[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,9,50,812,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,392,404,415,426,438,446,458,470,481,493,505,517,529,541,553,565,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1256378,1,"单选题","未搞清地质情况就仓促开工；边设计边施工；无图施工；不经竣工验收就交付使用等，这是施工项目质量问题的（ ）原因。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","违反建设程序",true,{"key":24,"text":25,"correct":26},"B","违反法律法规行为",false,{"key":28,"text":29,"correct":26},"C","设计与施工不到位",{"key":31,"text":32,"correct":26},"D","施工与管理不到位","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1256379,"市政管道工程平面图通常采用的比例不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1：30",{"key":24,"text":41,"correct":26},"1：20",{"key":28,"text":43,"correct":26},"1：10",{"key":31,"text":45,"correct":26},"1：5",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1256380,"主梁是桥梁的主要承重结构，主梁结构图中主要表达主梁的形状、构造和尺寸的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"钢筋构造图",{"key":24,"text":53,"correct":22},"一般构造图",{"key":28,"text":55,"correct":26},"结构构造图",{"key":31,"text":57,"correct":26},"混凝土构造图",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1256381,"材料运输应建立和健全（ ）为中心的运输管理制度。",[62,64,66,68],{"key":20,"text":63,"correct":22},"岗位责任制",{"key":24,"text":65,"correct":26},"奖惩制度",{"key":28,"text":67,"correct":26},"运输工作流程",{"key":31,"text":69,"correct":26},"节约制度",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1256382,"某市政道路桥梁工程施工项目，承包人建立了以项目总工第一责任人的质量管理体系，监理单位也建立了相应的质量建立体系。项目施工完后，报请政府相关机构进行质量验收时，遭受拒绝。 本项目出现的质量事故属于（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"一般质量事故",{"key":24,"text":77,"correct":22},"严重质量事故",{"key":28,"text":79,"correct":26},"重大质量事故",{"key":31,"text":81,"correct":26},"特大质量事故",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1256383,"关于沉井制作施工安全技术交底的内容，下列说法正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"接高沉井必须与除土作业同步进行，在沉井偏斜情况下严禁接高沉井",{"key":24,"text":89,"correct":26},"沉井侧模应在混凝土强度达到25%时方可拆除，刃脚模板应在混凝土强度达到50％时方可拆除",{"key":28,"text":91,"correct":22},"拆除支垫时的混凝土强度应满足设计规定的抽垫要求",{"key":31,"text":93,"correct":26},"沉井制作场地筑岛标高应高出施工期间可能出现的最高水位2m以上",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1256384,"关于路基工程填土施工安全技术交底的内容，下列说法正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"换填路基土应按照本交底挖土、土方运输、填土等相关要求进行施工",{"key":24,"text":101,"correct":26},"路基外侧为挡土墙时，应先施工路基",{"key":28,"text":103,"correct":22},"填土路基为土边坡时，每侧填土宽度应大于设计宽度50cm",{"key":31,"text":105,"correct":26},"路基下有管线时，管顶以上100cm范围内不得用压路机碾压",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1256385,"关于水泥混凝土路面工程拌合混凝土施工安全技术交底的内容，下列说法正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"居民区附近，宜采用机械拌合混凝土，不宜采用预拌混凝土",{"key":24,"text":113,"correct":26},"乡镇和村镇附近，宜采用机械拌合混凝土，不宜采用预拌混凝土",{"key":28,"text":115,"correct":26},"现场应按设计要求布置混凝土搅拌机、各种料仓和原材料输送、计量装置",{"key":31,"text":117,"correct":22},"平台、支架、储料仓的强度、刚度、稳定性应满足搅拌站拌合水泥混凝土过程中荷载的要求",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1256386,"桩基分部工程交底应由（ ）编写。",[122,124,126,128],{"key":20,"text":123,"correct":26},"技术负责人",{"key":24,"text":125,"correct":22},"施工员",{"key":28,"text":127,"correct":26},"质检员",{"key":31,"text":129,"correct":26},"资料员",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1256387,"施工图交底和会审应有文字记录，交底后由（ ）整理会议纪要，经参会各方会签后，作为施工依据。",[134,136,138,140],{"key":20,"text":135,"correct":26},"建设单位",{"key":24,"text":137,"correct":26},"设计单位",{"key":28,"text":139,"correct":26},"监理单位",{"key":31,"text":141,"correct":22},"施工单位",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1256388,"经纬仪整平的目的是（ ）处于铅垂位置。",[146,148,150,152],{"key":20,"text":147,"correct":22},"仪器竖轴",{"key":24,"text":149,"correct":26},"仪器横轴",{"key":28,"text":151,"correct":26},"仪器管轴",{"key":31,"text":153,"correct":26},"视线",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1256389,"道路纵断面图是通过道路中心线用假想的（ ）进行剖切展平后获得的。",[158,160,162,164],{"key":20,"text":159,"correct":26},"水平面",{"key":24,"text":161,"correct":26},"正平面",{"key":28,"text":163,"correct":26},"斜平面",{"key":31,"text":165,"correct":22},"铅垂面",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1256390,"关于道路基层工程安全技术交底的内容，下列说法正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"石灰土类结构道路，应选用块状石灰",{"key":24,"text":173,"correct":26},"五级以上风力不得进行现场人工拌合石灰，作业人员可站在下风口",{"key":28,"text":175,"correct":22},"集中拌合基层材料时，机具设备支架及其基础应进行受力验算，其强度、刚度、稳定性应满足机具运行的安全要求",{"key":31,"text":177,"correct":26},"人工摊铺基层材料应由项目经理统一指挥，协调摊铺人员和运料车辆与碾压机械操作工的相互配合关系",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1256391,"建设工程项目质量控制的基本方法是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"三阶段控制原理",{"key":24,"text":185,"correct":22},"PDCA循环原理",{"key":28,"text":187,"correct":26},"三全控制管理",{"key":31,"text":189,"correct":26},"三完善控制原理",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1256392,"道路交叉工程图指的是（ ）工程图。",[194,196,198,200],{"key":20,"text":195,"correct":26},"平面交叉口",{"key":24,"text":197,"correct":26},"立体交叉口",{"key":28,"text":199,"correct":22},"平面交叉口和立体交叉口",{"key":31,"text":201,"correct":26},"平面交叉口、立体交叉口和绿化交叉口",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1256393,"铁路运输的优点有（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"投资低",{"key":24,"text":209,"correct":26},"建设周期短",{"key":28,"text":211,"correct":22},"运输能力大",{"key":31,"text":213,"correct":26},"能耗较高",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1256394,"桥台一般构造图通常用（ ）表示。",[218,220,222,224],{"key":20,"text":219,"correct":26},"立面图",{"key":24,"text":221,"correct":26},"平面图",{"key":28,"text":223,"correct":26},"轴侧图",{"key":31,"text":225,"correct":22},"立面图、平面图和侧面图",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1256395,"水准仪产生视差的原因是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"观测时视线位置不正确",{"key":24,"text":233,"correct":26},"水准尺倾斜",{"key":28,"text":235,"correct":26},"前后视距不相等",{"key":31,"text":237,"correct":22},"物像与十字丝分划板平面不重合",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1256396,"道路平面图是应用（ ）的方法绘制的。",[242,244,246,248],{"key":20,"text":243,"correct":22},"正投影",{"key":24,"text":245,"correct":26},"中心投影",{"key":28,"text":247,"correct":26},"斜投影",{"key":31,"text":249,"correct":26},"轴侧投影",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1256397,"用全站仪进行距离或坐标测量前，需设置正确的大气改正数，设置的方法可以是直接输人测量时的气温和（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":26},"湿度",{"key":24,"text":257,"correct":22},"气压",{"key":28,"text":259,"correct":26},"高程",{"key":31,"text":261,"correct":26},"风力",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},1256398,"关于水泥混凝土路面工程混凝土浇筑与养护安全技术交底的内容，下列说法正确的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"混凝土泵车作业时产生的污水，应及时排置人河道",{"key":24,"text":269,"correct":26},"混凝土采用汽车运输时，道路宽度不宜小于1.5m",{"key":28,"text":271,"correct":22},"现场预留的雨水口、检查井等洞口必须盖牢，并设安全标志",{"key":31,"text":273,"correct":26},"沥青的勺、桶、壶应采用锡焊",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1256399,"下列关于施工过程质量验收不合格处理描述错误的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":26},"在检验批验收时，发现存在严重缺陷的应推到重做",{"key":24,"text":281,"correct":22},"在检验批验收时，有一般的缺陷通过反修或更换消除缺陷后，应不做再验收",{"key":28,"text":283,"correct":26},"严重质量缺陷或超过检验批范围内的缺陷，经法定检测单位检测鉴定以后，认为不能满足最低限度的安全储备和使用功能，则必须进行加固处理",{"key":31,"text":285,"correct":26},"通过返修或加固处理后仍不能满足安全使用要求的分部工程严禁验收",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},1256400,"经纬仪的管水准器和圆水准器整平仪器的精确度关系为（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"管水准精度高",{"key":24,"text":293,"correct":26},"圆水准精度高",{"key":28,"text":295,"correct":26},"精确度相同",{"key":31,"text":297,"correct":26},"无关联性",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":28,"analysis":33},1256401,"桥梁钢筋混凝土构件的钢筋结构图包括（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"一般构造图和钢筋构造图",{"key":24,"text":305,"correct":26},"一般构造图和钢筋布置图",{"key":28,"text":307,"correct":22},"钢筋布置图和钢筋成型图",{"key":31,"text":309,"correct":26},"一般构造图和钢筋成型图",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},1256402,"关于沥青混合料路面透层油与粘层油施工安全技术交底的内容，下列说法正确的（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"现场需明火熬制沥青时，应编制专项安全技术措施，并经项目经理批准",{"key":24,"text":317,"correct":26},"沥青混合料运输道路应坚实、平整，宽度不宜小于1.5m",{"key":28,"text":319,"correct":26},"沥青试喷时，前方5m内不得有人",{"key":31,"text":321,"correct":22},"油管装载不满时，应始终保持中速行驶",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":31,"analysis":33},1256403,"施工现场与管理缺陷有关的危险源有安全教育培训不够、没有安全操作规程或规程不健全、（ ）等。",[326,328,330,332],{"key":20,"text":327,"correct":26},"作业场所杂乱",{"key":24,"text":329,"correct":26},"施工场地环境不良",{"key":28,"text":331,"correct":26},"危房内作业",{"key":31,"text":333,"correct":22},"对现场工作缺乏检查或指导错误",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1256404,"接地体可用角钢，钢管不少于（ ）根，人土深度不小于（ ）m，两根接地体间距不小于（ ）m，接地电阻不大于（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":26},"两，1，5.0，4",{"key":24,"text":341,"correct":22},"两，2，2.5，4",{"key":28,"text":343,"correct":26},"两，3，3.0，2",{"key":31,"text":345,"correct":26},"三，4，2.0，2",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},1256405,"施工现场物的不安全状态包括危房内作业，设备、设施、工具、附件有缺陷、（ ）等。",[350,352,354,356],{"key":20,"text":351,"correct":26},"未佩戴呼吸护具",{"key":24,"text":353,"correct":26},"不安全装束",{"key":28,"text":355,"correct":26},"构配件存放不当",{"key":31,"text":357,"correct":22},"安全帽、安全带有缺陷",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},1256406,"《临时用电安全技术规范》规定，当临时用电设备（ ）台或（ ）kW，施工单位应当编制临时用电施工组织设计。",[362,364,366,368],{"key":20,"text":363,"correct":26},"≥5；≤50",{"key":24,"text":365,"correct":26},"≤5；≤50",{"key":28,"text":367,"correct":22},"≥5；≥50",{"key":31,"text":369,"correct":26},"≥50；≥50",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1256408,"安全生产六大纪律中规定，（ ）m以上的高处、悬空作业、无安全设施的，必须系好安全带、扣好保险钩。",[374,376,378,380],{"key":20,"text":375,"correct":22},"2",{"key":24,"text":377,"correct":26},"3",{"key":28,"text":379,"correct":26},"4",{"key":31,"text":381,"correct":26},"5",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":28,"analysis":33},1256409,"施工现场与管理缺陷有关的危险源有安全教育培训不够、劳动组织不合理、（ ）等。",[386,388,389,391],{"key":20,"text":387,"correct":26},"设备防护装置调整不当",{"key":24,"text":329,"correct":26},{"key":28,"text":390,"correct":22},"没有安全操作规程或规程不健全",{"key":31,"text":327,"correct":26},{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":24,"analysis":33},1256410,"安全技术措施交底的基本要求不包括（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":26},"技术交底必须具体、明确，针对性强",{"key":24,"text":399,"correct":22},"对设计隐私进行个别交底",{"key":28,"text":401,"correct":26},"技术交底的内容应针对分部分项工程施工中给作业人员带来的潜在危害和存在问题",{"key":31,"text":403,"correct":26},"保持书面安全技术交底签字记录",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},1256411,"施工现场与管理缺陷有关的危险源有违规分包或转包工程、安全教育培训不够、（ ）等。",[408,409,411,413],{"key":20,"text":387,"correct":26},{"key":24,"text":410,"correct":22},"劳动组织不合理",{"key":28,"text":412,"correct":26},"照明光线不足",{"key":31,"text":414,"correct":26},"结构不合安全要求",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},1256412,"电焊工作地点（ ）m以内不得有易燃、易爆材料。",[419,421,423,425],{"key":20,"text":420,"correct":26},"10",{"key":24,"text":422,"correct":26},"8",{"key":28,"text":424,"correct":26},"6",{"key":31,"text":381,"correct":22},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},1256413,"工地行驶的斗车、小平车的轨道坡度不得大于（ ），铁轨终点应有车挡，车辆的制动闸和挂钩要完好可靠。",[430,432,434,436],{"key":20,"text":431,"correct":26},"2%",{"key":24,"text":433,"correct":22},"3％",{"key":28,"text":435,"correct":26},"4％",{"key":31,"text":437,"correct":26},"5％",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},1256414,"如遇风力在（ ）级以上的恶劣天气影响施工安全时，禁止进行露天高空、起重和打桩作业。",[442,443,444,445],{"key":20,"text":377,"correct":26},{"key":24,"text":379,"correct":26},{"key":28,"text":381,"correct":26},{"key":31,"text":424,"correct":22},{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},1256415,"施工现场应有不少于（ ）个出口或坡道，长距离施工应适当增加出人口的数量。",[450,452,454,456],{"key":20,"text":451,"correct":26},"一",{"key":24,"text":453,"correct":22},"两",{"key":28,"text":455,"correct":26},"三",{"key":31,"text":457,"correct":26},"四",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":31,"analysis":33},1256416,"某工地正在进行下水道工程的窨井砌砖作业，当时有6名砖瓦工在深达5m的无槽壁支撑的沟槽中施工，1名砖瓦工在地面休息。突然，地面休息的工人发现沟槽有不明水冒出，同时沟槽坍塌，沟槽边堆高达1.8m的土方下滑，急忙向沟底工人发出塌方危险信号，沟底6名工人向不同方向逃逸，其中5人幸免于难，1人被埋在土中，露出胳膊。5人见状忙用手挖土将人救出，同时报告现场负责人。该负责人立即调来运土翻斗车送伤者去医院抢救，因不知道最近的医院地址，用了近40皿n时间才送达。经医院检查，伤者因窒息时间过长已经死亡。施工负责人忙于接待死者家属，等到第3天才想起通知上级主管部门，等事故调查组接到拖延的事故报告到达现场时窨井已砌好，事故现场已面目全非。 对安全责任事故，应做到“四不放过”，即事故原因不清楚不放过等，不包括（ ）。",[462,464,466,468],{"key":20,"text":463,"correct":26},"没有制定防范措施不放过",{"key":24,"text":465,"correct":26},"事故责任者和员工没有受过教育不放过",{"key":28,"text":467,"correct":26},"事故责任者没有处理不放过",{"key":31,"text":469,"correct":22},"没有罚款不放过",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},1256417,"仓库或堆料场内，应根据灭火对象的特性，分组布置酸碱、泡沫、清水、二氧化碳等灭火器。每组灭火器不少于4个，每组灭火器之间的距离不大于（ ）m。",[474,475,477,479],{"key":20,"text":420,"correct":26},{"key":24,"text":476,"correct":26},"20",{"key":28,"text":478,"correct":22},"30",{"key":31,"text":480,"correct":26},"200",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":31,"analysis":33},1256418,"安全教育培训要体现（ ）的原则，覆盖施工现场的所有人员，贯穿于从施工准备、到竣工交付的各个阶段和方面，通过动态控制，确保只有经过安全教育的人员才能上岗。",[485,487,489,491],{"key":20,"text":486,"correct":26},"安全第一，预防为主",{"key":24,"text":488,"correct":26},"安全保证体系",{"key":28,"text":490,"correct":26},"安全生产责任制",{"key":31,"text":492,"correct":22},"全方位、全员、全过程",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":20,"analysis":33},1256419,"起重吊装“十不吊”规定不包括（ ）。",[497,499,501,503],{"key":20,"text":498,"correct":22},"风力4级以上不准吊",{"key":24,"text":500,"correct":26},"起重臂和吊起的重物下面有人停留或行走不准吊",{"key":28,"text":502,"correct":26},"钢筋、型钢、管材等细长和多根物件应捆扎牢靠，支点起吊。捆扎不牢不准吊",{"key":31,"text":504,"correct":26},"起重指挥应由技术培训合格的专职人员担任，无指挥或信号不清不准吊",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":28,"analysis":33},1256420,"某工地正在进行下水道工程的窨井砌砖作业，当时有6名砖瓦工在深达5m的无槽壁支撑的沟槽中施工，1名砖瓦工在地面休息。突然，地面休息的工人发现沟槽有不明水冒出，同时沟槽坍塌，沟槽边堆高达1.8m的土方下滑，急忙向沟底工人发出塌方危险信号，沟底6名工人向不同方向逃逸，其中5人幸免于难，1人被埋在土中，露出胳膊。5人见状忙用手挖土将人救出，同时报告现场负责人。该负责人立即调来运土翻斗车送伤者去医院抢救，因不知道最近的医院地址，用了近40皿n时间才送达。经医院检查，伤者因窒息时间过长已经死亡。施工负责人忙于接待死者家属，等到第3天才想起通知上级主管部门，等事故调查组接到拖延的事故报告到达现场时窨井已砌好，事故现场已面目全非。 造成本次事故物的不安全状态不包括（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":26},"深达5m的沟槽槽壁没有支撑",{"key":24,"text":512,"correct":26},"槽壁渗水",{"key":28,"text":514,"correct":22},"砖未提前浸水",{"key":31,"text":516,"correct":26},"沟槽边堆土高度超标",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":20,"analysis":33},1256421,"起重机吊运砌块时，应采用（ ）吊装工具。",[521,523,525,527],{"key":20,"text":522,"correct":22},"摩擦式砌块夹具",{"key":24,"text":524,"correct":26},"使用上压式砖笼",{"key":28,"text":526,"correct":26},"网式砌块笼",{"key":31,"text":528,"correct":26},"网式砖笼",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":31,"analysis":33},1256422,"环境保护法律的基本原则是（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":26},"军事效益原则",{"key":24,"text":536,"correct":26},"经济效益原则",{"key":28,"text":538,"correct":26},"社会效益原则",{"key":31,"text":540,"correct":22},"污染者付费原则",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":31,"analysis":33},1256423,"乙炔器与氧气瓶间距应大于（ ）m，与明火操作距离应大于（ ）m，不准放在高压线下。",[545,547,549,551],{"key":20,"text":546,"correct":26},"3，3",{"key":24,"text":548,"correct":26},"4，5",{"key":28,"text":550,"correct":26},"5，5",{"key":31,"text":552,"correct":22},"5，10",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":31,"analysis":33},1256424,"属于施工现场物的不安全状态的有设备保养不当、失灵，施工现场环境不良、（ ）等。",[557,559,561,563],{"key":20,"text":558,"correct":26},"使用不安全设备",{"key":24,"text":560,"correct":26},"冒险进人涵洞",{"key":28,"text":562,"correct":26},"未戴护目镜或面罩",{"key":31,"text":564,"correct":22},"坑道掘进、隧道开凿支撑不当",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},1256425,"安全管理体系的建立，必须适用于工程全过程的（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"安全管理与控制",{"key":24,"text":572,"correct":26},"进度管理与控制",{"key":28,"text":574,"correct":26},"成本管理与控制",{"key":31,"text":576,"correct":26},"质量管理与控制",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":28,"analysis":33},1256426,"（ ）时，不需要进行针对性的安全教育。",[581,583,585,587],{"key":20,"text":582,"correct":26},"上岗每",{"key":24,"text":584,"correct":26},"法定节假日前后",{"key":28,"text":586,"correct":22},"工作对象改变",{"key":31,"text":588,"correct":26},"天气变化时",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":28,"analysis":33},1256427,"施工安全用电规范规定的TN-S接零保护系统为（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":26},"三相三线制",{"key":24,"text":596,"correct":26},"三相四线制",{"key":28,"text":598,"correct":22},"三相五线制",{"key":31,"text":600,"correct":26},"单向双线制",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":28,"analysis":33},1256428,"实行施工总承包的，由（ ）统一组织编制建设工程生产安全事故应急救援预案。",[605,606,607,609],{"key":20,"text":135,"correct":26},{"key":24,"text":139,"correct":26},{"key":28,"text":608,"correct":22},"总承包单位",{"key":31,"text":610,"correct":26},"分包单位",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]