[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1257577":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1257577,841,1,"单选题","大体积混凝土采用整体分层浇筑时，层间最长的间歇时间为",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","不大于混凝土初凝时间",true,{"key":16,"text":17,"correct":18},"B","不小于混凝土初凝时间；",false,{"key":20,"text":21,"correct":18},"C","不大于混凝土终凝时间",{"key":23,"text":24,"correct":18},"D","不小于混凝土终凝时间","大体积混凝土工程施工宜采用整体分层连续浇筑施工或推移式连续浇筑施工。连续浇筑时应缩短间歇时间，并在前层混凝土初凝之前将次层混凝土浇筑完毕。层间最长的间歇时间不应大于混凝土初凝时间。",{"id":6,"name":27,"category":28,"favorite":29},"(土建施工)基础知识","建筑工程",0]