[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1257715":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1257715,841,1,"单选题","平法施工图中框架梁的平面注写包括集中标注与原位标注。当梁某项数值的集中标注与原位标注不一致时，施工时（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","集中标注取值优先",false,{"key":16,"text":17,"correct":18},"B","原位标注取值优先",true,{"key":20,"text":21,"correct":14},"C","根据需要决定优先顺序",{"key":23,"text":24,"correct":14},"D","没有优先顺序","集中标注的梁编号及截面尺寸、配筋等代表许多跨，表达梁的通用数值；原位标注的要素仅代表本跨，当集中标注的某项数值不适用于梁的某部位时，则将该数值原位标注，施工时原位标注取值优先",{"id":6,"name":27,"category":28,"favorite":29},"(土建施工)基础知识","建筑工程",0]