[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1257652":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1257652,841,1,"单选题","设计变更不得降低建筑节能效果。当设计变更涉及建筑节能效果时，应经（ ）审查。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设单位",false,{"key":16,"text":17,"correct":14},"B","原施工图设计单位",{"key":19,"text":20,"correct":14},"C","监理单位",{"key":22,"text":23,"correct":24},"D","原施工图设计审查机构",true,"设计变更不得降低建筑节能效果。当设计变更涉及建筑节能效果时，应经原施工图设计审查机构审查，在实施前应办理设计变更手续，并获得监理或建设单位的确认。",{"id":6,"name":27,"category":28,"favorite":29},"(土建施工)基础知识","建筑工程",0]