[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,5,50,812,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,272,284,296,308,320,332,344,356,368,380,392,404,416,428,440,452,464,476,488,500,512,524,536,548,560,572,584,595,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1256178,1,"单选题","对于高大模板工程，施工企业编制专项施工方案后，组织专家论证后，经（ ）签字后实施。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","施工企业项目经理、总监理工程师、现场监理工程师",false,{"key":24,"text":25,"correct":26},"B","施工企业技术负责人、建设单位项目负责人、总监理工程师",true,{"key":28,"text":29,"correct":22},"C","施工企业技术负责人、总监理工程师、现场监理工程师",{"key":31,"text":32,"correct":22},"D","建设单位负责人、总监理工程师、施工企业项目经理","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1256179,"填料式补偿器安装应符合的要求，下列叙述不正确的是",[38,40,42,44],{"key":20,"text":39,"correct":22},"应与管道保持同心.不得歪斜",{"key":24,"text":41,"correct":22},"导向支座应保证运行时自由伸缩.不得偏离中心",{"key":28,"text":43,"correct":26},"插管应安装在燃气流出端",{"key":31,"text":45,"correct":22},"填料石棉绳应涂石墨粉并应逐圈装入.逐圈压紧.各圈接口应相互错开",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1256180,"当地层条件差、断面特别大时，浅埋暗挖隧道施工不宜采用（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"中洞法",{"key":24,"text":53,"correct":22},"柱洞法",{"key":28,"text":55,"correct":22},"洞桩法",{"key":31,"text":57,"correct":26},"全断面法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1256181,"较大体积的混凝土墩台及其基础埋放石块的数量不宜超过混凝土结构体积的（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"10%",{"key":24,"text":65,"correct":26},"25%",{"key":28,"text":67,"correct":22},"30%",{"key":31,"text":69,"correct":22},"50%",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1256182,"（ ）是对整个建设项目的全局性战略部署，范围较广、内容比较概况，属控制型施工组织设计。",[74,76,78,80],{"key":20,"text":75,"correct":26},"施工组织总设计",{"key":24,"text":77,"correct":22},"单位施工组织设计",{"key":28,"text":79,"correct":22},"分部分项施工组织设计",{"key":31,"text":81,"correct":22},"施工方案",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1256183,"当基坑面积较大，采用环形井点降水时，挖土运输设备出入道可不封闭，间距可达（ ）m，一般留在地下水下游方向。",[86,88,90,92],{"key":20,"text":87,"correct":26},"4",{"key":24,"text":89,"correct":22},"5",{"key":28,"text":91,"correct":22},"6",{"key":31,"text":93,"correct":22},"7",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1256184,"整体式现浇混凝土施工池体结构施工流程说法正确的是",[98,100,102,104],{"key":20,"text":99,"correct":26},"测量定位→土方开挖及地基处理→垫层施工→防水层施工→底板浇筑→池壁及顶板支撑柱浇筑→顶板浇筑→功能性试验",{"key":24,"text":101,"correct":22},"测量定位→土方开挖及地基处理→防水层施工→垫层施工→底板浇筑→池壁及顶板支撑柱浇筑→顶板浇筑→功能性试验",{"key":28,"text":103,"correct":22},"测量定位→土方开挖及地基处理→底板浇筑→垫层施工→防水层施工→池壁及顶板支撑柱浇筑→功能性试验→扳浇筑",{"key":31,"text":105,"correct":22},"测量定位→土方开挖及地基处理→垫层施工→防水层施工→底板浇筑→池壁及顶板支撑柱浇筑→功能性试验→顶板浇筑",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1256185,"不属于盾构法修建的区间隧道的衬砌是（ ）",[110,112,114,116],{"key":20,"text":111,"correct":26},"砌筑式衬砌",{"key":24,"text":113,"correct":22},"预制装配式衬",{"key":28,"text":115,"correct":22},"双层复合云衬砌",{"key":31,"text":117,"correct":22},"挤压混凝土整体式衬砌",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1256186,"环氧煤沥青涂料涂底漆时应在表面除锈后的（ ）之内涂刷。",[122,124,126,128],{"key":20,"text":123,"correct":22},"5h",{"key":24,"text":125,"correct":22},"6h",{"key":28,"text":127,"correct":22},"7h",{"key":31,"text":129,"correct":26},"8h",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1256187,"环境管理目标不包括下列哪一项？",[134,136,138,140],{"key":20,"text":135,"correct":26},"制定并保持本项目的职业健康安全管理方案以实现其目标，管理方案中具体措施可与劳动保护、职业病防治相结合",{"key":24,"text":137,"correct":22},"满足国家和当地政府部门有关规定",{"key":28,"text":139,"correct":22},"满足工程合同和施工组织设计要求",{"key":31,"text":141,"correct":22},"兑现投标文件承诺",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1256188,"在工程实施阶段，关手施工图预算作用阐述有误的是",[146,148,150,152],{"key":20,"text":147,"correct":22},"施工图预算是施工单位和项目部成本控制的主要依据",{"key":24,"text":149,"correct":22},"施工图预算是工程费用调整的依据",{"key":28,"text":151,"correct":26},"施工图预算对编制实施性施工组织设计作用基本不大",{"key":31,"text":153,"correct":22},"只有在出现重大设计变更、政策调整及不可抗力等情况下方可调整施工图预算",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1256189,"预应力混凝土连续梁悬臂浇筑施工中，顶板纵向预应力筋正确的张拉顺序是（ ）",[158,160,162,164],{"key":20,"text":159,"correct":22},"上下对称张拉",{"key":24,"text":161,"correct":22},"左右对称张拉",{"key":28,"text":163,"correct":22},"上下、左右依次张拉，",{"key":31,"text":165,"correct":26},"上下、左右对称张拉",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1256190,"分节制作沉井，设计无要求时，混凝土强度应达到设计强度等级（ ）%后，方可拆除模板或浇筑后一节混凝土。",[170,172,174,176],{"key":20,"text":171,"correct":22},"65",{"key":24,"text":173,"correct":26},"75",{"key":28,"text":175,"correct":22},"85",{"key":31,"text":177,"correct":22},"95",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1256191,"沥青填充料当采用水泥、石灰、粉煤灰时，其用量不宜超过矿料总量的",[182,184,186,188],{"key":20,"text":183,"correct":22},"1%",{"key":24,"text":185,"correct":26},"2%",{"key":28,"text":187,"correct":22},"3%",{"key":31,"text":189,"correct":22},"4%",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1256192,"下列关于连续梁合龙的表述哪项是错误的？（ ）",[194,196,198,200],{"key":20,"text":195,"correct":22},"合龙段的长度宜为2米",{"key":24,"text":197,"correct":22},"合龙前应观测气温变化与梁端高程及悬臂端间距的关系",{"key":28,"text":199,"correct":26},"合龙宜在一天中气温最高时进行",{"key":31,"text":201,"correct":22},"合龙段的混凝土强度应提高一级，以尽早施加预应力",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1256193,"合同风险的规避说法不正确的是",[206,208,210,212],{"key":20,"text":207,"correct":22},"充分利用合同条款",{"key":24,"text":209,"correct":22},"增设保值条款",{"key":28,"text":211,"correct":26},"减少分包方资金、设备的投入",{"key":31,"text":213,"correct":22},"加强索赔管理，进行合理索赔",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1256194,"提出索赔时，要有正当的索赔理由，且有索赔事件发生时的",[218,220,222,224],{"key":20,"text":219,"correct":26},"记录资料",{"key":24,"text":221,"correct":22},"现场照片",{"key":28,"text":223,"correct":22},"工期延误",{"key":31,"text":225,"correct":22},"有效证据",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1256195,"土质路基的压实原则是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"先轻后重、先静后振、先低后高、先慢后快，轮迹重叠",{"key":24,"text":233,"correct":22},"先重后轻、先静后振、先低后高、先慢后快，轮迹重叠",{"key":28,"text":235,"correct":22},"先轻后重、先静后振、先高后低、先慢后快，轮迹重叠",{"key":31,"text":237,"correct":22},"先轻后重、先静后振、先低后高、先快后慢，轮迹重叠",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1256196,"在项目管理中，属项目核心的是",[242,244,246,248],{"key":20,"text":243,"correct":22},"合同风险管理",{"key":24,"text":245,"correct":26},"施工成本管理",{"key":28,"text":247,"correct":22},"安全风险管理",{"key":31,"text":249,"correct":22},"施工技术质量管理",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},1256197,"属于明挖基坑施工特有的监控量测必测项目是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"地表沉降",{"key":24,"text":257,"correct":22},"地下管线沉降",{"key":28,"text":259,"correct":26},"支撑轴力",{"key":31,"text":261,"correct":22},"建筑物沉降",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1256198,"场地地形坡度应有利于填埋场施工和其他建筑设施的布置，原则上地形的自然坡度不应大于（ ）。",[266,268,270,271],{"key":20,"text":267,"correct":22},"6%",{"key":24,"text":269,"correct":26},"5%",{"key":28,"text":189,"correct":22},{"key":31,"text":187,"correct":22},{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},1256199,"小导管注浆，浆液宜采用",[276,278,280,282],{"key":20,"text":277,"correct":22},"石灰砂浆",{"key":24,"text":279,"correct":22},"混合砂浆",{"key":28,"text":281,"correct":22},"环氧砂浆",{"key":31,"text":283,"correct":26},"水泥浆或水泥砂浆",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":28,"analysis":33},1256200,"隧道采用喷锚暗挖法施工时，一般采用拱形结构.下列选项中，不属于拱形结构基本断面形式的是",[288,290,292,294],{"key":20,"text":289,"correct":22},"单拱砖",{"key":24,"text":291,"correct":22},"双拱式",{"key":28,"text":293,"correct":26},"三拱式",{"key":31,"text":295,"correct":22},"多跨连拱式",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":31,"analysis":33},1256201,"下列选项中，属于施工方案编制依据的是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"监理合同",{"key":24,"text":303,"correct":22},"可行性研究报告",{"key":28,"text":305,"correct":22},"各项资源需求量计划",{"key":31,"text":307,"correct":26},"单位工程施工组织设计",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},1256202,"下列选项中，不属于技术准备的是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":22},"会审与学习图纸",{"key":24,"text":315,"correct":22},"编制施工组织设计",{"key":28,"text":317,"correct":22},"技术、安全交底",{"key":31,"text":319,"correct":26},"编制施工记录",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},1256203,"城镇道路设计车速为40-60km\u002Fh的是（ ）",[324,326,328,330],{"key":20,"text":325,"correct":22},"快速路",{"key":24,"text":327,"correct":26},"主干路",{"key":28,"text":329,"correct":22},"次干路",{"key":31,"text":331,"correct":22},"支路",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":28,"analysis":33},1256204,"（ ）是直接同行车和大气相接处的层位，承受行车荷载较大的竖向力、水平力和冲击力的作用，同时又受降水的侵蚀作用和温度变化的影响。",[336,338,340,342],{"key":20,"text":337,"correct":22},"基层",{"key":24,"text":339,"correct":22},"垫层",{"key":28,"text":341,"correct":26},"面层",{"key":31,"text":343,"correct":22},"土基层",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":28,"analysis":33},1256205,"关于给排水工程中圆井砌筑，下列表述错误的是（ ）",[348,350,352,354],{"key":20,"text":349,"correct":22},"砌块应垂直砌筑，上下砌块应错缝砌筑",{"key":24,"text":351,"correct":22},"圆井砌筑时应同时安装踏步",{"key":28,"text":353,"correct":26},"砌块逐层砌筑收口时，偏心收口的每层收进不应大于30mm",{"key":31,"text":355,"correct":22},"内外井壁应采用水泥砂浆勾缝",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},1256206,"依靠墙体自重抵抗墙后土体侧向推力，目前城镇道路常用的挡土墙结构形式是（ ）",[360,362,364,366],{"key":20,"text":361,"correct":26},"重力式挡土墙",{"key":24,"text":363,"correct":22},"衡重式挡土墙",{"key":28,"text":365,"correct":22},"悬臂式挡土墙",{"key":31,"text":367,"correct":22},"扶壁式挡土墙",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},1256207,"焊接质量检验次序正确的是",[372,374,376,378],{"key":20,"text":373,"correct":22},"表面质量检验→对口质量检验→强度和严密性试验→无损探伤检验",{"key":24,"text":375,"correct":26},"对口质量检验→表面质量检验→无损探伤检验→强度和严密性试验",{"key":28,"text":377,"correct":22},"表面质量检验→无损探伤检验→强度和严密性试验→对口质量检验",{"key":31,"text":379,"correct":22},"对口质量检验→无损探伤检验→强度和严密性试验→表面质量检验",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},1256208,"控制基坑变形的主要方法中，下列说法错误的是",[384,386,388,390],{"key":20,"text":385,"correct":26},"增加围护结构和支撑结构的强度",{"key":24,"text":387,"correct":22},"增加围护结构的人士深度",{"key":28,"text":389,"correct":22},"加固基坑内被动区土体",{"key":31,"text":391,"correct":22},"减小每次开挖围护结构处土体的尺寸和开挖支撑时间",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":28,"analysis":33},1256209,"改良沥青混合料拌合时间根据具体情况经试拌确定，以沥青均匀包裹集料为度。间歇式（ ）s，改良沥青混合料的拌合时间适当延长。",[396,398,400,402],{"key":20,"text":397,"correct":22},"20",{"key":24,"text":399,"correct":22},"35",{"key":28,"text":401,"correct":26},"45",{"key":31,"text":403,"correct":22},"50",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":28,"analysis":33},1256210,"热力管道在实施焊接前，应根据焊接工艺试验结果编写焊接工：艺方案。下列选项中不是焊接工艺方案内容的是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":22},"母材性能和焊接材料",{"key":24,"text":411,"correct":22},"焊接结构形式及外形尺寸",{"key":28,"text":413,"correct":26},"焊缝长度及点数的规定",{"key":31,"text":415,"correct":22},"坡口形式及制作方案",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":31,"analysis":33},1256211,"目前基坑围护结构类型可归为6类，SMW工法属于（ ）中的一种。",[420,422,424,426],{"key":20,"text":421,"correct":22},"柱列式W",{"key":24,"text":423,"correct":22},"自立式水泥土挡墙",{"key":28,"text":425,"correct":22},"板桩式",{"key":31,"text":427,"correct":26},"组合式",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},1256212,"关于二灰稳定土的说法，正确的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"抗冻性能比石灰土低",{"key":24,"text":435,"correct":22},"粉煤灰用量越多",{"key":28,"text":437,"correct":22},"收缩性大于水泥土和石灰土",{"key":31,"text":439,"correct":26},"被禁止用于高等级路面的基层",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},1256213,"悬臂浇筑的主要设备是（ ）",[444,446,448,450],{"key":20,"text":445,"correct":22},"移动模架",{"key":24,"text":447,"correct":22},"泵送车",{"key":28,"text":449,"correct":26},"对能行走的挂篮",{"key":31,"text":451,"correct":22},"可移动桅杆式起重机",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},1256214,"竣工图的比例尺宜选用（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"1:10000",{"key":24,"text":459,"correct":22},"1:2000",{"key":28,"text":461,"correct":26},"1:500",{"key":31,"text":463,"correct":22},"1:1000",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":31,"analysis":33},1256215,"垃圾填埋场一般选择在远离居民区的位置，填埋场与居民区的最短距离为（ ）",[468,470,472,474],{"key":20,"text":469,"correct":22},"200m",{"key":24,"text":471,"correct":22},"300m",{"key":28,"text":473,"correct":22},"400m",{"key":31,"text":475,"correct":26},"500m",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},1256216,"关于土围堰施工要求，下列表述错误的是（ ）",[480,482,484,486],{"key":20,"text":481,"correct":22},"围堰填筑应自上游开始至下游合龙",{"key":24,"text":483,"correct":22},"筑堰材料宜用黏性土、粉质黏土或砂质黏土",{"key":28,"text":485,"correct":26},"可在围堰中心部分填筑黏土及黏性土芯墙",{"key":31,"text":487,"correct":22},"围堰外河床上的淤泥、石块、杂物应筑堰前清除",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":28,"analysis":33},1256217,"下列基坑围护结构中。采用钢支撑时可以不设置围檩的是（ ）",[492,494,496,498],{"key":20,"text":493,"correct":22},"钢板桩",{"key":24,"text":495,"correct":22},"钻孔灌注桩",{"key":28,"text":497,"correct":26},"地下连续墙",{"key":31,"text":499,"correct":22},"SMW桩",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},1256218,"沟槽中心线每侧的净宽度不应小于沟槽底部开挖宽度的",[504,506,508,510],{"key":20,"text":505,"correct":26},"1\u002F2",{"key":24,"text":507,"correct":22},"1\u002F3",{"key":28,"text":509,"correct":22},"1\u002F4",{"key":31,"text":511,"correct":22},"1\u002F5",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":28,"analysis":33},1256219,"承担燃气钢质管道、设备焊接的人员，间断焊接工作时间超过（ ）的，再次上岗前应重新",[516,518,520,522],{"key":20,"text":517,"correct":22},"3个月",{"key":24,"text":519,"correct":22},"5个月",{"key":28,"text":521,"correct":26},"6个月",{"key":31,"text":523,"correct":22},"12个月",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":31,"analysis":33},1256220,"地基加固常用方法不包括下列哪一项？",[528,530,532,534],{"key":20,"text":529,"correct":22},"注浆法",{"key":24,"text":531,"correct":22},"深层搅拌法",{"key":28,"text":533,"correct":22},"高压喷射注浆法",{"key":31,"text":535,"correct":26},"旋浆法",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":28,"analysis":33},1256221,"城镇燃气、供热管道施工质量验收的主控项目的合格率应达到100%，而一般项目的合格率不应低于（ ）%，且不符合规范要点的，最大偏差值应在允许偏差的（ ）倍。",[540,542,544,546],{"key":20,"text":541,"correct":22},"80；1",{"key":24,"text":543,"correct":22},"90；1",{"key":28,"text":545,"correct":26},"80；1.5",{"key":31,"text":547,"correct":22},"90；1.5",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":28,"analysis":33},1256222,"水泥混凝土的垫层材料应与路基宽度相同，其最小厚度为",[552,554,556,558],{"key":20,"text":553,"correct":22},"100mm",{"key":24,"text":555,"correct":22},"120mm",{"key":28,"text":557,"correct":26},"150mm",{"key":31,"text":559,"correct":22},"170mm",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":31,"analysis":33},1256223,"桥梁按受力特点分类，不包括下列的（ ）",[564,566,568,570],{"key":20,"text":565,"correct":22},"梁式桥",{"key":24,"text":567,"correct":22},"刚架桥",{"key":28,"text":569,"correct":22},"悬索桥",{"key":31,"text":571,"correct":26},"公路桥",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":31,"analysis":33},1256224,"混凝土浇筑顺序为：对称分层浇捣，每次均应从（ ）、混凝土沿箱梁纵向从低处往高处进行。",[576,578,580,582],{"key":20,"text":577,"correct":22},"从负弯矩区向正弯矩区、从跨中向支点、从悬臂向根部",{"key":24,"text":579,"correct":22},"从正弯矩区向负弯矩区、从跨中向支点、从悬臂向顶部",{"key":28,"text":581,"correct":22},"从负弯矩区向正弯矩区、从跨中向支点、从悬臂向顶部",{"key":31,"text":583,"correct":26},"从正弯矩区向负弯矩区、从跨中向支点、从悬臂向根部",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":31,"analysis":33},1256225,"装配式桥梁构件在吊装时，混凝土的强度一般不得低于设计强度的（ ）",[588,589,591,593],{"key":20,"text":65,"correct":22},{"key":24,"text":590,"correct":22},"45%",{"key":28,"text":592,"correct":22},"55%",{"key":31,"text":594,"correct":26},"75%",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":24,"analysis":33},1256226,"当基坑开挖不很深，基坑涌水量不大时，宜于选用的降水方法是（ ）",[599,601,603,605],{"key":20,"text":600,"correct":22},"轻型井点法",{"key":24,"text":602,"correct":26},"集水明排法",{"key":28,"text":604,"correct":22},"管井法",{"key":31,"text":606,"correct":22},"喷射井点法",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":20,"analysis":33},1256227,"现浇预应力钢筋混凝土连续梁钢筋骨架的施焊顺序，宜由骨架的（ ）进行。",[611,613,615,617],{"key":20,"text":612,"correct":26},"中间到两边，对称地向两端",{"key":24,"text":614,"correct":22},"中间到两边，不对称地向两端",{"key":28,"text":616,"correct":22},"两边到中间，对称地",{"key":31,"text":618,"correct":22},"两边到中间，不对称地",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]