[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1257190":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1257190,841,1,"单选题","当建筑物上埋设的沉降观测点稳固后，在（ ）进行第一次沉降观测。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建筑物竣工当天",false,{"key":16,"text":17,"correct":14},"B","建筑物竣工后30d",{"key":19,"text":20,"correct":14},"C","建筑物主体结构完成时",{"key":22,"text":23,"correct":24},"D","建筑物主体结构开工前",true,"当建筑物上埋设的沉降观测点稳固后，在建筑物主体结构开工前进行第一次沉降观测。",{"id":6,"name":27,"category":28,"favorite":29},"(土建施工)基础知识","建筑工程",0]