[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,6,50,812,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,200,212,224,236,248,260,272,284,296,308,320,332,344,354,366,378,390,402,414,426,438,450,462,474,486,496,508,520,532,544,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1256228,1,"单选题","（ ）压路机初压的最大碾压速度是3km\u002Fh。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","钢筒式",true,{"key":24,"text":25,"correct":26},"B","轮胎式",false,{"key":28,"text":29,"correct":26},"C","振动式",{"key":31,"text":32,"correct":26},"D","钢轨式","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1256229,"垃圾填埋场泥质防水层施工技术的核心是",[38,40,42,44],{"key":20,"text":39,"correct":26},"选择原材料配合比",{"key":24,"text":41,"correct":26},"控制防水层压实度",{"key":28,"text":43,"correct":22},"掺加膨润土的拌合土层施工技术",{"key":31,"text":45,"correct":26},"分层压实施工技术",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1256230,"顶管机类型较多，按照工作条件，顶管机分为两大类，即（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"泥水平衡顶管机顶管机和土压平衡顶管机顶管机",{"key":24,"text":53,"correct":26},"手工挖掘式顶管机和机械式顶管机",{"key":28,"text":55,"correct":22},"开敞式人工顶管机和密闭式机械顶管机",{"key":31,"text":57,"correct":26},"加水式顶管机和加泥式顶管机",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1256231,"对不同级别、不同熔体流动速率的聚乙烯原料制造的管材或管件，不同标准尺寸比（SDR值）的聚乙烯燃气管道连接时，必须采用（ ）连接。",[62,64,66,68],{"key":20,"text":63,"correct":22},"电熔",{"key":24,"text":65,"correct":26},"热熔",{"key":28,"text":67,"correct":26},"卡箍",{"key":31,"text":69,"correct":26},"法兰",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1256232,"排水工程采用柔性管道时，管道敷设完毕，安装验收合格后土方回填，要求回填到管顶以上（ ）的高度，防止管道因雨漂浮。",[74,76,78,80],{"key":20,"text":75,"correct":26},"等于管径",{"key":24,"text":77,"correct":26},"略小于一倍管径",{"key":28,"text":79,"correct":22},"大于一倍管径",{"key":31,"text":81,"correct":26},"大于两倍管径",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1256233,"施工技术文件应按国家规范要求，在工程竣工验收后（ ）个月内，由建设单位报当地城建档案机构归档。",[86,88,90,92],{"key":20,"text":87,"correct":26},"1",{"key":24,"text":89,"correct":22},"3",{"key":28,"text":91,"correct":26},"6",{"key":31,"text":93,"correct":26},"12",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1256234,"按（ ）分类可将供热管道分为蒸汽热网和热水热网。",[98,100,102,104],{"key":20,"text":99,"correct":26},"系统形式",{"key":24,"text":101,"correct":26},"所处地位",{"key":28,"text":103,"correct":26},"敷设方式",{"key":31,"text":105,"correct":22},"热媒种类",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1256235,"泥质防水层施工质量检验项目包括压实度试验和（ ）两项。",[110,112,114,116],{"key":20,"text":111,"correct":26},"严密性试验",{"key":24,"text":113,"correct":26},"抗压试验",{"key":28,"text":115,"correct":26},"强度试验",{"key":31,"text":117,"correct":22},"渗水试验",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1256236,"工具管是顶管的关键机具，下列不是工具管的功能的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"掘进",{"key":24,"text":125,"correct":26},"防坍",{"key":28,"text":127,"correct":22},"支撑",{"key":31,"text":129,"correct":26},"导向",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1256237,"钢筋机械连接件的最小保护层厚度不得小于（ ）mm。",[134,136,138,140],{"key":20,"text":135,"correct":26},"10",{"key":24,"text":137,"correct":22},"20",{"key":28,"text":139,"correct":26},"30",{"key":31,"text":141,"correct":26},"40",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1256238,"配制预应力混凝土时应优先采用（ ）",[146,148,150,152],{"key":20,"text":147,"correct":22},"普通硅酸盐水泥",{"key":24,"text":149,"correct":26},"矿渣硅酸盐水泥",{"key":28,"text":151,"correct":26},"火山灰质硅酸盐水泥",{"key":31,"text":153,"correct":26},"粉煤灰硅酸盐水泥",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1256239,"绘水排水压力管道的水压试验分为（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"强度试验和严密性试验",{"key":24,"text":161,"correct":22},"预试验和主试验",{"key":28,"text":163,"correct":26},"闭水试验和闭气试验",{"key":31,"text":165,"correct":26},"满水试验和严密性试验",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1256240,"在旧路上开槽埋管时，沟槽挖掘计算深度通常是指（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"地表标高—管底设计标高",{"key":24,"text":173,"correct":22},"地表标高—管道土基标高",{"key":28,"text":175,"correct":26},"路基标高—管底设计标高",{"key":31,"text":177,"correct":26},"路基标高—管道土基标高",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1256241,"梁、板落位时，梁、板的顺桥向位置，一般以（ ）为准。",[182,184,186,188],{"key":20,"text":183,"correct":26},"活动端",{"key":24,"text":185,"correct":22},"固定端",{"key":28,"text":187,"correct":26},"两端面与盖粱间距相等",{"key":31,"text":189,"correct":26},"活动端端面对齐",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1256242,"沉井下沉在终沉时，每（ ）小时测一次，严格控制超沉，沉井封底前自沉速率应小于10mm\u002F8h。",[194,195,197,198],{"key":20,"text":87,"correct":22},{"key":24,"text":196,"correct":26},"2",{"key":28,"text":89,"correct":26},{"key":31,"text":199,"correct":26},"4",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":28,"analysis":33},1256243,"汽车起重机是将起重机吊台安装在通用或专用载重汽车底盘上的一种起重机，属于小吨位的吊车，在我国采用（ ）表示。",[204,206,208,210],{"key":20,"text":205,"correct":26},"QU",{"key":24,"text":207,"correct":26},"QD",{"key":28,"text":209,"correct":22},"QY",{"key":31,"text":211,"correct":26},"QZ",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1256244,"热水热网根据热媒温度可分为高温热水热网和低温热水热网两类。其中，低温热水热网中热媒允许的最高温度是（ ）",[216,218,220,222],{"key":20,"text":217,"correct":26},"50℃",{"key":24,"text":219,"correct":22},"95℃",{"key":28,"text":221,"correct":26},"100℃",{"key":31,"text":223,"correct":26},"160℃",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},1256245,"喷锚暗挖法施工隧道的衬砌主要为（ ）衬砌。",[228,230,232,234],{"key":20,"text":229,"correct":22},"复合式",{"key":24,"text":231,"correct":26},"整体式",{"key":28,"text":233,"correct":26},"锚喷式",{"key":31,"text":235,"correct":26},"装配式",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1256246,"改良沥青混合料生产温度应根据改良沥青品种、黏度、气候条件、铺装层的厚度确定，通常较普通沥青混合料的正常生产温度提高",[240,242,244,246],{"key":20,"text":241,"correct":26},"5-10℃",{"key":24,"text":243,"correct":22},"10-20℃",{"key":28,"text":245,"correct":26},"20-25℃",{"key":31,"text":247,"correct":26},"25-30℃",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1256247,"关于热拌沥青混合料面层施工的说法，正确的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"主干路、快速路宜采用两台（含）以上摊铺机联合摊铺",{"key":24,"text":255,"correct":26},"压路机应从路中线向两边碾压，碾压速度应稳定而均匀",{"key":28,"text":257,"correct":26},"碾压开始温度不低于160℃，碾压终了的表面溫度不低于90℃",{"key":31,"text":259,"correct":26},"路面完工后待自然冷却，表面温度低于60℃后，方可开放交通",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},1256248,"工程目标主要包括工期目标、（ ）、安全文明创建目标、技术创新目标等。",[264,266,268,270],{"key":20,"text":265,"correct":26},"施工目标",{"key":24,"text":267,"correct":26},"生产目标",{"key":28,"text":269,"correct":26},"进度目标",{"key":31,"text":271,"correct":22},"质量目标",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},1256249,"合同管理必须遵守（ ）《建筑法》及有关法律法规。",[276,278,280,282],{"key":20,"text":277,"correct":22},"《合同法》",{"key":24,"text":279,"correct":26},"《劳动法》",{"key":28,"text":281,"correct":26},"《管理法》",{"key":31,"text":283,"correct":26},"《劳务法》",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},1256250,"以70号石油沥青拌合沥青混合料摊铺温度不低于（ ）℃。",[288,290,292,294],{"key":20,"text":289,"correct":26},"120~150",{"key":24,"text":291,"correct":22},"135~150",{"key":28,"text":293,"correct":26},"140~155",{"key":31,"text":295,"correct":26},"145~165",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},1256251,"砌筑沟道施工时，砌筑砂浆应采用水泥砂浆，其强度等级应符合设计要求，且不应低于（ ）",[300,302,304,306],{"key":20,"text":301,"correct":26},"M20",{"key":24,"text":303,"correct":26},"M15",{"key":28,"text":305,"correct":22},"M10",{"key":31,"text":307,"correct":26},"M7.5",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},1256252,"（ ）适用于土质稳定、断面较小的隧道施工，适宜人工开挖或小型机械作业。",[312,314,316,318],{"key":20,"text":313,"correct":26},"单侧壁导坑法",{"key":24,"text":315,"correct":26},"台阶开挖法",{"key":28,"text":317,"correct":26},"环形开挖预留核心土法",{"key":31,"text":319,"correct":22},"全断面开挖法",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},1256253,"桥面与低水位之间的高差是指桥梁的",[324,326,328,330],{"key":20,"text":325,"correct":22},"桥梁高度",{"key":24,"text":327,"correct":26},"净空高度",{"key":28,"text":329,"correct":26},"矢量高度",{"key":31,"text":331,"correct":26},"建筑高度",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},1256254,"后张法预应力混凝土梁施工中，曲线预应力孔道最低点宜设置（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":26},"压浆孔",{"key":24,"text":339,"correct":26},"溢浆孔",{"key":28,"text":341,"correct":26},"排气孔",{"key":31,"text":343,"correct":22},"排水孔",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},1256255,"管道水压主试验阶段要停止注水补压稳定（ ）min后，压力下降不超过所允许压力下降数值时，将试压力降至工作压力并保持恒压30min。",[348,349,351,352],{"key":20,"text":135,"correct":26},{"key":24,"text":350,"correct":22},"15",{"key":28,"text":137,"correct":26},{"key":31,"text":353,"correct":26},"25",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":28,"analysis":33},1256256,"围堰高度应高出施工期间可能出现的最高水位（ ）m。",[358,360,362,364],{"key":20,"text":359,"correct":26},"0.2-0.5",{"key":24,"text":361,"correct":26},"0.4-0.6",{"key":28,"text":363,"correct":22},"0.5-0.7",{"key":31,"text":365,"correct":26},"0.6-0.8",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":28,"analysis":33},1256257,"关于基坑（槽）内明沟排水的说法，正确的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":26},"排水主要为了提高土体强度",{"key":24,"text":373,"correct":26},"排水沟底要始终保持比挖土面低不小干0.2m",{"key":28,"text":375,"correct":22},"集水井底面应比沟底面低0.5m以上",{"key":31,"text":377,"correct":26},"挖土顺序应从排水沟远端逐渐向集水井处挖掘",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":28,"analysis":33},1256258,"设置内支撑的软弱地层基坑，其支撑结构挡土的应力传递路径是（ ）",[382,384,386,388],{"key":20,"text":383,"correct":26},"围檩（冠梁）一围护（桩）墙一支撑",{"key":24,"text":385,"correct":26},"围檩（冠梁）一支撑一围护（桩）墙",{"key":28,"text":387,"correct":22},"围护（桩）墙一围檩（冠梁）一支撑）。",{"key":31,"text":389,"correct":26},"圈护（桩）墙一支撑一围檩（冠梁）",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},1256259,"直埋蒸汽管道必须设置的构件是（ ）",[394,396,398,400],{"key":20,"text":395,"correct":26},"放散管",{"key":24,"text":397,"correct":22},"排潮管",{"key":28,"text":399,"correct":26},"安全阀",{"key":31,"text":401,"correct":26},"排汽管",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},1256260,"沉桩方式不包括",[406,408,410,412],{"key":20,"text":407,"correct":26},"锤击沉桩",{"key":24,"text":409,"correct":22},"放射沉桩",{"key":28,"text":411,"correct":26},"振动沉桩",{"key":31,"text":413,"correct":26},"静力压桩",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},1256261,"GCL的施工流程正确的是",[418,420,422,424],{"key":20,"text":419,"correct":26},"基底检验→吊运就位→搭接宽度调整→人工铺展→搭接处撒彭润粉→进行后续施工",{"key":24,"text":421,"correct":26},"基底检验→吊运就位→人工铺展→搭接处撒彭润粉→搭接宽度调整→进行后续施工",{"key":28,"text":423,"correct":26},"基底检验→吊运就位→搭接宽度调整→搭接处撒彭润粉→人工铺展→进行后续施工",{"key":31,"text":425,"correct":22},"基底检验→吊运就位→人工铺展→搭接宽度调整→搭接处撒彭润粉→进行后续施工",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},1256262,"清水池是给水系统中（ ）的调蓄构筑物。",[430,432,434,436],{"key":20,"text":431,"correct":26},"调节水厂均匀供水和满足用户均匀用水",{"key":24,"text":433,"correct":22},"调节水厂均匀供水和满足用户不均匀用水",{"key":28,"text":435,"correct":26},"调节水厂不均匀供水和满足用户不均匀用水",{"key":31,"text":437,"correct":26},"调节水厂不均匀供水和满足用户均匀用水",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},1256263,"注浆施工应根据土质条件选择注浆法，在黏土层中宜采用（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":26},"小导管注浆法",{"key":24,"text":445,"correct":26},"高压喷射注浆法",{"key":28,"text":447,"correct":26},"渗入注浆法",{"key":31,"text":449,"correct":22},"劈裂或电动硅化注浆法",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1256264,"关于盾构法施工隧道存在的问题，下列说法正确的是（ ）",[454,456,458,460],{"key":20,"text":455,"correct":22},"当隧道曲线半径过小时，施工较为困难",{"key":24,"text":457,"correct":26},"隧道的施工费用受覆土量多少影响",{"key":28,"text":459,"correct":26},"风、雨等气候条件影响隧道施工",{"key":31,"text":461,"correct":26},"隧道穿过河底或其他建筑物时，影响施工",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1256265,"刚性挡土墙静止不动，墙背土层未受任何干扰，此时，作用在墙上的水平压应力称为（ ）",[466,468,470,472],{"key":20,"text":467,"correct":26},"水平土压力",{"key":24,"text":469,"correct":22},"静止土压力",{"key":28,"text":471,"correct":26},"主动土压力",{"key":31,"text":473,"correct":26},"被动土压力",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},1256266,"竣工验收阶段主要进行的工作有：①组织现场验收，②编制竣工验收计划，③办理交工手续，④进行竣工结算，⑤移交竣工资料，⑥竣工验收准备。工作先后排序正确的是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"⑥②①④⑤③",{"key":24,"text":481,"correct":26},"⑥②①③④⑤",{"key":28,"text":483,"correct":26},"②⑥①③④⑤",{"key":31,"text":485,"correct":26},"②⑥①④③⑤",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":28,"analysis":33},1256267,"垃圾填埋场的使用期限较长，达（ ）年以上。",[490,492,494,495],{"key":20,"text":491,"correct":26},"5",{"key":24,"text":493,"correct":26},"7",{"key":28,"text":135,"correct":22},{"key":31,"text":350,"correct":26},{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":24,"analysis":33},1256268,"直接消耗一次热媒，中间设备极少，一次补充热媒量大的供热管道系统是（ ）",[500,502,504,506],{"key":20,"text":501,"correct":26},"闭式系统",{"key":24,"text":503,"correct":22},"开式系统",{"key":28,"text":505,"correct":26},"蒸气系统",{"key":31,"text":507,"correct":26},"凝水系统",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},1256269,"对于特重及重交通等级的混凝土路面，横向胀缝、缩缝均设置（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":26},"连接杆",{"key":24,"text":515,"correct":22},"传力杆",{"key":28,"text":517,"correct":26},"拉力杆",{"key":31,"text":519,"correct":26},"伸缩杆",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":20,"analysis":33},1256270,"现场施工准备工作中的“三通一平”是指（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":22},"A水通、电通、路通、场地平整",{"key":24,"text":527,"correct":26},"水通、路通、网通、路面平整",{"key":28,"text":529,"correct":26},"水通、路通、电话通、场地平整",{"key":31,"text":531,"correct":26},"水通、电通、网通、路面平整",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},1256271,"工程施工顺序应在满足工程建设的要求下，组织分期分批施工。同时应遵循（ ）的原则进行安排。",[536,538,540,542],{"key":20,"text":537,"correct":26},"先地上、后地下",{"key":24,"text":539,"correct":22},"先主体、后附属",{"key":28,"text":541,"correct":26},"先附属、后主体",{"key":31,"text":543,"correct":26},"先支线、后干线",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":28,"analysis":33},1256272,"最理想的流水施工方式是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":26},"异节奏流水施工",{"key":24,"text":551,"correct":26},"无节奏流水施工",{"key":28,"text":553,"correct":22},"等节奏流水施工",{"key":31,"text":555,"correct":26},"成倍节拍流水施工",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":28,"analysis":33},1256273,"工程项目的月进度计划和旬作业计划属于（ ）计划。",[560,562,564,566],{"key":20,"text":561,"correct":26},"控制性",{"key":24,"text":563,"correct":26},"指导性",{"key":28,"text":565,"correct":22},"实施性",{"key":31,"text":567,"correct":26},"竞争性",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":28,"analysis":33},1256274,"单代号网络计划中，工作之间的时间间隔等于（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":26},"紧后工作最早开始时间减去本工作的最迟完成时间",{"key":24,"text":575,"correct":26},"紧后工作最迟开始时间减去本工作的最迟完成时间",{"key":28,"text":577,"correct":22},"紧后工作最早开始时间减去本工作的最早完成时间",{"key":31,"text":579,"correct":26},"紧后工作最迟开始时间减去本工作的最早完成时间",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":28,"analysis":33},1256275,"在安排一个小型项目施工的进度时，只需编制（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":26},"施工总进度方案",{"key":24,"text":587,"correct":26},"施工总进度规划",{"key":28,"text":589,"correct":22},"施工总进度计划",{"key":31,"text":591,"correct":26},"施工总进度目标",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":28,"analysis":33},1256276,"某段市政道路工程施工，路基填方高度20m，根据进度计划安排，要求路基填筑完成自然沉降半年后，再进行路面施工，则路基填筑与路面施工之间的进度计划搭接关系。",[596,598,600,602],{"key":20,"text":597,"correct":26},"开始到开始",{"key":24,"text":599,"correct":26},"开始到结束",{"key":28,"text":601,"correct":22},"结束到开始",{"key":31,"text":603,"correct":26},"结束到结束",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":24,"analysis":33},1256277,"决定材料供应计划保证供应程度的文件是（ ）。",[608,610,612,614],{"key":20,"text":609,"correct":26},"材料供应计划",{"key":24,"text":611,"correct":22},"材料需要量计划",{"key":28,"text":613,"correct":26},"材料采购计划",{"key":31,"text":615,"correct":26},"材料用款计划",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]