[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1257134":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":21,"analysis":24},1257134,841,1,"单选题","基础施工结束后，应检查基础顶面标高与设计标高的偏差，规范允许误差为（ ）mm。",[11,15,18,20],{"key":12,"text":13,"correct":14},"A","-5",false,{"key":16,"text":17,"correct":14},"B","-10",{"key":19,"text":17,"correct":14},"C",{"key":21,"text":22,"correct":23},"D","土10",true,"基础施工结束后，应检查基础面的标高是否符合设计要求。可用水准仪测出基础面上若干点的高程，并与设计高程相比较，允许误差为±10mm。",{"id":6,"name":26,"category":27,"favorite":28},"(土建施工)基础知识","建筑工程",0]