[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1257059":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1257059,841,1,"单选题","相邻基坑开挖时，应遵循（ ）或同时进行的施工程序。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","先大后小",false,{"key":16,"text":17,"correct":14},"B","先远后近",{"key":19,"text":20,"correct":21},"C","先深后浅",true,{"key":23,"text":24,"correct":14},"D","先浅后深","相邻基坑开挖时，应遵循先深后浅或同时进行的施工程序。",{"id":6,"name":27,"category":28,"favorite":29},"(土建施工)基础知识","建筑工程",0]