桩入土受力方式又分为打入式和静力压桩式两种。在城市施工中，一半多采用静力桩。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},1258126,"钢筋混凝土扩展基础施工工艺流程：测量放线→基坑开挖、验槽→混凝土垫层施工→支基础模板→钢筋绑扎→浇基础混凝土。",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1258127,"逆作法施工多层地下室时，中间支撑柱所承受的最大荷载，是地下室已修筑至最下一层，而地面上已开始修筑时的荷载。（ ）",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1258128,"抹灰层各层之间必须粘结牢固，无脱皮、空鼓，面层应无爆灰和裂缝。（ ）",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1258129,"一般抹灰的施工工艺流程为：基层处理→阳角做护角→找规矩做灰饼、标筋→抹底层灰、中层灰、面层灰。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1258130,"在施工缝处继续浇筑混凝土时，待已浇筑的混凝土的强度不低于1.2N\u002Fmm时才允许继续浇筑（ ）",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1258131,"梁和板一般同时浇筑，只有当梁高大于1m时才允许将梁单独浇筑。（ ）",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1258132,"基础砖墙墙身水平防潮层应设置在室内地坪以下一皮砖处。（ ）",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1258133,"角度前方交会法是利用两点之间的坐标差值，计算该点的水平位移量。",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1258134,"基础垫层打好后，根据轴线控制桩或龙门板上轴线钉，用经纬仪或拉线吊锤球的方法，把轴线投测到垫层上。（ ）",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1258135,"在进行水准测量前，即抄平前要将水准仪安置在适当位置，一般选在观测两点的其中一点附近，并没有遮挡视线的障碍物。（ ）",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1258136,"白钢板标志法观测裂缝，用两块同样大小的钢板固定在裂缝两侧。",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1258137,"测量坐标系的横轴是x轴，纵轴是Y轴。（ ）",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1258138,"为了减少测量误差，确保观测高差的精度，需要进行测站检核。如在一测站上仪器高度不变，可分别用双面水准尺的黑面和红面两次测定高差来检核。（ ）",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1258139,"吊车梁安装测量主要是保证吊车梁平面位置和吊车梁的标高符合要求。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":25,"analysis":27},1258140,"龙门桩钉设位置在建筑物四角和中间隔墙的两侧距开挖边线约5m处。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1258141,"高层建筑施工测量中的主要问题是控制垂直度的测设精度。（ ）",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1258142,"经纬仪与水准仪在操作过程中，经纬仪只需整平无需对中，水准仪既需整平又需对中。（ ）",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1258143,"在软土地区进行测量放线，水准仪会产生缓慢下沉的现象致使测量误差加大，可以采用“后、前、前、后”重复观测的顺序来减少其影响。（ ）",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1258144,"挠度观测属于变形观测的一种。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},1258145,"施工放线过程中需要共同移交基准点位，不一定都需要办理书面手续。（ ）",[236,237],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1258146,"使用经纬仪进行水平角观测时，秒值读记错误应重新观测。（ ）",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1258147,"吊线坠法是利用钢丝悬挂重锤球的方法，进行轴线竖向投测。（ ）",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1258148,"高程是陆地上任何一点到大地水准面的铅垂距离。（ ）",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1258149,"沉降观测时一般是先后视水准基点，接着依次前视各沉降观测点，然后反过来依次后视各观测点，最后前视水准基点。（ ）",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1258150,"建筑红线是由业主或监理单位测定的建筑用地界定基准线。（ ）",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1258151,"建筑基线应尽可能靠近拟建的主要建筑物，并与其主要轴线平行，以便使用比较简单的直角坐标法进行建筑物的定位。（ ）",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1258152,"当建筑方格网轴线与建筑物轴线平行或垂直时，一般可采用直角坐标法进行建筑物定位。（ ）",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1258153,"烟囱外筒壁收坡控制，是用靠尺板来控制的。（ ）",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1258154,"沉降观测常用的观测方法是水准测量法。",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1258155,"施工放线时，根据基准点线引出正确的横向、纵向控制线和1m线后，原始的基准点线可即行废止。（ ）",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1258156,"在测量放线时，钢卷尺在使用过程中出现刻度脱落、不清楚时，需要重新校验或更换，以保证其准确性。（ ）",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1258157,"施工放线过程中，施工员需要不断重复地进行复核、校正。（ ）",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},1258158,"自动安平水准仪需要使水准仪达到精平状态。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1258159,"水准仪粗略整平的目的是使圆气泡居中。",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]