[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1258155":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1258155,841,3,"判断题","施工放线时，根据基准点线引出正确的横向、纵向控制线和1m线后，原始的基准点线可即行废止。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"施工放线时，根据基准点线引出正确的横向、纵向控制线和1m线后，原始的基准点线依然保留。",{"id":6,"name":21,"category":22,"favorite":23},"(土建施工)基础知识","建筑工程",0]