[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,4,50,812,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1256128,1,"单选题","（ ）又称连锁置换法或连环替代法。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","比较法",false,{"key":24,"text":25,"correct":26},"B","因素分析法",true,{"key":28,"text":29,"correct":22},"C","差额计算法",{"key":31,"text":32,"correct":22},"D","比率法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1256129,"管道安装时，承插口管应将插口（ ），承口（ ）方向，安装宜（ ）进行。",[38,40,42,44],{"key":20,"text":39,"correct":22},"逆水流顺水流由下游往上游",{"key":24,"text":41,"correct":22},"逆水流顺水流由上游往下游",{"key":28,"text":43,"correct":26},"顺水流逆水流由下游往上游",{"key":31,"text":45,"correct":22},"顺水流逆水流由上游往下游",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1256130,"砍伐城市树木，必须经城市人民政府（ ）部门批准，并按规定补植或采取补救措施。",[50,52,54,56],{"key":20,"text":51,"correct":26},"城市绿化行政主管",{"key":24,"text":53,"correct":22},"城市绿化规划",{"key":28,"text":55,"correct":22},"城市园林绿化",{"key":31,"text":57,"correct":22},"城市绿化管理",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1256131,"下列关于悬臂浇筑混凝土连续梁合龙的说法中，错误的是",[62,64,66,68],{"key":20,"text":63,"correct":22},"合龙顺序一般是先边跨，后次跨，再中跨",{"key":24,"text":65,"correct":22},"合龙段长度宜为2m",{"key":28,"text":67,"correct":22},"合龙宜在一天中气温最低时进行",{"key":31,"text":69,"correct":26},"梁跨体系转换时，支座反力的调整应以变形控制为主",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1256132,"路基施工时，填土方段内应事先找平，当地面坡度陡于1：5时，需修台阶形式，每层台阶高度不宜大于（ ）mm，宽度不宜小于（ ）m。",[74,76,78,80],{"key":20,"text":75,"correct":22},"200；1.0",{"key":24,"text":77,"correct":22},"200；1.5",{"key":28,"text":79,"correct":22},"300；1.5",{"key":31,"text":81,"correct":26},"300；1.0",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1256133,"在地层条件差、断面特别大时，浅埋暗挖法修建隧道应采用（ ）施工。",[86,88,90,92],{"key":20,"text":87,"correct":22},"全断面法",{"key":24,"text":89,"correct":26},"中洞法",{"key":28,"text":91,"correct":22},"中隔壁法",{"key":31,"text":93,"correct":22},"双侧壁导坑法",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1256134,"施工组织设计分为施工组织总设计与（ ）组织设计。",[98,100,102,104],{"key":20,"text":99,"correct":22},"分项工程",{"key":24,"text":101,"correct":22},"项目工程",{"key":28,"text":103,"correct":26},"单位工程",{"key":31,"text":105,"correct":22},"分部工程",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1256135,"地下连续墙挖槽方式中没有的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"抓斗式",{"key":24,"text":113,"correct":22},"冲击式",{"key":28,"text":115,"correct":22},"回转式",{"key":31,"text":117,"correct":26},"组合式",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1256136,"下列哪些工程需要组织专家对专项方案进行论证。（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"毗邻一高层砖混居民楼的开挖深度4.5m的基坑工程",{"key":24,"text":125,"correct":22},"搭设高度6m的混凝土模板工程",{"key":28,"text":127,"correct":22},"开挖深度15m的人工挖孔桩工程",{"key":31,"text":129,"correct":22},"搭设高度24m的落地式钢管脚手架工程",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1256137,"下列关于各种开挖方法的描述中，错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"单侧壁导坑法适用于地层差、跨度≤14m，沉降较小，防水好。",{"key":24,"text":137,"correct":22},"中洞法适用于小跨度、连续使用可扩成大跨度，沉降小，防水效果差",{"key":28,"text":139,"correct":22},"侧洞法适用于小跨度、连续使用可扩成大跨度，沉降大，防水效果差",{"key":31,"text":141,"correct":22},"柱洞法适用于多跨多层结构，沉降大，防水效果差",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1256138,"某公司计划编制施工组织设计，已收集和熟悉了相关资料，调查了项目特点和施工条件，计算了主要工种的工程量，确定了施工的总体部署，接下来应进行的工作是（ ）",[146,148,150,152],{"key":20,"text":147,"correct":26},"拟定施工方案",{"key":24,"text":149,"correct":22},"编制总进度计划",{"key":28,"text":151,"correct":22},"编制资源需求计划",{"key":31,"text":153,"correct":22},"编制施工准备工作计划",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1256139,"清孔后的沉渣厚度应符合设计要求。设计未规定时，摩擦桩的沉渣厚度不应大于（ ）mm；端承桩的沉渣厚度不应大于（ ）mm。",[158,160,162,164],{"key":20,"text":159,"correct":22},"500；200",{"key":24,"text":161,"correct":22},"400；200",{"key":28,"text":163,"correct":22},"400；100",{"key":31,"text":165,"correct":26},"300；100",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1256140,"关于市政工程竣工图，下列说法错误的是（ ）",[170,172,174,176],{"key":20,"text":171,"correct":22},"包括施工图相对应的全部图纸",{"key":24,"text":173,"correct":26},"编绘完成后，应经监理单位和施工单位技术负责人审核会签",{"key":28,"text":175,"correct":22},"比例尺宜选用1500",{"key":31,"text":177,"correct":22},"平面布置改变超过原图1\u002F3时，应重新绘制竣工图",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1256141,"向钻施工管道通称为“拖拉管”施工，适用于沙土、鼎土、卵石软土到硬岩多种土壤条件，我国大部分非硬岩地区都可施工。工作环境温度为-15~45℃。适用于管径（ ）的钢管、塑料管，最大铺管长度度可达1500m。",[182,184,186,188],{"key":20,"text":183,"correct":26},"?300~?1200",{"key":24,"text":185,"correct":22},"?500~?1200",{"key":28,"text":187,"correct":22},"?300~?2000",{"key":31,"text":189,"correct":22},"?500~?2000",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1256142,"热拌热铺沥青混合料路面完工后，按规范要求表面温度低于（ ）℃后，方可开放交通。",[194,196,198,200],{"key":20,"text":195,"correct":22},"40",{"key":24,"text":197,"correct":26},"50",{"key":28,"text":199,"correct":22},"60",{"key":31,"text":201,"correct":22},"70",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1256143,"施工组织设计的核心部分是指（ ）\\t。",[206,208,210,212],{"key":20,"text":207,"correct":22},"工程概况",{"key":24,"text":209,"correct":22},"进度计划",{"key":28,"text":211,"correct":22},"编制依据",{"key":31,"text":213,"correct":26},"施工方案",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1256144,"当基坑开挖较浅、尚未设支撑时，维护墙体的水平变形表现为",[218,220,222,224],{"key":20,"text":219,"correct":26},"墙顶位移最大，向基坑方向水平位移",{"key":24,"text":221,"correct":22},"墙顶位移最小，向基坑方向水平位移，呈三角形分布",{"key":28,"text":223,"correct":22},"墙顶位移最大，向基坑外方向水平位移",{"key":31,"text":225,"correct":22},"墙顶位移最小，向基坑外方向水平位移，呈三角形分布",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1256145,"主要作用是装吊锤和桩，并且控制锤的运动方向的沉桩设备是（",[230,232,234,236],{"key":20,"text":231,"correct":22},"桩基",{"key":24,"text":233,"correct":22},"桩顶",{"key":28,"text":235,"correct":26},"桩接送桩",{"key":31,"text":237,"correct":22},"接送桩",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},1256146,"在进行给排水管道功能性试验时，压力管道水压试验的管段长度不宜大于",[242,244,246,248],{"key":20,"text":243,"correct":22},"100m",{"key":24,"text":245,"correct":22},"200m",{"key":28,"text":247,"correct":26},"1.Okm",{"key":31,"text":249,"correct":22},"2.Okm",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1256147,"已灌注混凝土强度水平施工缝处不应低于（ ）MPa，垂直施工缝处不应低于MPa，选项正确的是",[254,256,258,260],{"key":20,"text":255,"correct":22},"1.2；2.0",{"key":24,"text":257,"correct":26},"1.2；2.5",{"key":28,"text":259,"correct":22},"1.5；2.0",{"key":31,"text":261,"correct":22},"1.5；2.5",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1256148,"沟槽的支撑应在管道两侧及管顶以上0．5m回填完毕并压实后，在保证安全的情况下进行拆除，并应采用（ ）填实缝隙。",[266,268,270,272],{"key":20,"text":267,"correct":26},"细砂",{"key":24,"text":269,"correct":22},"级配砂石",{"key":28,"text":271,"correct":22},"灰土",{"key":31,"text":273,"correct":22},"冻土",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},1256149,"垃圾填满场泥质防水层施工技术的核心是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"选择防渗层的土源",{"key":24,"text":281,"correct":22},"现场摊铺、压实",{"key":28,"text":283,"correct":22},"选择抗渗配比",{"key":31,"text":285,"correct":26},"膨润土拌合土层施上",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1256150,"关于石方路基施工要点，下列说法错误的是（ ）",[290,292,294,296],{"key":20,"text":291,"correct":22},"先修筑试验段，以确定松铺厚度、压实机具组合、压实遍数及沉降差等施工参数",{"key":24,"text":293,"correct":26},"修筑填石路堤应进行地表清理，先码砌中部，然后逐层水平填筑石料，确保边坡稳定",{"key":28,"text":295,"correct":22},"填石路堤宜选用12t以上的振动压路机",{"key":31,"text":297,"correct":22},"路基范围内管线、构筑物四周的沟槽宜回填土料",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":28,"analysis":33},1256151,"按风险的（ ）可分为项目风险、国别风险和地区风险。",[302,304,306,308],{"key":20,"text":303,"correct":22},"严峻程度",{"key":24,"text":305,"correct":22},"工程实施不同阶段",{"key":28,"text":307,"correct":26},"范围",{"key":31,"text":309,"correct":22},"来源",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1256152,"（ ）适用于中砂地基，黏土地基中若有适宜的排水条件也可采用（ ）",[314,316,318,320],{"key":20,"text":315,"correct":22},"渗透注浆",{"key":24,"text":317,"correct":22},"劈裂注浆",{"key":28,"text":319,"correct":26},"压密注浆",{"key":31,"text":321,"correct":22},"电动化学注浆",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},1256153,"柔性管道地基处理宜采用的地基处理形式是",[326,328,330,332],{"key":20,"text":327,"correct":22},"混凝土桩",{"key":24,"text":329,"correct":22},"钢筋混凝土桩",{"key":28,"text":331,"correct":26},"砂桩",{"key":31,"text":333,"correct":22},"人工挖孔桩",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":28,"analysis":33},1256154,"用于城镇快速路的沥青表面层粗集料的吸水率（ ）",[338,340,342,344],{"key":20,"text":339,"correct":22},"不大于1.0%",{"key":24,"text":341,"correct":22},"大于1.0%",{"key":28,"text":343,"correct":26},"不大于2.0%",{"key":31,"text":345,"correct":22},"大于2.0%",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1256155,"给水排水厂站的构筑物中，钢筋混凝土水池的结构混凝土在设计上不被要求的性能是（ ）",[350,352,354,356],{"key":20,"text":351,"correct":26},"防腐",{"key":24,"text":353,"correct":22},"抗渗",{"key":28,"text":355,"correct":22},"抗裂",{"key":31,"text":357,"correct":22},"抗冻",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},1256156,"利用道路桥梁跨越河流的燃气管道，其管道的输送压力不应大于",[362,364,366,368],{"key":20,"text":363,"correct":26},"0.4MPa",{"key":24,"text":365,"correct":22},"1.0MPa",{"key":28,"text":367,"correct":22},"1.5MPa",{"key":31,"text":369,"correct":22},"0.1MPa",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":28,"analysis":33},1256157,"粘聚力较大，但内摩擦角较小，高温稳定性较差的沥青混合料结构是（ ）",[374,376,378,380],{"key":20,"text":375,"correct":22},"骨架一空隙结构",{"key":24,"text":377,"correct":22},"骨架一密实结构",{"key":28,"text":379,"correct":26},"密实一悬浮结构",{"key":31,"text":381,"correct":22},"空隙一悬浮结构",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},1256158,"箱涵顶进施工流程中，顶进设备安装的紧后工艺流程是（ ）",[386,388,390,392],{"key":20,"text":387,"correct":26},"既有线加固",{"key":24,"text":389,"correct":22},"箱涵试顶",{"key":28,"text":391,"correct":22},"吃土顶进",{"key":31,"text":393,"correct":22},"监控量测",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},1256159,"管棚超前支护是为了在特殊条件下安全开挖，预先提供增强地层承载力的（ ）支护方法，对控制塌方和抑制地表沉降有明显的效果。",[398,400,402,404],{"key":20,"text":399,"correct":26},"临时",{"key":24,"text":401,"correct":22},"永久",{"key":28,"text":403,"correct":22},"强力",{"key":31,"text":405,"correct":22},"附加",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},1256160,"以下哪项工艺流程适用于处理浊度和色度较低、水质稳定、变化小且无藻类繁殖的湖泊水和水库水？（ ）",[410,412,414,416],{"key":20,"text":411,"correct":22},"原水—简单处理（如筛网滤过或消毒）",{"key":24,"text":413,"correct":26},"原水—接触过滤—消毒",{"key":28,"text":415,"correct":22},"原水—混凝、沉淀或澄清—过滤—消毒",{"key":31,"text":417,"correct":22},"原水—调蓄预沉—自然沉淀—过滤—消毒",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},1256161,"以下对垃圾填埋场施工技术描述错误的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"掺加膨胀土的拌合土层是泥质防水层的技术核心",{"key":24,"text":425,"correct":22},"膨胀土的检测项目是掺加量和渗水试验",{"key":28,"text":427,"correct":22},"土工合成材料膨润土垫（GCL）施工必须在平整土地上进行",{"key":31,"text":429,"correct":26},"HDPE膜不得在夏季施工",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},1256162,"燃气管道回填土夯实到管顶0．3~0．5rn以后，应在管道位置上方平敷塑料标志带，标志带的颜色是（ ）",[434,436,438,440],{"key":20,"text":435,"correct":26},"黄色",{"key":24,"text":437,"correct":22},"蓝色",{"key":28,"text":439,"correct":22},"红色",{"key":31,"text":441,"correct":22},"绿色",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},1256163,"下列关于钢板桩围堰的施工要求错误的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"有大漂石及坚硬岩石的河床不宜使用钢板桩围堰",{"key":24,"text":449,"correct":22},"施打钢板桩时，必须备有导向设备，以保证钢板桩的正确位置",{"key":28,"text":451,"correct":22},"施打钢板桩前，应对钢板桩的锁口用止水材料捻缝，以防漏水",{"key":31,"text":453,"correct":26},"施打顺序一般从下游向上游合龙",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},1256164,"钢筋混凝土工程中，HRB335、HRB400钢筋的冷拉率不得大于",[458,460,462,464],{"key":20,"text":459,"correct":22},"0.50%",{"key":24,"text":461,"correct":22},"2%",{"key":28,"text":463,"correct":22},"1.50%",{"key":31,"text":465,"correct":26},"1%",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},1256165,"已铺好的混凝土，应迅速振捣密实，并控制混凝土振动时间，不宜少于30s，移动间距不宜大于（ ）mm，以达到表面不再下沉并泛出水泥浆为准。",[470,472,474,476],{"key":20,"text":471,"correct":26},"500",{"key":24,"text":473,"correct":22},"400",{"key":28,"text":475,"correct":22},"300",{"key":31,"text":477,"correct":22},"200",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},1256166,"刃脚的垫层除采用砂垫层上铺垫木或素混凝土，还应满足的要求说法不正确的是（ ）",[482,484,486,488],{"key":20,"text":483,"correct":22},"垫层的结构厚度和宽度应根据土体地基承载力、沉井下沉结构高度和结构形式，经计算确定",{"key":24,"text":485,"correct":26},"素混凝土还应便于沉井下沉后凿除",{"key":28,"text":487,"correct":22},"垫层分布在刃脚中心线的两侧范围，应考虑方便抽除垫木",{"key":31,"text":489,"correct":22},"砂垫层宜采用中粗砂，并应分层铺设、分层夯实",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":28,"analysis":33},1256167,"钢筋切断机按照结构型式分为（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"横式和竖式",{"key":24,"text":497,"correct":22},"卧式和竖式",{"key":28,"text":499,"correct":26},"卧式和立式",{"key":31,"text":501,"correct":22},"横式和立式",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},1256168,"沉人桩施工中，沉桩时终止锤击的控制是以（ ）为主.",[506,508,510,512],{"key":20,"text":507,"correct":22},"桩的人土深度",{"key":24,"text":509,"correct":22},"贯入度",{"key":28,"text":511,"correct":22},"锤击力",{"key":31,"text":513,"correct":26},"桩端设计标高",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},1256169,"燃气管道可根据敷设方式、输气压力和（ ）分类。",[518,520,522,524],{"key":20,"text":519,"correct":22},"管道管径大小",{"key":24,"text":521,"correct":26},"用途",{"key":28,"text":523,"correct":22},"管道长度",{"key":31,"text":525,"correct":22},"管道材质",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":20,"analysis":33},1256170,"施工成本管理的基本流程正确的是（ ）",[530,532,534,536],{"key":20,"text":531,"correct":26},"成本预测→管理决策→管理计划→过程控制→成本核算→分析和考核",{"key":24,"text":533,"correct":22},"成本预测→管理计划→管理决策→过程控制→成本核算→分析和考核",{"key":28,"text":535,"correct":22},"成本核算→成本预測→管理决策→管理计划→过程控制→分析和考核",{"key":31,"text":537,"correct":22},"成本核算→成本预测→管理决策→管理计划→过程控制→分析和考核",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":28,"analysis":33},1256171,"管棚施工的工艺流程是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"测放孔位—钻机就位—压入钢管—水平钻孔—注浆—封口一开挖",{"key":24,"text":545,"correct":22},"测放孔位—钻机就位—水平钻孔—注浆—压人钢管—封口一开挖",{"key":28,"text":547,"correct":26},"测放孔位一钻机就位—水平钵孔一压入钢管一注浆—封口—开挖",{"key":31,"text":549,"correct":22},"测放孔位—压入钢管—钻机就位—水平钻孔—注浆—封口—开挖",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},1256172,"关于锤击沉桩法特点的表述，不正确的是（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":26},"由于沉桩时产生的噪声和振动较小，所以可在人口稠密的地方采用",{"key":24,"text":557,"correct":22},"各种桩锤的施工效果在某种程度上受地层、地质、桩重和桩长等条件的限制，因此需注意选用",{"key":28,"text":559,"correct":22},"锤击沉桩是在桩将土向外侧推挤的同时而贯入的施工方法",{"key":31,"text":561,"correct":22},"由于沉桩时会产生较大的噪声和振动，在人口稠密的地方一般不宜采用",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},1256173,"拱形涵的拱圈和拱上端墙正确的施工形式（ ）",[566,568,570,572],{"key":20,"text":567,"correct":22},"由中间向两侧同时、对称施工",{"key":24,"text":569,"correct":26},"由两侧向中间同时、对称施工",{"key":28,"text":571,"correct":22},"顺时针方向施工",{"key":31,"text":573,"correct":22},"逆时针方向施工",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},1256174,"无压管道安装完毕检查合格后，做闭水检验时，向管道内充水并应保持（ ）",[578,580,582,584],{"key":20,"text":579,"correct":22},"下游管内顶以上2m.水头压力",{"key":24,"text":581,"correct":26},"上游管内顶以上2m水头压力",{"key":28,"text":583,"correct":22},"本管段管内2m以上水头压力",{"key":31,"text":585,"correct":22},"上游管外顶以上1m水头压力",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},1256175,"分包企业签署质量合格的文件上，必须由（ ）的注册建造师签章。",[590,592,594,596],{"key":20,"text":591,"correct":22},"分包企业",{"key":24,"text":593,"correct":26},"担任总包项目负责人",{"key":28,"text":595,"correct":22},"担任分包企业质量负责人",{"key":31,"text":597,"correct":22},"担任总包项目质量负责人",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":20,"analysis":33},1256176,"（ ）是对工程规模、结构形式、施工的条件和特点等所作的简要介绍。",[602,603,604,605],{"key":20,"text":207,"correct":26},{"key":24,"text":103,"correct":22},{"key":28,"text":103,"correct":22},{"key":31,"text":606,"correct":22},"施工组织总设计",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":20,"analysis":33},1256177,"适用于水深3m以内，水流流速1.5m\u002Fs以内，河床土质渗水较小时的围堰是（ ）。",[611,613,615,617],{"key":20,"text":612,"correct":26},"土袋围堰",{"key":24,"text":614,"correct":22},"钢板桩围堰",{"key":28,"text":616,"correct":22},"套箱围堰",{"key":31,"text":618,"correct":22},"钢筋混凝土板桩围堰",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]