[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,7,50,812,[13,34,46,58,70,82,94,106,118,130,140,152,164,175,187,199,211,223,235,247,258,270,282,294,306,316,328,340,351,363,375,387,399,411,422,434,445,456,465,477,488,500,512,524,536,548,560,572,584,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1256278,1,"单选题","下列关于横道图进度计划特点的说法，正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工序间的逻辑关系表达清楚",false,{"key":24,"text":25,"correct":26},"B","适用于手工编制进度计划",true,{"key":28,"text":29,"correct":22},"C","可以适应大的进度计划系统",{"key":31,"text":32,"correct":22},"D","能够直观确定计划的关键工作、关键线路与时差","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1256279,"分析施工进度、调整施工进度的前提是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"跟踪检查施工实际进度",{"key":24,"text":41,"correct":22},"对比、分析进度偏差",{"key":28,"text":43,"correct":22},"整理、统计和分析收集数据",{"key":31,"text":45,"correct":22},"处理进度监测结果",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1256280,"把施工对象划分成若干个施工段，每个施工过程的专业队依次连续地在每个施工段上进行作业，以达到连续、均衡施工，这种组织方式被称为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"依次施工",{"key":24,"text":53,"correct":22},"平行施工",{"key":28,"text":55,"correct":22},"流水施工",{"key":31,"text":57,"correct":22},"搭接施工",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1256281,"采用流水作业方式时，劳动力组合应该是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"综合作业组织形式",{"key":24,"text":65,"correct":26},"专业分工作业形式",{"key":28,"text":67,"correct":22},"顺序作业组合形式",{"key":31,"text":69,"correct":22},"平行作业组合形式",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1256282,"将一般成倍节拍流水施工变为加快成倍节拍流水施工时，所采用的措施为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"重新划分施工过程数",{"key":24,"text":77,"correct":22},"改变流水节拍值",{"key":28,"text":79,"correct":26},"增加专业工作队数",{"key":31,"text":81,"correct":22},"重新划分施工段",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1256283,"路面工程各结构层之间的施工宜采用（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"平行作业法",{"key":24,"text":89,"correct":22},"依次作业法",{"key":28,"text":91,"correct":22},"流水作业法",{"key":31,"text":93,"correct":26},"均衡流水法",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1256284,"市政工程采用流水作业时，施工段划分尽可能与工程的（ ）相吻合。",[98,100,102,104],{"key":20,"text":99,"correct":22},"轴线",{"key":24,"text":101,"correct":22},"层次",{"key":28,"text":103,"correct":26},"自然界限",{"key":31,"text":105,"correct":22},"工种",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1256285,"组织流水施工时，相邻两个专业工作队先后开始施工的合理时间间隔，称为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"组织间歇时间",{"key":24,"text":113,"correct":26},"流水步距",{"key":28,"text":115,"correct":22},"自由时差",{"key":31,"text":117,"correct":22},"流水节拍",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1256286,"当一个施工段上所需完成的劳动量或机械台班量和每天的工作班组固定不变，增加班组的人数或机械台班数，流水节拍（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"变大",{"key":24,"text":125,"correct":26},"变小",{"key":28,"text":127,"correct":22},"不能确定",{"key":31,"text":129,"correct":22},"不变",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1256287,"横道图中每一条横道的长度表示流水施工的（ ）。",[134,135,136,138],{"key":20,"text":117,"correct":26},{"key":24,"text":113,"correct":22},{"key":28,"text":137,"correct":22},"流水强度",{"key":31,"text":139,"correct":22},"间歇时间",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":28,"analysis":33},1256288,"工程进度计划比较方法中，主要适用于时标网络计划的方法是（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"横道图比较法",{"key":24,"text":147,"correct":22},"s形曲线比较法",{"key":28,"text":149,"correct":26},"前锋前比较法",{"key":31,"text":151,"correct":22},"香蕉型曲线比较法",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":28,"analysis":33},1256289,"下列选项中，不属于施工过程的施工天数估计的依据的是（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"工程数量",{"key":24,"text":159,"correct":22},"资源效率",{"key":28,"text":161,"correct":26},"施工顺序",{"key":31,"text":163,"correct":22},"资源配置",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},1256290,"在不影响总工期的条件下可以延误的最长时间是（ ）。",[168,170,171,173],{"key":20,"text":169,"correct":26},"总时差",{"key":24,"text":115,"correct":22},{"key":28,"text":172,"correct":22},"最晚开始时间",{"key":31,"text":174,"correct":22},"最晚结束时间",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1256291,"主要用于确定施工机械类型、数量、进场时间，据此落实施工机具来源，组织进场的是（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":26},"施工机械需要量计划",{"key":24,"text":182,"correct":22},"施工机械购置计划",{"key":28,"text":184,"correct":22},"施工机械进场计划",{"key":31,"text":186,"correct":22},"施工机械备案计划",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":28,"analysis":33},1256292,"施工方编制施工进度计划的依据之一是（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"施工劳动力需要计划",{"key":24,"text":194,"correct":22},"施工物资需要计划",{"key":28,"text":196,"correct":26},"施工任务委托合同",{"key":31,"text":198,"correct":22},"项目监理规划",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":24,"analysis":33},1256293,"划分（ ）的目的是使各施工队（组）的劳动力能正常进行流水连续作业，以避免出现停歇现象。",[203,205,207,209],{"key":20,"text":204,"correct":22},"施工过程",{"key":24,"text":206,"correct":26},"施工段",{"key":28,"text":208,"correct":22},"工作面",{"key":31,"text":210,"correct":22},"时间参数",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1256294,"某承包单位在进度计划实施中发现采用的施工技术由于工作面过小而导致进度异常缓慢，也无法投人过多的资源加快施工进度，说明承包商在进度控制中采用的（ ）产生失误。",[215,217,219,221],{"key":20,"text":216,"correct":22},"组织措施",{"key":24,"text":218,"correct":26},"技术措施",{"key":28,"text":220,"correct":22},"经济措施",{"key":31,"text":222,"correct":22},"合同措施",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":31,"analysis":33},1256295,"在编制工程进度计划后，要计算和绘制劳动力需要量图，它反映了施工期间劳动力的动态变化，是衡量施工组织设计合理性的重要标志。通常评价时所用的指标是（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":22},"施工期间劳动力均匀系数",{"key":24,"text":230,"correct":22},"施工期间劳动力需要量高峰值",{"key":28,"text":232,"correct":22},"施工期间劳动力的平均值",{"key":31,"text":234,"correct":26},"施工期间劳动力不均衡系数",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":28,"analysis":33},1256296,"下列市政工程进度计划的主要形式中，时间为纵轴的是（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":22},"横道图",{"key":24,"text":242,"correct":22},"”S”曲线",{"key":28,"text":244,"correct":26},"垂直图",{"key":31,"text":246,"correct":22},"斜率图",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":28,"analysis":33},1256297,"以两条以同一开始时间，同一结束时间的”S”形曲线组合而成的进度计划方法是（ ）。",[251,252,254,256],{"key":20,"text":145,"correct":22},{"key":24,"text":253,"correct":22},"前锋线比较法",{"key":28,"text":255,"correct":26},"香蕉曲线比较法",{"key":31,"text":257,"correct":22},"网络图比较法",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":28,"analysis":33},1256298,"下列市政工程项目进度控制工作中，属于施工方进度控制任务的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"部署项目动用准备工作进度",{"key":24,"text":265,"correct":22},"协调设计、招标的工作进度",{"key":28,"text":267,"correct":26},"编制项目施工的工作计划",{"key":31,"text":269,"correct":22},"编制供货进度计划",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},1256299,"在流水施工方式中，成倍节拍流水施工的特点之一是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":26},"同一施工过程在各施工段上的流水节拍相等",{"key":24,"text":277,"correct":22},"同一施工过程在各施工段上的流水节拍不相等，但其值之间为倍数关系",{"key":28,"text":279,"correct":22},"专业工作队之间的流水步距不相等，但其值之间为倍数关系",{"key":31,"text":281,"correct":22},"专业工作队之间的流水步距相等，且等于流水节拍的最小公倍数",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":28,"analysis":33},1256300,"在双代号网络计划中，如果生产性工作M和N之间的先后顺序关系属于工艺关系，则说明它们的先后顺序是由（ ）决定的。",[286,288,290,292],{"key":20,"text":287,"correct":22},"劳动力调配",{"key":24,"text":289,"correct":22},"原材料供应",{"key":28,"text":291,"correct":26},"工艺过程",{"key":31,"text":293,"correct":22},"资金需求",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":20,"analysis":33},1256301,"组织桥梁大梁预制流水作业时，其工序为支模、扎筋、浇混凝土、拆模、横移堆放。因浇注混凝土后，要等混凝土强度达到要求后，拆移工序才能开始。为此，流水作业中应当考虑（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":26},"技术间歇",{"key":24,"text":301,"correct":22},"组织间歇",{"key":28,"text":303,"correct":22},"平行搭接",{"key":31,"text":305,"correct":22},"顺序施工",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":24,"analysis":33},1256302,"流水步距的数目取决于（ ）。",[310,311,313,315],{"key":20,"text":208,"correct":22},{"key":24,"text":312,"correct":26},"施工过程数",{"key":28,"text":314,"correct":22},"施工段数",{"key":31,"text":117,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},1256303,"双代号网络计划中的虚箭线是实际工作中并不存在的一项虚设工作，一般起着工作之间的联系.区分和（ ）。个作用。",[320,322,324,326],{"key":20,"text":321,"correct":22},"交叉",{"key":24,"text":323,"correct":22},"汇合",{"key":28,"text":325,"correct":22},"分流",{"key":31,"text":327,"correct":26},"断路",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},1256304,"关于周转性材料消耗量的说法，正确的是（ ）。",[332,334,336,338],{"key":20,"text":333,"correct":22},"周转性材料的消耗量是指材料使用量",{"key":24,"text":335,"correct":26},"周转性材料的消耗量应当用材料的一次使用量和摊销量两个指标表示",{"key":28,"text":337,"correct":22},"周转性材料的摊销量供施工企业组织使用",{"key":31,"text":339,"correct":22},"周转性材料的消耗量与周转使用次数无关",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},1256305,"计算劳动量和机械台班数时，应首先确定所采用的（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":26},"定额",{"key":24,"text":347,"correct":22},"施工方案",{"key":28,"text":349,"correct":22},"施工组织设计",{"key":31,"text":161,"correct":22},{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":31,"analysis":33},1256306,"当单代号网络图中有多项起点节点时，正确的做法是（ ）。",[355,357,359,361],{"key":20,"text":356,"correct":22},"调整多项起点节点的逻辑关系",{"key":24,"text":358,"correct":22},"合并多项起点节点作为起点节点",{"key":28,"text":360,"correct":22},"多项起点节点采用相同的编号",{"key":31,"text":362,"correct":26},"设置一项虚工作作为起点节点数量",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":20,"analysis":33},1256307,"当某工程采用的流水施工分段又分层时，对同一施工层，在划分施工段数时，宜（ ）。",[367,369,371,373],{"key":20,"text":368,"correct":26},"施工段数大于施工过程数",{"key":24,"text":370,"correct":22},"施工段数等于施工过程数",{"key":28,"text":372,"correct":22},"施工段数小于施工过程数",{"key":31,"text":374,"correct":22},"施工段数小于等于施工过程数",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":28,"analysis":33},1256308,"在单代号网络计划中，设H工作的紧后工作有I和J，总时差分别为3天和4天，工作H和I之间时间间隔为8天，工作H和J之间的时间间隔为6天，则工作H的总时差为（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"5天",{"key":24,"text":382,"correct":22},"8天",{"key":28,"text":384,"correct":26},"10天",{"key":31,"text":386,"correct":22},"12天",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":20,"analysis":33},1256309,"双代号网络图中既有内向箭线，又有外向箭线的节点称为（ ）。",[391,393,395,397],{"key":20,"text":392,"correct":26},"中间节点",{"key":24,"text":394,"correct":22},"起点节点",{"key":28,"text":396,"correct":22},"终点节点",{"key":31,"text":398,"correct":22},"交接节点",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":31,"analysis":33},1256310,"某工程由于各施工段的工程量不等，各施工班组的施工人数又不同，使同一施工过程在各施工段上或各施工过程在同一施工段上的流水节拍无规律性，这时需要组织（ ）施工。",[403,405,407,409],{"key":20,"text":404,"correct":22},"等节拍流水",{"key":24,"text":406,"correct":22},"成倍节拍专业流水",{"key":28,"text":408,"correct":22},"加快成倍节拍专业流水",{"key":31,"text":410,"correct":26},"无节奏专业流水",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":20,"analysis":33},1256311,"缩短工期也不能无限制增加施工班组内人数，这是因为受到（ ）的限制。",[415,416,418,420],{"key":20,"text":208,"correct":26},{"key":24,"text":417,"correct":22},"资金",{"key":28,"text":419,"correct":22},"劳动力",{"key":31,"text":421,"correct":22},"生产资源",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},1256312,"网络计划中，为了优化工期，可以缩短（ ）。",[426,428,430,432],{"key":20,"text":427,"correct":22},"要求工期",{"key":24,"text":429,"correct":26},"计算工期",{"key":28,"text":431,"correct":22},"计划工期",{"key":31,"text":433,"correct":22},"合同工期",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":20,"analysis":33},1256313,"市政工程施工中划分施工段的目的是为了适应（ ）的需要。",[438,439,441,443],{"key":20,"text":55,"correct":26},{"key":24,"text":440,"correct":22},"工程进度",{"key":28,"text":442,"correct":22},"工程质量",{"key":31,"text":444,"correct":22},"安全生产",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":28,"analysis":33},1256314,"在市政工程施工时，施工段划分的大小应与（ ）及其生产力相适应。",[449,450,452,454],{"key":20,"text":55,"correct":22},{"key":24,"text":451,"correct":22},"施工进度",{"key":28,"text":453,"correct":26},"劳动组织",{"key":31,"text":455,"correct":22},"施工安全",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":28,"analysis":33},1256315,"下列选项中，不属于实际进度与计划进度的比较方法的是（ ）。",[460,461,462,464],{"key":20,"text":145,"correct":22},{"key":24,"text":147,"correct":22},{"key":28,"text":463,"correct":26},"柱状图比较法",{"key":31,"text":151,"correct":22},{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":31,"analysis":33},1256316,"在使工人人数达到饱和的条件下，下列（ ）说法是错误的。",[469,471,473,475],{"key":20,"text":470,"correct":22},"施工段数愈多，工期愈长",{"key":24,"text":472,"correct":22},"施工段数愈多，所需工人愈少",{"key":28,"text":474,"correct":22},"施工段数愈多，愈有可能保证施工队连续施工",{"key":31,"text":476,"correct":26},"施工段数愈多，愈有可能保证施工面不空闲",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":31,"analysis":33},1256317,"编制施工进度计划时，必须考虑各分部分项工程的合理施工顺序，尽可能组织（ ）施工，力求主要工种的工作队连续施工。",[481,483,485,486],{"key":20,"text":482,"correct":22},"顺序",{"key":24,"text":484,"correct":22},"分段",{"key":28,"text":321,"correct":22},{"key":31,"text":487,"correct":26},"流水",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":28,"analysis":33},1256318,"某基础工程土方开挖总量为8800m3，该工程拟分5施工段组织固定节拍流水施工，两台挖掘机每台班产量定额均为50m3，采用2班制作业，其流水节拍应为（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"44",{"key":24,"text":495,"correct":22},"18",{"key":28,"text":497,"correct":26},"9",{"key":31,"text":499,"correct":22},"3",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":31,"analysis":33},1256319,"施工企业进度控制的任务是依据（ ），按照施工进度的要求控制进度。",[504,506,508,510],{"key":20,"text":505,"correct":22},"建设项目总进度目标",{"key":24,"text":507,"correct":22},"施工总进度计划",{"key":28,"text":509,"correct":22},"建安工程工期定额",{"key":31,"text":511,"correct":26},"施工承包合同",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},1256320,"如果施工中发生工期延误，欲对后续工作的持续时间压缩，错误的做法是（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"压缩资源有保证的工作",{"key":24,"text":519,"correct":22},"压缩对质量影响不大的工作",{"key":28,"text":521,"correct":22},"压缩对安全影响不大的工作",{"key":31,"text":523,"correct":26},"压缩时差最大的工作",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1256321,"关于给水（压力流）管道下管与稳管施工安全技术交底的内容，下列说法正确的（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"施工过程中临时中断作业时，应保证管道畅通",{"key":24,"text":531,"correct":26},"使用三脚架倒链吊装时，三脚架支搭应根据被吊装管子的质量进行受力验算，确认符合要求",{"key":28,"text":533,"correct":22},"应采用砂轮锯切断钢管",{"key":31,"text":535,"correct":22},"钢管对口作业，对口后应及时将管身挡掩、固定，固定不得采用电焊",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},1256322,"对质量管理体系来说，（ ）是实现质量方针和质量目标的能力。",[540,542,544,546],{"key":20,"text":541,"correct":26},"固有特性",{"key":24,"text":543,"correct":22},"赋予特性",{"key":28,"text":545,"correct":22},"组织特性",{"key":31,"text":547,"correct":22},"主要特性",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":20,"analysis":33},1256323,"全站仪的组成不包括电子（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":26},"水准仪",{"key":24,"text":555,"correct":22},"经纬仪",{"key":28,"text":557,"correct":22},"测距仪",{"key":31,"text":559,"correct":22},"记录仪",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":28,"analysis":33},1256324,"道路工程图不包括（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"道路平面图",{"key":24,"text":567,"correct":22},"道路纵断面图",{"key":28,"text":569,"correct":26},"路面结构图",{"key":31,"text":571,"correct":22},"道路横断面图",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":28,"analysis":33},1256325,"在桥梁工程图中，（ ）主要表明桥梁的型式、总跨径、孔数、桥梁标高、桥面宽度、桥结构、横断面布置和桥梁的线形等。",[576,578,580,582],{"key":20,"text":577,"correct":22},"桥梁结构图",{"key":24,"text":579,"correct":22},"桥位地质图",{"key":28,"text":581,"correct":26},"桥梁总体布置图",{"key":31,"text":583,"correct":22},"桥位平面图",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":28,"analysis":33},1256326,"关于沥青混合料路面混合料摊铺与碾压施工安全技术交底的内容，下列说法正确的是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"沥青混凝土摊铺机作业，必须由施工员指挥",{"key":24,"text":591,"correct":22},"摊铺机运行中，应及时做好机械养护与保养工作",{"key":28,"text":593,"correct":26},"摊铺作业在酷热时段应采取降暑措施",{"key":31,"text":595,"correct":22},"沥青混凝土碾压工程中，应由施工员统一指挥",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":20,"analysis":33},1256327,"关于灌注桩基础人工挖孔桩安全技术交底的内容，下列说法正确的是（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":26},"人工挖孔钻施工适用于桩径800~2000mm、桩深不超过25m的桩",{"key":24,"text":603,"correct":22},"人工挖孔钻采用砖护壁时，砖强度等级不得低于MU25",{"key":28,"text":605,"correct":22},"同时钻孔施工的相邻桩孔净距不得小于5m",{"key":31,"text":607,"correct":22},"孔内照明必须采用220v电压",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]