[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1257594":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1257594,841,1,"单选题","大体积混凝土浇筑体里表温差、降温速率及环境潟麼乃沮磨府弯的测试，在混凝土浇筑后l一4天，每（ ）不应少于1次。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","4h",true,{"key":16,"text":17,"correct":18},"B","8h",false,{"key":20,"text":21,"correct":18},"C","10b",{"key":23,"text":24,"correct":18},"D","12h","大体积混凝土浇筑体里表温差、降温速率及环境温度及温度应变的测试，在混凝土浇筑后1-4天，每4h不应少于1次；5-7天，每8h不应少于1次；7天后，每12h不应少于1次，直至测温结束。",{"id":6,"name":27,"category":28,"favorite":29},"(土建施工)基础知识","建筑工程",0]