[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258188":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1258188,841,3,"判断题","根据《建设工程工程量清单计价规范》GB50500，在计量单位中，没有具体数量的项目，可以用“项”、“宗”不等表示。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"根据《建设工程工程量清单计价规范》GB50500，在计量单位中，没有具体数量的项目，可以用“项”、“宗”不等表示。",{"id":6,"name":21,"category":22,"favorite":23},"(土建施工)基础知识","建筑工程",0]