[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,8,50,812,[13,34,45,57,69,81,93,105,117,128,140,151,163,175,184,196,208,220,232,244,256,268,280,292,303,315,327,339,349,361,373,385,395,407,419,427,439,450,462,474,486,498,510,522,534,546,558,570,582,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1256328,1,"单选题","钢筋混凝土结构图中，用来表示构件的形状和尺寸，不涉及内部钢筋布置情况的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","平面图",false,{"key":24,"text":25,"correct":22},"B","立面图",{"key":27,"text":28,"correct":22},"C","钢筋结构图",{"key":30,"text":31,"correct":32},"D","一般构造图",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1256329,"在桥梁工程图中，（ ）是根据水文调查和地质钻探所得的资料绘制的桥位所在河流河床位置的地质断面图。",[38,40,41,43],{"key":20,"text":39,"correct":32},"桥位地质断面图",{"key":24,"text":28,"correct":22},{"key":27,"text":42,"correct":22},"桥位平面图",{"key":30,"text":44,"correct":22},"桥梁总体布置图",{"id":46,"libraryId":5,"type":15,"typeLabel":16,"stem":47,"options":48,"answer":20,"analysis":33},1256330,"市政管道工程施工图中，平面图为（ ）。",[49,51,53,55],{"key":20,"text":50,"correct":32},"单线",{"key":24,"text":52,"correct":22},"双线",{"key":27,"text":54,"correct":22},"复线",{"key":30,"text":56,"correct":22},"多线",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":20,"analysis":33},1256331,"某市政道路桥梁工程施工项目，承包人建立了以项目总工第一责任人的质量管理体系，监理单位也建立了相应的质量建立体系。项目施工完后，报请政府相关机构进行质量验收时，遭受拒绝。 施工单位的项目经理部中质量的第一责任人应是（ ）。",[61,63,65,67],{"key":20,"text":62,"correct":32},"项目经理",{"key":24,"text":64,"correct":22},"项目总工",{"key":27,"text":66,"correct":22},"工程部长",{"key":30,"text":68,"correct":22},"质检员",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":27,"analysis":33},1256332,"（ ）不属于质量控制的系统过程。",[73,75,77,79],{"key":20,"text":74,"correct":22},"事前控制",{"key":24,"text":76,"correct":22},"事中控制",{"key":27,"text":78,"correct":32},"事后弥补",{"key":30,"text":80,"correct":22},"事后控制",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":24,"analysis":33},1256333,"自动安平水准仪观测操作步骤是（ ）。",[85,87,89,91],{"key":20,"text":86,"correct":22},"仪器安置→粗平→调焦照准→精平→读数字",{"key":24,"text":88,"correct":32},"仪器安置→粗平→调焦照准→读数字",{"key":27,"text":90,"correct":22},"仪器安置→粗平→调焦照准→读数字→精平",{"key":30,"text":92,"correct":22},"仪器安置→调焦照准→粗平→读数字→精平",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":30,"analysis":33},1256334,"某市政道路桥梁工程施工项目，承包人建立了以项目总工第一责任人的质量管理体系，监理单位也建立了相应的质量建立体系。项目施工完后，报请政府相关机构进行质量验收时，遭受拒绝。 施工项目质量管理体系过程一般可分为工程调研和任务承接、施工准备、材料采购、施工生产以及交工验收和（ ）等八个阶段。",[97,99,101,103],{"key":20,"text":98,"correct":22},"人员管理",{"key":24,"text":100,"correct":22},"设备采购",{"key":27,"text":102,"correct":22},"合同管理",{"key":30,"text":104,"correct":32},"回访与维修",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":20,"analysis":33},1256335,"经纬仪对中误差所引起的角度偏差与测站点到目标点的距离（ ）。",[109,111,113,115],{"key":20,"text":110,"correct":32},"成反比",{"key":24,"text":112,"correct":22},"成正比",{"key":27,"text":114,"correct":22},"没有关系",{"key":30,"text":116,"correct":22},"影响很小",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":30,"analysis":33},1256336,"道路工程图中，沿道路中心线垂直方向的断面图是道路（ ）。",[121,122,124,126],{"key":20,"text":21,"correct":22},{"key":24,"text":123,"correct":22},"纵断面图",{"key":27,"text":125,"correct":22},"交叉工程图",{"key":30,"text":127,"correct":32},"路面结构图",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},1256337,"某道路平面图中，注写有“1K+580”，则该注写表示（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"此点距离道路起点580m",{"key":24,"text":135,"correct":32},"此点距离道路起点1580m",{"key":27,"text":137,"correct":22},"此点距离道路终点580mm",{"key":30,"text":139,"correct":22},"此点距离道路终点1580cm",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":27,"analysis":33},1256338,"当排水管道工程发生设计变更时，应由（ ）对技术交底进行修改或补充，经项目技术负责人审批后重新交底。",[144,146,147,149],{"key":20,"text":145,"correct":22},"施工员",{"key":24,"text":68,"correct":22},{"key":27,"text":148,"correct":32},"原交底人",{"key":30,"text":150,"correct":22},"技术负责人",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},1256339,"关于水泥混凝土路面工程模板施工安全技术交底的内容，下列说法正确的是（ ）。",[155,157,159,161],{"key":20,"text":156,"correct":32},"支模使用的大锤应坚固、安装应牢固，锤顶平整、无飞刺",{"key":24,"text":158,"correct":22},"打锤时，扶钎人员应在打锤人的正面，采用长柄夹具扶钎",{"key":27,"text":160,"correct":22},"模板及其支架的强度、刚度和变形量应满足各施工段荷载的要求",{"key":30,"text":162,"correct":22},"路堑、沟槽边卸料时，据路堑、槽边缘不得小于5m，车轮应挡掩牢固，槽下不得有人",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":33},1256340,"对于建设工程项目的质量控制，需要系统有效地应用（ ）和质量控制的基本原理方法通过各参与方的质量责任和职能活动的实施，达到质量目标的实现。",[167,169,171,173],{"key":20,"text":168,"correct":32},"质量管理",{"key":24,"text":170,"correct":22},"安全管理",{"key":27,"text":172,"correct":22},"技术措施",{"key":30,"text":174,"correct":22},"经济措施",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1256341,"道路工程图中，通过道路中心线用假想的铅垂面进行剖切展平后获得的图样是道路（ ）。",[179,180,181,183],{"key":20,"text":123,"correct":32},{"key":24,"text":21,"correct":22},{"key":27,"text":182,"correct":22},"横断面图",{"key":30,"text":182,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":20,"analysis":33},1256342,"DS3水准仪，数字3表示的意义是每公里往返测高差中数的（ ）误差不超过3mm。",[188,190,192,194],{"key":20,"text":189,"correct":32},"偶然",{"key":24,"text":191,"correct":22},"相对",{"key":27,"text":193,"correct":22},"绝对",{"key":30,"text":195,"correct":22},"平均",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":27,"analysis":33},1256343,"工程质事事故发生后，事故现场有关人员应当亚即向（ ）报告。",[200,202,204,206],{"key":20,"text":201,"correct":22},"项目技术负责人",{"key":24,"text":203,"correct":22},"项目组长",{"key":27,"text":205,"correct":32},"工程建设单位负责人",{"key":30,"text":207,"correct":22},"监理人员",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":20,"analysis":33},1256344,"关于沥青混合料路面工程混合料拌合施工安全技术交底的内容，下列说法正确的是（ ）。",[212,214,216,218],{"key":20,"text":213,"correct":32},"居民区附近，不得设置沥青混合料拌合站",{"key":24,"text":215,"correct":22},"沥青混合料拌合站宜设置在乡镇、村庄附近",{"key":27,"text":217,"correct":22},"施工完成后应及时符合雨水口顶部的高程，确认符合设计规定，路面不积水",{"key":30,"text":219,"correct":22},"平台、支架、储料仓的强度和稳定性应满足搅拌站拌合水泥混凝土过程中荷载的要求",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":24,"analysis":33},1256345,"关于管道强度、严密性试验与冲洗消毒安全技术交底的内容，下列说法正确的（ ）。",[224,226,228,230],{"key":20,"text":225,"correct":22},"放水口上游的排水能力应满足排水要求",{"key":24,"text":227,"correct":32},"管道强度、严密性试验与冲洗消毒前应根据工程特点、现场环境和管理单位的要求编制施工方案",{"key":27,"text":229,"correct":22},"向管道内充水试验过程中，作业人员严禁位于堵板的两侧",{"key":30,"text":231,"correct":22},"闭水试验前，必须完成管道回填",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":20,"analysis":33},1256346,"转动目镜对光螺旋的目的是（ ）。",[236,238,240,242],{"key":20,"text":237,"correct":32},"看清十字丝",{"key":24,"text":239,"correct":22},"看清物像",{"key":27,"text":241,"correct":22},"使视准轴竖直",{"key":30,"text":243,"correct":22},"是十字丝横丝水平",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":20,"analysis":33},1256347,"碗扣式支架用钢管规格为（ ）mm，钢管壁厚不得小于3.5mm。",[248,250,252,254],{"key":20,"text":249,"correct":32},"?48X3.5",{"key":24,"text":251,"correct":22},"?51X3.0",{"key":27,"text":253,"correct":22},"?51X3.5",{"key":30,"text":255,"correct":22},"?60X4.0",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":27,"analysis":33},1256348,"关于灌注桩基础机械钻孔安全技术交底的内容，下列说法正确的是（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"同时钻孔施工的相邻桩孔净距不得小于5m",{"key":24,"text":263,"correct":22},"旱地和浅水域，护筒埋深不宜小于原地面以下5m",{"key":27,"text":265,"correct":32},"旱地区域地基应平整、坚实；浅水区域应采用筑岛方法施工",{"key":30,"text":267,"correct":22},"正、反循环钻机钻孔均应增压钻进",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":30,"analysis":33},1256349,"桥梁平面图中，通常使用（ ）图示钻探孔位及编号。",[272,274,276,278],{"key":20,"text":273,"correct":22},"粗实线",{"key":24,"text":275,"correct":22},"细点画线",{"key":27,"text":277,"correct":22},"双实线",{"key":30,"text":279,"correct":32},"细实线",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":27,"analysis":33},1256350,"大体积混凝土应在环境较低时浇筑，浇筑温度（振捣后50~100mm深处的温度）不宜高于（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"10",{"key":24,"text":287,"correct":22},"20",{"key":27,"text":289,"correct":32},"28",{"key":30,"text":291,"correct":22},"35",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},1256351,"在钢筋结构图中，一般还附有（ ），内容包括钢筋的编号、直径、每根长度、根数、总长及质量等。",[296,298,300,301],{"key":20,"text":297,"correct":22},"钢筋详图",{"key":24,"text":299,"correct":32},"钢筋数量表",{"key":27,"text":25,"correct":22},{"key":30,"text":302,"correct":22},"布置图",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},1256352,"市政管道工程施工图中，压力管道通常标注（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":32},"管道设计中心标高",{"key":24,"text":310,"correct":22},"管内底设计标高",{"key":27,"text":312,"correct":22},"管外底设计标高",{"key":30,"text":314,"correct":22},"管顶设计标高",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":24,"analysis":33},1256353,"关于给排水工程管材吊装与运输安全技术交底的内容，下列说法正确的（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"管材推行速度超过行走速度时，应设专人指挥",{"key":24,"text":322,"correct":32},"装卸管子时，抬运、起落管子应步调一致，放置应均衡",{"key":27,"text":324,"correct":22},"在槽边码放管子时，管子不得与沟槽平行，码放高度不得大于5m，管子距槽边的距离不得小于2m",{"key":30,"text":326,"correct":22},"大雨、大雪、大雾、沙尘暴和三级以上风力的恶劣天气必须停止露天作业",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":24,"analysis":33},1256354,"关于砌体工程安全技术交底的内容，下列说法正确的是（ ）。",[331,333,335,337],{"key":20,"text":332,"correct":22},"施工中，作业人员在砌体行走、站立时，不需要做加固处理",{"key":24,"text":334,"correct":32},"砌体运输使用土坡道应顺直，不宜设弯道",{"key":27,"text":336,"correct":22},"在地下水位以下或处于潮湿土壤中的砌体，应用石灰砂浆砌筑",{"key":30,"text":338,"correct":22},"砌体施工采用附着式振动器时，模板和振动器的安装应坚固牢靠",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":20,"analysis":33},1256355,"微倾式水准仪观测操作步骤是（ ）。",[343,344,346,347],{"key":20,"text":86,"correct":32},{"key":24,"text":345,"correct":22},"仪器安置→粗平→精平→调焦照准→读数字",{"key":27,"text":90,"correct":22},{"key":30,"text":348,"correct":22},"仪器安置→调焦照准→粗平→精平→读数字",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":30,"analysis":33},1256356,"关于排水（重力流）管道安装与铺设施工安全技术交底的内容，下列说法正确的（ ）。",[353,355,357,359],{"key":20,"text":354,"correct":22},"管径大于600mm时，作业人员应使用安全梯上下管子，严禁从沟槽底或从沟槽帮上的安全梯爬、跳至管顶",{"key":24,"text":356,"correct":22},"管径小于2000mm时，人不宜进人管道内清理，需要进人时，应采用行走灵活的轮式工具小车",{"key":27,"text":358,"correct":22},"稳管作业，管子两侧作业人员必须通视",{"key":30,"text":360,"correct":32},"采用电熔连接的塑料管接口，熔接面应洁净、干燥",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":20,"analysis":33},1256357,"下列影响施工质量的生产要素中，只能通过采取预测预防的控制方法以消除其对施工质量不利影响的是（ ）。",[365,367,369,371],{"key":20,"text":366,"correct":32},"环境因素",{"key":24,"text":368,"correct":22},"施工人员",{"key":27,"text":370,"correct":22},"机具设备",{"key":30,"text":372,"correct":22},"施工机械",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":20,"analysis":33},1256358,"微倾式水准仪精平是通过转动（ ），使水准管气泡居中来达到目的。",[377,379,381,383],{"key":20,"text":378,"correct":32},"微倾螺旋",{"key":24,"text":380,"correct":22},"脚螺旋",{"key":27,"text":382,"correct":22},"制动螺旋",{"key":30,"text":384,"correct":22},"水平螺旋",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":27,"analysis":33},1256359,"转动物镜对光螺旋的目的是（ ）。",[389,390,391,393],{"key":20,"text":241,"correct":22},{"key":24,"text":239,"correct":22},{"key":27,"text":392,"correct":32},"使物像位于十字丝分划板面上",{"key":30,"text":394,"correct":22},"使望远镜对准目标",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":24,"analysis":33},1256360,"关于灌注桩基础钢筋骨架安全技术交底的内容，下列说法正确的是（ ）。",[399,401,403,405],{"key":20,"text":400,"correct":22},"钢筋笼吊装就位后，作业人员方可离开现场",{"key":24,"text":402,"correct":32},"大雪、大雾、大雨、沙尘暴和风力六级（含）以上等恶劣天气，不得进露天钢筋笼吊运施工",{"key":27,"text":404,"correct":22},"钢筋骨架吊运长度不超过20m时，应采取竖向临时加固措施",{"key":30,"text":406,"correct":22},"骨架完成竖向焊接后，起重机方可摘钩、松绳",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},1256361,"市政管道工程施工图中，重力管道标注（ ）标高。",[411,413,415,417],{"key":20,"text":412,"correct":22},"管道设计中心",{"key":24,"text":414,"correct":32},"管底设计",{"key":27,"text":416,"correct":22},"管顶设计",{"key":30,"text":418,"correct":22},"管道施工标高",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},1256362,"道路基层技术交底，应经（ ）审批。",[423,424,425,426],{"key":20,"text":62,"correct":22},{"key":24,"text":201,"correct":32},{"key":27,"text":145,"correct":22},{"key":30,"text":68,"correct":22},{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":30,"analysis":33},1256363,"关于沉入桩基础施工安全技术交底的内容，下列说法正确的是（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"混凝土桩的堆放层数不宜超过1层",{"key":24,"text":434,"correct":22},"混凝土桩支点应与吊点在一条水平直线上",{"key":27,"text":436,"correct":22},"预制混凝土桩起吊时的强度应符合设计规定，设计无规定时，混凝土应达到设计强度的50％以上",{"key":30,"text":438,"correct":32},"沉桩过程中发现贯入度发生突变，应暂停施工，经采取措施确认安全后，方可继续沉桩",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":27,"analysis":33},1256364,"道路平面图中，规划红线常用（ ）表示。",[443,444,446,448],{"key":20,"text":277,"correct":22},{"key":24,"text":445,"correct":22},"虚线",{"key":27,"text":447,"correct":32},"双点画线",{"key":30,"text":449,"correct":22},"点画线",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1256365,"自动安平水准仪精平时用的是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":32},"自动补偿装置",{"key":24,"text":457,"correct":22},"管水准器",{"key":27,"text":459,"correct":22},"圆水准器",{"key":30,"text":461,"correct":22},"自动水准器",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1256366,"钢筋连接的接头宜设置在（ ）处。",[466,468,470,472],{"key":20,"text":467,"correct":22},"任意位置",{"key":24,"text":469,"correct":32},"受力较小",{"key":27,"text":471,"correct":22},"受力较大",{"key":30,"text":473,"correct":22},"伸缩缝处",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},1256367,"人工挖土作业时，两人横向间距不得小于（ ）m，纵向间距不得小于（ ）m。",[478,480,482,484],{"key":20,"text":479,"correct":22},"1：2",{"key":24,"text":481,"correct":32},"2：3",{"key":27,"text":483,"correct":22},"2：4",{"key":30,"text":485,"correct":22},"3：6",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},1256368,"隧道内掘土作业时，必须按照安全技术交底要求操作，严禁（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":22},"少挖",{"key":24,"text":493,"correct":32},"超挖",{"key":27,"text":495,"correct":22},"快挖",{"key":30,"text":497,"correct":22},"慢挖",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},1256369,"质量管理的核心是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":32},"建立有效的质量管理体系",{"key":24,"text":505,"correct":22},"确定质量方针和目标",{"key":27,"text":507,"correct":22},"质量策划、质量控制、质量保证和质量改进",{"key":30,"text":509,"correct":22},"确保质量方针、目标的实施和实现",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":30,"analysis":33},1256370,"某工程进行检验批验收时，发现某框架梁截面尺寸与原设计图纸尺寸不符，但经原设计单位核算，仍能满足结构安全及使用功能要求，则该检验批（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"必须重新施工",{"key":24,"text":517,"correct":22},"必须经施工单位和业主协商确定是否予以验收，其经济责任由业主承担",{"key":27,"text":519,"correct":22},"必须进行加固处理后重新组织验收",{"key":30,"text":521,"correct":32},"可直接予以验收",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},1256371,"下列选项中，不属于全站仪的常规测量模式的是（ ）测量模式。",[526,528,530,532],{"key":20,"text":527,"correct":22},"角度",{"key":24,"text":529,"correct":32},"方位",{"key":27,"text":531,"correct":22},"距离",{"key":30,"text":533,"correct":22},"坐标",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":30,"analysis":33},1256372,"关于水泥混凝土路面工程混凝土运输安全技术交底的内容，下列说法正确的（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":22},"人行便桥宽不得小于1.5m",{"key":24,"text":541,"correct":22},"手推车便桥宽度不得小于50cm",{"key":27,"text":543,"correct":22},"汽车便桥宽度不得小于1.5m",{"key":30,"text":545,"correct":32},"便桥两侧必须设不低于1.2m的防护栏杆",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":27,"analysis":33},1256373,"关于灌注桩基础水下混凝土浇筑施工安全技术交底的内容，下列说法正确的（ ）。",[550,552,554,556],{"key":20,"text":551,"correct":22},"大雨、大雪、大雾、沙尘暴和风力。级（含）以上等恶劣天气，不得进行露天导管吊运施工",{"key":24,"text":553,"correct":22},"在浇筑水下混凝土前，必须采取防止导管进水和柱塞、埋管、坍孔的措施",{"key":27,"text":555,"correct":32},"水下混凝土必须连续浇筑，不得中断",{"key":30,"text":557,"correct":22},"浇筑水下混凝土漏斗的设置高度应依据孔径、孔深、导管外径等确定",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":20,"analysis":33},1256374,"关于路基工程挖土施工安全技术交底的内容，下列说法正确的是（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":32},"路堑边坡设混凝土灌注桩、地下连续墙等挡土墙结构时，应待挡土墙结构强度达设计规定后，方可开挖路堑土方",{"key":24,"text":565,"correct":22},"在天然湿度土质的地区开挖土方，砂土和砂砾土开挖深度不超过2.0m，可开挖直槽",{"key":27,"text":567,"correct":22},"在距现状直埋缆线2m范围内采用机械开挖时，应邀请管理单位派人现场监护",{"key":30,"text":569,"correct":22},"人工开挖路堑深度大于5m时，应分层开挖，每次高度不得大于3m，层间应留",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},1256375,"普通水准测量时，在水准尺上读数通常应读至（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"0.1mm",{"key":24,"text":577,"correct":32},"1mm",{"key":27,"text":579,"correct":22},"2mm",{"key":30,"text":581,"correct":22},"5mm",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":30,"analysis":33},1256376,"水平角观测时，各测回间改变零方向度盘位置是为了削弱（ ）误差的影响。",[586,588,590,592],{"key":20,"text":587,"correct":22},"视线轴",{"key":24,"text":589,"correct":22},"横准轴",{"key":27,"text":591,"correct":22},"指标差",{"key":30,"text":593,"correct":32},"度盘分划",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},1256377,"水准测量中，调解微倾螺旋使水准管气泡居中的目的是使（ ）。",[598,600,602,604],{"key":20,"text":599,"correct":22},"竖轴竖直",{"key":24,"text":601,"correct":32},"视准轴水平",{"key":27,"text":603,"correct":22},"十字丝横丝竖直",{"key":30,"text":605,"correct":22},"十字丝竖丝水平",[607,610,613,616,619,622],{"id":15,"name":608,"category":7,"favorite":609},"领导干部任职前廉政法规知识测试题",92,{"id":611,"name":612,"category":7,"favorite":15},595,"建筑结构与设备",{"id":614,"name":615,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":617,"name":618,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":620,"name":621,"category":7,"favorite":8},534,"BIM工程师",{"id":623,"name":621,"category":7,"favorite":8},535]