[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-841-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":739},{"id":5,"name":6,"category":7,"favorite":8},841,"(土建施工)基础知识","建筑工程",0,22,50,1496,[13,38,53,68,82,97,111,126,141,156,171,185,199,213,228,242,256,271,286,301,315,329,343,358,373,387,401,415,430,444,458,472,486,500,514,526,540,554,569,583,598,612,626,640,654,668,682,696,710,725],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1257860,2,"多选题","涂膜防水层严禁在（ ）等情况下施工。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","雨天、雪天",true,{"key":24,"text":25,"correct":26},"B","二级风及以上",false,{"key":28,"text":29,"correct":22},"C","预计涂膜固化前有雨",{"key":31,"text":32,"correct":26},"D","气温低于10℃",{"key":34,"text":35,"correct":22},"E","气温高于35℃","ACE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1257861,"下列关于土方回填压实的基本规定的各项中，正确的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"碎石类土、砂土和爆破石渣（粒径不大于每层铺土后2\u002F3）可作各层填料",{"key":24,"text":45,"correct":26},"人工填土每层虚铺厚度，用人工木夯夯实时不大于25cm，用打夯机械夯实时不大于30cm",{"key":28,"text":47,"correct":22},"铺土应分层进行，每次铺土厚度不大于30～50cm（视所用压实机械的要求而定）",{"key":31,"text":49,"correct":22},"当填方基底为耕植土或松土时，应将基底充分夯实和碾压密实",{"key":34,"text":51,"correct":22},"机械填土时填土程序一般尽量采取横向或纵向分层卸土，以利行驶时初步压实","CDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1257862,"下列关于筏形基础的基本规定的各项中，正确的是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"筏形基础分为梁板式和平板式两种类型，梁板式又分为正向梁板式和反向梁板式",{"key":24,"text":60,"correct":26},"施工工艺流程为：测量放线→基坑支护→排水、降水（或隔水）→基坑开挖，验槽→混凝土垫层施工→支基础模板→钢筋绑扎→浇基础混凝土",{"key":28,"text":62,"correct":26},"回填应由两侧向中间进行，并分层夯实",{"key":31,"text":64,"correct":22},"当采用机械开挖时，应保留200～300mm土层由人工挖除",{"key":34,"text":66,"correct":22},"基础长度超过40m时，宜设置施工缝，缝宽不宜小于80cm","ADE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":36,"analysis":37},1257863,"下列关于模板安装与拆除的基本规定中正确的是（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"同一条拼缝上的U行卡，不宜向同一方向卡紧",{"key":24,"text":75,"correct":26},"钢楞宜采用整根杆件，接头宜错开设置，搭接长度不应小于300mm",{"key":28,"text":77,"correct":22},"模板支设时，采用预组拼方法，可以加快施工速度，提高工效和模板的安装质量，但必须具备相适应的吊装设备和有较大的拼装场地",{"key":31,"text":79,"correct":26},"模板拆除时，当混凝土强度大于1.2N\u002Fm㎡时，应先拆除侧面模板，再拆除承重模板",{"key":34,"text":81,"correct":22},"模板拆除的顺序和方法，应按照配板设计的规定进行，遵循先支后拆，先非承重部位，后承重部位以及自上而下的原则",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1257864,"下列各项中，属于钢筋加工的是（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"钢筋除锈",{"key":24,"text":89,"correct":22},"钢筋调直",{"key":28,"text":91,"correct":22},"钢筋切断",{"key":31,"text":93,"correct":26},"钢筋冷拉",{"key":34,"text":95,"correct":22},"钢筋弯曲成型","ABCE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":96,"analysis":37},1257865,"关于施工缝的留设与处理的说法中，正确的是（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"施工缝宜留在结构受剪力较小且便于施工的部位",{"key":24,"text":104,"correct":22},"柱应留水平缝，梁、板应留垂直缝",{"key":28,"text":106,"correct":22},"在施工缝处继续浇筑混凝土时，应待浇筑的混凝土抗压强度不小于1.2MPa方可进行，以抵抗继续浇筑混凝土的扰动",{"key":31,"text":108,"correct":26},"对施工缝进行处理时，需满铺一层厚20～50mm的水泥浆或与混凝土同水灰比的水泥沙浆，方可继续浇筑混凝土",{"key":34,"text":110,"correct":22},"在施工缝处继续浇筑混凝土时，应将混凝土表面凿毛、清洗、清除水泥浆膜和松动石子或软弱的混凝土层",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1257866,"下列关于木地板楼地面铺设施工的说法中，正确的是（ ）。",[115,117,119,121,123],{"key":20,"text":116,"correct":26},"安装木搁栅要严格做到整间木搁栅面标高一致，用5m直尺检查，空隙不大于3mm",{"key":24,"text":118,"correct":22},"实铺式木地板是指木地板通过木搁栅与基层相连或胶粘剂直接粘贴于基层上，实铺式一般用于2层以上的干燥楼面",{"key":28,"text":120,"correct":26},"铺钉硬木地板先由两边向中央进行，后埔镶边",{"key":31,"text":122,"correct":22},"随刮胶粘剂随铺地板，人员随铺随往后退，要用力推紧、压平，并随即用砂袋等物压6～24h",{"key":34,"text":124,"correct":22},"一般做清漆罩面，涂刷完毕后养护3～5d打蜡，蜡要涂得薄而匀，再用打蜡机擦亮隔1d后就可上人使用","BDE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1257867,"下列关于涂饰工程施工工艺的说法中，有误的是（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":26},"施工工艺流程为：基层处理→打底、批刮腻子→面层施涂→修理",{"key":24,"text":133,"correct":22},"混凝土与抹灰表面在施涂前应将基体或基层的缺棱掉角处、孔洞用1:2的水泥砂浆修补",{"key":28,"text":135,"correct":22},"外墙抗裂弹性腻子修补、填平时，待修补完成后，将抹灰面满刮外墙抗裂弹性腻子一遍，腻子批刮厚度为0.3～0.8mm",{"key":31,"text":137,"correct":22},"面层施涂滚涂大面时，用长度为15～20cm的长辊，以利于提高功效",{"key":34,"text":139,"correct":26},"底漆和乳胶漆施工适宜温度为0℃以上，未用完的底乳胶漆应加盖密封，并存放在阴凉通风处","BCD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1257868,"下列属于套筒（管）式附着升降脚手架的组成部件有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"提升机具",{"key":24,"text":148,"correct":22},"操作平台",{"key":28,"text":150,"correct":26},"扫地杆",{"key":31,"text":152,"correct":22},"套管（套筒或套架）爬杆、横梁",{"key":34,"text":154,"correct":22},"爬杆、横梁","ABDE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1257869,"下列关于钢结构安装施工要点的说法中，有误的是（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"起吊事先将钢构件吊离地面30cm左右，使钢构件中心对准安装位置中心",{"key":24,"text":163,"correct":22},"高强度螺栓上、下接触面处加有1\u002F15以上斜度时应采用垫圈垫平",{"key":28,"text":165,"correct":26},"施焊前，焊工应检查焊接件的接头质量和焊接区域的坡口、间隙、钝边等的处理情况",{"key":31,"text":167,"correct":26},"厚度大于12～20mm的板材，单面焊后，背面清根，再进行焊接",{"key":34,"text":169,"correct":22},"焊道两端加引弧板和熄弧板，引弧和熄弧焊缝长度应大于或等于150mm","ABE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":96,"analysis":37},1257870,"用于振捣密实混凝土拌合物的机械，按其作业方式可分为（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"插入式振动器",{"key":24,"text":178,"correct":22},"表面振动器",{"key":28,"text":180,"correct":22},"振动台",{"key":31,"text":182,"correct":26},"独立式振动器",{"key":34,"text":184,"correct":22},"附着式振动器",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":170,"analysis":37},1257871,"下列关于深基坑土方开挖和基坑支护施工的基本规定中，正确的是（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"放坡开挖是最经济的挖土方案，当基坑开挖深度不大周围环境又允许时，均可采用放坡开挖；放坡坡度经计算确定",{"key":24,"text":192,"correct":22},"土钉墙支护与其他支护方法比较，具有施工操作简便、设备简单、噪声小、工期短、费用低的特点",{"key":28,"text":194,"correct":26},"中心岛（墩）式挖土，宜用于中小型基坑，支护结构的支撑形式为角撑、环梁式或边桁（框）架，中间具有较大空间情况下",{"key":31,"text":196,"correct":26},"土钉墙支护适用于深度较大，面积不大、地基土质较差的基坑",{"key":34,"text":198,"correct":22},"工程开挖土方时，地下连续墙可用作支护结构，既挡土又挡水，地下连续墙还可同时用作建筑物的承重结构",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":155,"analysis":37},1257872,"下列关于钻、挖、冲孔灌注桩施工的基本规定中，表述正确的是（ ）",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"沉渣厚度要小于100mm，清孔验收合格后，要立即放入钢筋笼",{"key":24,"text":206,"correct":22},"用导管开始浇筑混凝土时，管口至孔底的距离为300～500mm，第一次浇筑时，导管要埋入混凝土下0.8m以上，以后浇筑时，导管埋深亦未宜为2～6m",{"key":28,"text":208,"correct":26},"钢筋笼检查无误后要马上浇筑混凝土，间隔时间不能超过6小时",{"key":31,"text":210,"correct":22},"浇筑混凝土时必须采用溜槽，当落距超过2m时，应采用串筒，串筒末端距孔底高度不大于2m，随浇随摘，也可采用导管泵送",{"key":34,"text":212,"correct":22},"每日开工前必须检测井下的有毒有害气体，当桩孔开挖深度超过8m时，要有专门向井下送风的设备，并做好井下的排水工作。",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},1257873,"下列属于常用人工地基处理方法的有（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":26},"排水灌浆法",{"key":24,"text":220,"correct":22},"换填法",{"key":28,"text":222,"correct":22},"重锤夯实法",{"key":31,"text":224,"correct":22},"化学加固法",{"key":34,"text":226,"correct":22},"挤密桩法","BCDE",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":36,"analysis":37},1257874,"在多层建筑墙身砌筑过程中，为了保证建筑物轴线位置正确，可用（ ）将基础或首层墙面上的标志轴线投测到各施工楼层上。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"吊锤球",{"key":24,"text":235,"correct":26},"水准仪",{"key":28,"text":237,"correct":22},"经纬仪",{"key":31,"text":239,"correct":26},"测距仪",{"key":34,"text":241,"correct":22},"全站仪",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":125,"analysis":37},1257875,"变形观测的主要内容包括（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":26},"刚度观测",{"key":24,"text":249,"correct":22},"位移观测",{"key":28,"text":251,"correct":26},"强度观测",{"key":31,"text":253,"correct":22},"倾斜观测",{"key":34,"text":255,"correct":22},"裂缝观测",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":270,"analysis":37},1257876,"观测周期和观测时间应根据（ ）的变化情况而定。",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"工程的性质",{"key":24,"text":263,"correct":22},"施工进度",{"key":28,"text":265,"correct":22},"地基基础",{"key":31,"text":267,"correct":22},"基础荷载",{"key":34,"text":269,"correct":26},"地基变形特征","ABCD",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":285,"analysis":37},1257877,"经纬仪对中的基本方法有（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"光学对点器对中",{"key":24,"text":278,"correct":22},"垂球对中",{"key":28,"text":280,"correct":26},"目估对中",{"key":31,"text":282,"correct":26},"物镜对中",{"key":34,"text":284,"correct":26},"目镜对中","AB",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":300,"analysis":37},1257878,"杯形基础立模测量的工作主要有（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"基础垫层打好后，根据基坑周边定位小木桩，用拉线吊锤球的方法，把柱基定位线投测到垫层上，弹出墨线，用红漆画出标记，作为柱基立模板和布置基础钢筋的依据",{"key":24,"text":293,"correct":22},"立模时，将模板底线对准垫层上的定位线，并用锤球检查模板是否垂直",{"key":28,"text":295,"correct":22},"将柱基顶面设计标高测设在模板内壁，作为浇灌混凝土的高度依据",{"key":31,"text":297,"correct":26},"柱安装标高需要在浇筑基础混凝土前予以校正控制",{"key":34,"text":299,"correct":26},"柱安装位置控制线需要标记在基础芯模内壁","ABC",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":155,"analysis":37},1257879,"建筑基线是建筑场地的施工控制基准线，它的布设要求主要包括（ ）。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"建筑基线应尽可能靠近拟建的主要建筑物，并与其主要轴线平行",{"key":24,"text":308,"correct":22},"建筑基线上的基线点应不少于三个，以便相互检核",{"key":28,"text":310,"correct":26},"除关键基点要埋设永久性的混凝土桩外，多数基线点采用临时木桩",{"key":31,"text":312,"correct":22},"基线点位应选在通视良好和不易被破坏的地方",{"key":34,"text":314,"correct":22},"建筑基线应尽可能与施工场地的建筑红线相连系",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":300,"analysis":37},1257880,"建筑物变形观测的主要内容有（ ）",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"建筑物沉降观测",{"key":24,"text":322,"correct":22},"建筑物倾斜观测",{"key":28,"text":324,"correct":22},"建筑物裂缝观测",{"key":31,"text":326,"correct":26},"角度观测",{"key":34,"text":328,"correct":26},"A和B",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":270,"analysis":37},1257881,"民用建筑施工测量的主要任务有（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"建筑物的定位和放线",{"key":24,"text":336,"correct":22},"基础工程施工测量",{"key":28,"text":338,"correct":22},"墙体工程施工测量",{"key":31,"text":340,"correct":22},"高层建筑施工测量",{"key":34,"text":342,"correct":26},"角度测量",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":357,"analysis":37},1257882,"下列关于建筑物高程控制的说法，符合规定的有（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"建筑物高程控制，应采用水准测量。",{"key":24,"text":350,"correct":22},"附合路线闭合差，不应低于四等水准测量的要求。",{"key":28,"text":352,"correct":26},"水准点可设置在平面控制网的标桩或外围的固定地物上，不可单独埋设。",{"key":31,"text":354,"correct":22},"当场地高程控制点距离施工建筑物小于200m时，可直接利用",{"key":34,"text":356,"correct":26},"水准点的个数，不应少于4个","ABD",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":372,"analysis":37},1257883,"水平位移观测的方法（ ）。",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"角度前方交会法",{"key":24,"text":365,"correct":26},"石膏板标志法",{"key":28,"text":367,"correct":26},"白钢板标志法",{"key":31,"text":369,"correct":22},"基准线法",{"key":34,"text":371,"correct":26},"水准测量法","AD",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":170,"analysis":37},1257884,"测距仪可以完成（ ）等测量工作。",[377,379,381,383,385],{"key":20,"text":378,"correct":22},"距离",{"key":24,"text":380,"correct":22},"面积",{"key":28,"text":382,"correct":26},"高度",{"key":31,"text":384,"correct":26},"角度",{"key":34,"text":386,"correct":22},"体积",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":125,"analysis":37},1257885,"以下对轴线控制桩法叙述正确的有（ ）。",[391,393,395,397,399],{"key":20,"text":392,"correct":26},"可以控制标高",{"key":24,"text":394,"correct":22},"可以控制轴线位置",{"key":28,"text":396,"correct":26},"与龙门板法相比机械化施工时易破坏",{"key":31,"text":398,"correct":22},"轴线控制桩一般设置在基槽外2?4m处",{"key":34,"text":400,"correct":22},"轴线可以投测到附件的建筑物",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":372,"analysis":37},1257886,"建筑物施工放线时恢复轴线位置的方法有（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"设置轴线控制桩",{"key":24,"text":408,"correct":26},"基槽抄平",{"key":28,"text":410,"correct":26},"设置角桩",{"key":31,"text":412,"correct":22},"设置龙门板",{"key":34,"text":414,"correct":26},"线坠引测",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":429,"analysis":37},1257887,"工程测量时确定地面点位的基本工作有（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"水平角测量",{"key":24,"text":422,"correct":26},"垂直角测量",{"key":28,"text":424,"correct":22},"水平距离测量",{"key":31,"text":426,"correct":22},"高差测量",{"key":34,"text":428,"correct":26},"变形测量","ACD",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":270,"analysis":37},1257888,"墙体施工测量时，二层以上楼层标高传递可以采用（ ）。",[434,436,438,440,442],{"key":20,"text":435,"correct":22},"水准测量方法沿楼梯间传递到各层",{"key":24,"text":437,"correct":22},"利用外墙皮数杆传递",{"key":28,"text":439,"correct":22},"利用钢尺直接丈量",{"key":31,"text":441,"correct":22},"悬吊钢尺法",{"key":34,"text":443,"correct":26},"经纬仪投测法",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":270,"analysis":37},1257889,"柱子安装测量应重点注意的事项有（ ）。",[448,450,452,454,456],{"key":20,"text":449,"correct":22},"所使用的经纬仪必须严格校正，操作时，应使照准部水准管气泡严格居中",{"key":24,"text":451,"correct":22},"校正时，除注意柱子垂直外，还应随时检查柱子中心线是否对准杯口柱列轴线标志，以防柱子安装就位后产生水平位移",{"key":28,"text":453,"correct":22},"在校正变截面的柱子时，经纬仪必须安置在柱列轴线上，以免产生差错",{"key":31,"text":455,"correct":22},"在日照下校正柱子的垂直度时，应考虑日照使柱顶向阴面弯曲的影响，为避免此种影响，宜在早晨或阴天校正",{"key":34,"text":457,"correct":26},"实际安装时，只有将一根柱子竖起来并校正后，才能继续下一根柱子的竖立与垂直度校正工作",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":67,"analysis":37},1257890,"经纬仪使用步骤（ ）。",[462,464,466,468,470],{"key":20,"text":463,"correct":22},"仪器的安置",{"key":24,"text":465,"correct":26},"对中",{"key":28,"text":467,"correct":26},"粗略整平",{"key":31,"text":469,"correct":22},"照准目标",{"key":34,"text":471,"correct":22},"读数",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":227,"analysis":37},1257891,"关于利用测回法观测水平角的叙述，说法正确的有（ ）。",[476,478,480,482,484],{"key":20,"text":477,"correct":26},"仪器可以不对中，但必须整平",{"key":24,"text":479,"correct":22},"上半测回必须顺时针观测，下半测回必须逆时针观测",{"key":28,"text":481,"correct":22},"观测的测回数越多，观测水平角的精度就越高",{"key":31,"text":483,"correct":22},"测回法观测水平角的方法适用于一个测站上只有2个目标的观测",{"key":34,"text":485,"correct":22},"为了削弱度盘刻划误差对水平角的影响，各测回之间须按180°\u002Fn变换度盘的位置",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":300,"analysis":37},1257892,"施工测量贯穿于整个施工过程，其主要内容包括（ ）。",[490,492,494,496,498],{"key":20,"text":491,"correct":22},"在施工前建立施工控制网",{"key":24,"text":493,"correct":22},"熟悉设计图纸，按设计和施工要求进行放样",{"key":28,"text":495,"correct":22},"检查并验收，每道工序完成后应进行测量检查",{"key":31,"text":497,"correct":26},"签订施工项目合同后踏勘施工现场，编制施工组织设计",{"key":34,"text":499,"correct":26},"施工前进行技术交底",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":270,"analysis":37},1257893,"沉降观测时，沉降观测点的点位宜选设在下列（ ）位置。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"框架结构建筑物的每个或部分柱基上",{"key":24,"text":507,"correct":22},"高低层建筑物纵横墙交接处的两侧",{"key":28,"text":509,"correct":22},"建筑物的四角",{"key":31,"text":511,"correct":22},"筏片基础四角处及其中部位置",{"key":34,"text":513,"correct":26},"建筑物沿外墙每2～5m处",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":525,"analysis":37},1257894,"水准仪使用步骤（ ）。",[518,519,520,521,523],{"key":20,"text":463,"correct":22},{"key":24,"text":465,"correct":26},{"key":28,"text":467,"correct":22},{"key":31,"text":522,"correct":22},"瞄准目标",{"key":34,"text":524,"correct":22},"精平","ACDE",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":539,"analysis":37},1257895,"我国国家规定以山东青岛市验潮站所确定的黄海常年平均海水面，作为我国计算高程的基准面。陆地上任何一点到此大地水准面的铅垂距离，就称为（ ）。",[530,532,534,536,538],{"key":20,"text":531,"correct":22},"高程",{"key":24,"text":533,"correct":26},"标高",{"key":28,"text":535,"correct":22},"海拔",{"key":31,"text":537,"correct":26},"高差",{"key":34,"text":382,"correct":26},"AC",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":429,"analysis":37},1257896,"在多层建筑施工中，要由下层向上层传递高程，一般采用（ ）来保证楼板面高度准确。",[544,546,548,550,552],{"key":20,"text":545,"correct":22},"利用皮数杆传递高程",{"key":24,"text":547,"correct":26},"水准仪传递高差",{"key":28,"text":549,"correct":22},"垂吊钢尺用水准仪法",{"key":31,"text":551,"correct":22},"利用钢尺自首层高程基准线直接丈量",{"key":34,"text":553,"correct":26},"吊锤球自首层控制线引测",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":568,"analysis":37},1257897,"关于工程测量偶然误差特性的说法，正确的有（ ）。",[558,560,562,564,566],{"key":20,"text":559,"correct":26},"在一定观测条件下，超出误差限值的误差出现概率接近零",{"key":24,"text":561,"correct":22},"偶然误差绝对值相等的正负误差出现概率相同",{"key":28,"text":563,"correct":22},"同一量的等精度观测，其偶然误差的算术平均值随着观测次数的增大而趋于零",{"key":31,"text":565,"correct":26},"偶然误差不具有抵偿性",{"key":34,"text":567,"correct":22},"偶然误差绝对值小的误差比绝对值较大的误差出现的概率大","BCE",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":67,"analysis":37},1257898,"全站仪除能自动测距、测角外，还能快速完成的工作，包括（ ）。",[573,575,577,579,581],{"key":20,"text":574,"correct":22},"计算平距、高差",{"key":24,"text":576,"correct":26},"计算二维坐标",{"key":28,"text":578,"correct":26},"按垂直角和距离进行放样测量",{"key":31,"text":580,"correct":22},"按坐标进行放样",{"key":34,"text":582,"correct":22},"将任一方向的水平角置为0°00′00″",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":597,"analysis":37},1257899,"下列不是措施项目费的是（ ）。",[587,589,591,593,595],{"key":20,"text":588,"correct":26},"安全文明施工费",{"key":24,"text":590,"correct":22},"工程排污费",{"key":28,"text":592,"correct":26},"已完工程及设备保护费",{"key":31,"text":594,"correct":26},"脚手架工程费",{"key":34,"text":596,"correct":22},"固定资产使用费","BE",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":525,"analysis":37},1257900,"工程定额计价方法与工程量清单计价方法的区别（ ）。",[602,604,606,608,610],{"key":20,"text":603,"correct":22},"编制工程量的主体不同",{"key":24,"text":605,"correct":26},"合同价格不同",{"key":28,"text":607,"correct":22},"单价与报价的组成不同",{"key":31,"text":609,"correct":22},"计价依据不同",{"key":34,"text":611,"correct":22},"适用阶段不同",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":300,"analysis":37},1257901,"暂估价是指招标人在工程量清单中提供的用于支付必然发生但暂时不能确定价格的项目，一般包括（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":22},"材料暂估单价",{"key":24,"text":619,"correct":22},"工程设备暂估单价",{"key":28,"text":621,"correct":22},"专业工程暂估价",{"key":31,"text":623,"correct":26},"规费",{"key":34,"text":625,"correct":26},"税金",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":125,"analysis":37},1257902,"根据《建筑安装工程费用项目组成》，按照费用构成要素划分，建筑安装工程费包括人工费、材料费、（ ）、规费、税金。",[630,632,634,636,638],{"key":20,"text":631,"correct":26},"措施项目费",{"key":24,"text":633,"correct":22},"施工机具使用费",{"key":28,"text":635,"correct":26},"分部分项工程费",{"key":31,"text":637,"correct":22},"企业管理费",{"key":34,"text":639,"correct":22},"利润",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":96,"analysis":37},1257903,"税金项目清单中涵盖的内容包括（ ）。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"教育费附加",{"key":24,"text":647,"correct":22},"营业税",{"key":28,"text":649,"correct":22},"城市维护建设税",{"key":31,"text":651,"correct":26},"车船使用税",{"key":34,"text":653,"correct":22},"地方教育费附加",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":525,"analysis":37},1257904,"计算建筑面积的作用，具体包括（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"确定建设规模的重要指标",{"key":24,"text":661,"correct":26},"确定工程材料消耗量",{"key":28,"text":663,"correct":22},"计算有关分项工程量的依据",{"key":31,"text":665,"correct":22},"选择概算指标和编制概算的主要依据",{"key":34,"text":667,"correct":22},"确定各项技术经济指标的基础",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":96,"analysis":37},1257905,"工程造价基本构成（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":22},"设备及工器具购置费",{"key":24,"text":675,"correct":22},"建筑安装工程费",{"key":28,"text":677,"correct":22},"工程勘察设计费",{"key":31,"text":679,"correct":26},"流动资金",{"key":34,"text":681,"correct":22},"购置土地费",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":300,"analysis":37},1257906,"建筑面积是指建筑物的水平平面面积，建筑面积包括（ ）。",[686,688,690,692,694],{"key":20,"text":687,"correct":22},"使用面积",{"key":24,"text":689,"correct":22},"辅助面积",{"key":28,"text":691,"correct":22},"结构面积",{"key":31,"text":693,"correct":26},"其他面积",{"key":34,"text":695,"correct":26},"赠送面积",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":140,"analysis":37},1257907,"工程量清单计价的适用范围（ ）。",[700,702,704,706,708],{"key":20,"text":701,"correct":26},"私企资金投资的大中型建设工程",{"key":24,"text":703,"correct":22},"国有资金投资的工程建设项目",{"key":28,"text":705,"correct":22},"国家融资资金投资的工程建设项目",{"key":31,"text":707,"correct":22},"国有资金为主的工程建设项目",{"key":34,"text":709,"correct":26},"私企资金投资为主的工程建设工程",{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":724,"analysis":37},1257908,"工程量清单计价的作用（ ）。",[714,716,718,720,722],{"key":20,"text":715,"correct":22},"提供一个平等的竞争条件",{"key":24,"text":717,"correct":22},"满足市场经济条件下竞争的需要",{"key":28,"text":719,"correct":22},"有利于提高工程计价效率",{"key":31,"text":721,"correct":22},"有利于工程款的拨付和工程造价的最终结算",{"key":34,"text":723,"correct":22},"有利于业主对投资的控制","ABCDE",{"id":726,"libraryId":5,"type":15,"typeLabel":16,"stem":727,"options":728,"answer":155,"analysis":37},1257909,"计算工业与民用建筑的建筑面积总的规则中，应计算建筑面积的是（ ）。",[729,731,733,735,737],{"key":20,"text":730,"correct":22},"在结构上、使用上形成具有一定使用功能的建筑物",{"key":24,"text":732,"correct":22},"在结构上、使用上形成具有一定使用功能的构筑物",{"key":28,"text":734,"correct":26},"不能单独计算出其水平面积",{"key":31,"text":736,"correct":22},"能单独计算出其相应消耗的人工、材料和机械用量的",{"key":34,"text":738,"correct":22},"能单独计算出其水平面积",[740,744,747,750,753,756],{"id":741,"name":742,"category":7,"favorite":743},1,"领导干部任职前廉政法规知识测试题",92,{"id":745,"name":746,"category":7,"favorite":741},595,"建筑结构与设备",{"id":748,"name":749,"category":7,"favorite":741},715,"招标采购专业知识与法律法规",{"id":751,"name":752,"category":7,"favorite":741},848,"市政方向-通用基础",{"id":754,"name":755,"category":7,"favorite":8},534,"BIM工程师",{"id":757,"name":755,"category":7,"favorite":8},535]