[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1257533":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1257533,841,1,"单选题","下列描述的施工顺序确定原则中的顺序正确的是",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工艺合理.保证质量.安全施工.充分利用工作面.缩短工期.",true,{"key":16,"text":17,"correct":18},"B","充分利用工作面.保证质量.安全施工.工艺合理.缩短工期.",false,{"key":20,"text":21,"correct":18},"C","工艺合理.安全施工.充分利用工作面.保证质量.缩短工期.",{"key":23,"text":24,"correct":18},"D","工艺合理.充分利用工作面.安全施工.保证质量.缩短工期.","施工顺序的确定原则：工艺合理、保证质量、安全施工、充分利用工作面、缩短工期。",{"id":6,"name":27,"category":28,"favorite":29},"(土建施工)基础知识","建筑工程",0]