[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1257706":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1257706,841,1,"单选题","建筑平面中，水平方向的轴线自左至右用（ ）依次连续编号。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","阿拉伯数字",true,{"key":16,"text":17,"correct":18},"B","大写拉丁字母",false,{"key":20,"text":21,"correct":18},"C","希腊字母",{"key":23,"text":24,"correct":18},"D","俄文字母","建筑平面中，水平方向的轴线自左至右用阿拉伯数字1.2.3……依次连续编号。",{"id":6,"name":27,"category":28,"favorite":29},"(土建施工)基础知识","建筑工程",0]