[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,3,50,812,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,249,261,273,285,297,309,321,333,345,357,367,377,389,401,413,425,434,446,456,468,480,492,504,516,528,540,552,564,576,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1256077,1,"单选题","注浆加固时水泥渗人量不宜小于（ ），水泥土加固体的28d龄期无侧限抗压强比原始土体的强度提高2-3倍。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","100kg\u002Fm3",false,{"key":24,"text":25,"correct":26},"B","120kg\u002Fm3",true,{"key":28,"text":29,"correct":22},"C","140kg\u002Fm3",{"key":31,"text":32,"correct":22},"D","160kg\u002Fm3","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1256078,"施工计划调度包括：项目部成立施工调度组织、监督检查计划执行情况；定期召开施工现场调度会（例会）解决存在问题，检查落实会议决议；（ ）负责编写施工日志。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目负责人",{"key":24,"text":41,"correct":22},"技术负责人",{"key":28,"text":43,"correct":22},"施工员",{"key":31,"text":45,"correct":26},"专人",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1256079,"高压喷射注浆的单管法、双管法、三管法，由于他们喷射流的结构和喷射的介质不同，有效处理长度也不同，以（ ）最长，（ ）次之，（ ）最短，答案应是（ ）",[50,52,54,56],{"key":20,"text":51,"correct":22},"双管法、三管法、单管法",{"key":24,"text":53,"correct":26},"三管法、双管法、单管法",{"key":28,"text":55,"correct":22},"单管法、三管法、双管法",{"key":31,"text":57,"correct":22},"三管法、单管法、双管法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1256080,"气管道焊口在使用聚乙烯防腐涂层进行防腐时，在防腐层涂装前，对钢管表面处理等级（ ）",[62,64,66,68],{"key":20,"text":63,"correct":22},"Sal级",{"key":24,"text":65,"correct":22},"Sa2级",{"key":28,"text":67,"correct":26},"Sa2.5级",{"key":31,"text":69,"correct":22},"Sa3级",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1256081,"沉井施工采用（ ）助沉时，泥浆补给应及时，以保证泥浆液面高度.",[74,76,78,80],{"key":20,"text":75,"correct":22},"空气幕",{"key":24,"text":77,"correct":22},"射水",{"key":28,"text":79,"correct":26},"触变泥浆套",{"key":31,"text":81,"correct":22},"静压",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1256082,"下列雨期道路工程施工质量保证措施中，属于面层施工要求的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"当天挖完、填完、压完，不留后患",{"key":24,"text":89,"correct":22},"应按2%-3%横坡整平压实，以防积水",{"key":28,"text":91,"correct":22},"未碾压的料层受雨淋后，应进行测试分析，按配合比要求重新搅拌",{"key":31,"text":93,"correct":26},"及时浇筑、振动、抹面成型、养护",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1256083,"（ ）主要用于确定施工机具类型、数量、进场时间，可据此落实施工机具来源，组织进场。",[98,100,102,104],{"key":20,"text":99,"correct":26},"施工机械需要量计划",{"key":24,"text":101,"correct":22},"施工机具采购计划",{"key":28,"text":103,"correct":22},"施工机械购置计划",{"key":31,"text":105,"correct":22},"施工机械备案表",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1256085,"下列有关施工场地的要求不正确的是",[110,112,114,116],{"key":20,"text":111,"correct":26},"施工道路应当平整坚实.硬化材料可以采用混凝土、预制块或用石屑、焦渣、砂头等压实整平.保证不沉陷、不扬尘.防止泥土带人市政道路.",{"key":24,"text":113,"correct":22},"施工现场应设置排水系统及沉淀池.现场废水不得直接排入市政污水管网和河流",{"key":28,"text":115,"correct":22},"场地应当平整.无障碍物.无坑洼和凹凸不平.雨季不积水.暖季应适当绿化",{"key":31,"text":117,"correct":22},"现场存放的化学品等应设有专门的库房.库房地面应进行防渗漏处理",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1256086,"经二级处理后，BOD5去除率可达（ ）以上，二沉池出水能达标排放。",[122,124,126,128],{"key":20,"text":123,"correct":22},"85%",{"key":24,"text":125,"correct":26},"90%",{"key":28,"text":127,"correct":22},"95%",{"key":31,"text":129,"correct":22},"100%",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1256087,"关于用各种起吊机具设备吊放梁、板的说法，错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"起吊混凝土梁板时，捆绑吊点位置应按设计规定或根据计算决定",{"key":24,"text":137,"correct":22},"吊移板式构件时，不得吊错板梁的上、下面，防止折断",{"key":28,"text":139,"correct":22},"构件移运、停放的支承位置应与吊点位置一致，并应支承稳固",{"key":31,"text":141,"correct":26},"混凝土梁、板经过验算不会发生超容许应力情况时，可采用一个吊点在梁的重心起吊",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1256088,"张拉设备的标准期限不得超过（ ），且不得超过200次张拉作业。",[146,148,150,152],{"key":20,"text":147,"correct":22},"3个月",{"key":24,"text":149,"correct":26},"半年",{"key":28,"text":151,"correct":22},"9个月",{"key":31,"text":153,"correct":22},"一年",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1256089,"下列有关给水与污水处理厂单机试车的要求不正确的是哪项？（",[158,160,162,164],{"key":20,"text":159,"correct":26},"单机试车，一般空车试运行不少于1小时",{"key":24,"text":161,"correct":22},"各执行机构运作调试完毕，动作反应正确",{"key":28,"text":163,"correct":22},"自动控制系统的信号元件及元件动作正常",{"key":31,"text":165,"correct":22},"检测并记录单机运行数据",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1256090,"涵洞施工的准备工作不包括（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"施工放样",{"key":24,"text":173,"correct":26},"二次核对",{"key":28,"text":175,"correct":22},"绘制施工详图",{"key":31,"text":177,"correct":22},"现场核对",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1256091,"下列关于法兰连接的描述中，正确的是（ ）",[182,184,186,188],{"key":20,"text":183,"correct":22},"当垫片需要拼接时，应采用直缝对接",{"key":24,"text":185,"correct":22},"法兰外侧应进行封底焊",{"key":28,"text":187,"correct":26},"法兰距支架或墙面的净距不应小于200mm",{"key":31,"text":189,"correct":22},"可采用先加垫片并拧紧法兰螺栓，再焊接法兰焊口的方式进行法兰安装焊接",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1256092,"当软土层厚度小于（ ）m，且位于水下或为含水量极高的淤泥时，可使用抛石挤淤。",[194,196,198,200],{"key":20,"text":195,"correct":22},"10",{"key":24,"text":197,"correct":22},"2.0",{"key":28,"text":199,"correct":26},"3.0",{"key":31,"text":201,"correct":22},"5.0",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1256093,"在深基坑的施工支护结构中，钢支撑体系平面布置形式一般不包括（ ）",[206,208,210,212],{"key":20,"text":207,"correct":22},"对撑",{"key":24,"text":209,"correct":26},"斜撑",{"key":28,"text":211,"correct":22},"角撑",{"key":31,"text":213,"correct":22},"井字撑",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},1256094,"工程竣工验收合格之日起15d内，（ ）应向工程所在地的县级以上地方人民政府建设行政主管部门备案。",[218,220,222,224],{"key":20,"text":219,"correct":22},"设计单位",{"key":24,"text":221,"correct":22},"施工单位",{"key":28,"text":223,"correct":26},"建设单位",{"key":31,"text":225,"correct":22},"监理单位",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1256095,"浅埋暗挖法的主要开挖方法中。沉降大的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"正台阶环形开挖法",{"key":24,"text":233,"correct":22},"CRD法",{"key":28,"text":235,"correct":22},"CD法",{"key":31,"text":237,"correct":26},"双侧壁导坑法",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},1256096,"预应力筋张拉后，应及时进行孔道压浆，多跨连续有连接器的预应力筋孔道，应张拉完一段灌注一段；孔道压浆宜采用水泥浆，水泥浆应符合设计要求，如设计无要求，则不能低于（ ）MPa。",[242,243,245,247],{"key":20,"text":195,"correct":22},{"key":24,"text":244,"correct":22},"20",{"key":28,"text":246,"correct":26},"30",{"key":31,"text":248,"correct":22},"40",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":28,"analysis":33},1256097,"下列哪种方法不属于施工成本目标控制的方法（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"人工费的控制",{"key":24,"text":256,"correct":22},"材料费的控制",{"key":28,"text":258,"correct":26},"加班时间的控制",{"key":31,"text":260,"correct":22},"施工机械使用费的控制",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1256098,"完成第（ ）次清孔后，应立即开始灌注混凝土，若因故推迟灌注混凝土，应重新进行清孔。",[265,267,269,271],{"key":20,"text":266,"correct":22},"一",{"key":24,"text":268,"correct":26},"二",{"key":28,"text":270,"correct":22},"三",{"key":31,"text":272,"correct":22},"四",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},1256099,"泥质防水层的施工控制要点不包括（ ）",[277,279,281,283],{"key":20,"text":278,"correct":22},"控制检验频率和质量标准",{"key":24,"text":280,"correct":22},"拌和均匀度、含水量及碾压压实度",{"key":28,"text":282,"correct":22},"膨润土进货质量",{"key":31,"text":284,"correct":26},"对比多组土样，实验室确定配合比",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},1256100,"路基施工时，填方地段施工，应留（ ）的横坡整平压实，以防积水。",[289,291,293,295],{"key":20,"text":290,"correct":22},"1%-2%",{"key":24,"text":292,"correct":26},"2%-3%",{"key":28,"text":294,"correct":22},"3%-4%",{"key":31,"text":296,"correct":22},"4%-5%",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":28,"analysis":33},1256101,"可根据不同情况乃下沉窩府佈丁设备、旅土方法等，采用压钢轨、型钢、接高混凝土筒壁等方法，使沉井下沉的辅助措施是（．）。",[301,303,305,307],{"key":20,"text":302,"correct":22},"空气幕下沉",{"key":24,"text":304,"correct":22},"泥浆润滑下沉",{"key":28,"text":306,"correct":26},"压重下沉",{"key":31,"text":308,"correct":22},"射水下沉",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1256102,"在污水一级处理工艺中，主要针对水中悬浮物质的常用处理方法是（ ）",[313,315,317,319],{"key":20,"text":314,"correct":26},"物理方法",{"key":24,"text":316,"correct":22},"化学方法",{"key":28,"text":318,"correct":22},"生物方",{"key":31,"text":320,"correct":22},"生化方法",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},1256103,"（ ）可每月组织一次，由项目经理带领，组织项目部各部门负责人参加，对项目现场当时施工的资源配置、人员活动、实物状态、环境条件、管理里行为等进行全方位的安全检查。",[325,327,329,331],{"key":20,"text":326,"correct":22},"安全巡查",{"key":24,"text":328,"correct":22},"季节性安全检查",{"key":28,"text":330,"correct":22},"专项安全检查",{"key":31,"text":332,"correct":26},"综合安全检查",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},1256104,"热力网管道的干线、支干线、支线的起点应安装（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":26},"关断阀门",{"key":24,"text":340,"correct":22},"自动流量调节阀",{"key":28,"text":342,"correct":22},"旁通阀",{"key":31,"text":344,"correct":22},"安全阀",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":28,"analysis":33},1256105,"（ ）是在施工组织设计的基础上，针对新技术、新工艺、新材料、新设备以及危险性较大、复杂的、重要的和缺乏施工经验的分部分项工程单独编制的技术文件。",[349,351,353,355],{"key":20,"text":350,"correct":22},"施工组织总设计",{"key":24,"text":352,"correct":22},"单位施工组织设计",{"key":28,"text":354,"correct":26},"专项施工方案",{"key":31,"text":356,"correct":22},"施工规划",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1256106,"某公司承接了 A、B两区之间的快速路施工任务，该快速路由五段道路、一座桥梁、两座涵洞组成，针对该桥梁编制的施工组织设计应属于（ ）。",[361,362,364,365],{"key":20,"text":356,"correct":22},{"key":24,"text":363,"correct":26},"单位工程施工组织设计",{"key":28,"text":350,"correct":22},{"key":31,"text":366,"correct":22},"施工方案",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":28,"analysis":33},1256107,"因工程建设需要挖掘城市道路的，应持（ ）批准签发的文件到有关部门办理审批手续。",[371,372,373,375],{"key":20,"text":223,"correct":22},{"key":24,"text":225,"correct":22},{"key":28,"text":374,"correct":26},"城市规划部门",{"key":31,"text":376,"correct":22},"公安交通部门",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},1256108,"先张法生产的构件中，预应力筋锚固属于（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"支承锚固",{"key":24,"text":384,"correct":26},"握寡锚固",{"key":28,"text":386,"correct":22},"楔紧锚固",{"key":31,"text":388,"correct":22},"组合锚固",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},1256109,"法兰与法兰、法兰与管道应保持同轴，螺栓孔中心偏差不得超过孔径的（ ）",[393,395,397,399],{"key":20,"text":394,"correct":22},"2%",{"key":24,"text":396,"correct":22},"3%",{"key":28,"text":398,"correct":22},"4%",{"key":31,"text":400,"correct":26},"5%",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":31,"analysis":33},1256110,"采用预制混凝土管作为柱式墩台身外模时，预制管安装应符合下列规定，其中错误的是（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"基础面宜采用凹槽接头，凹槽深度不得小于50mm",{"key":24,"text":408,"correct":22},"上下管节安装就位后，应采用四根竖方木对称设置在管柱四周并绑扎牢固，防止撞击错位",{"key":28,"text":410,"correct":22},"混凝土管外模应设斜撑，保证浇筑时的稳定",{"key":31,"text":412,"correct":26},"管节接缝应采用同强度等级混凝土密封",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":28,"analysis":33},1256111,"城市污水处理方法中，不属于物理处理法的是（ ）：",[417,419,421,423],{"key":20,"text":418,"correct":22},"筛滤法",{"key":24,"text":420,"correct":22},"气浮法",{"key":28,"text":422,"correct":26},"萃取法",{"key":31,"text":424,"correct":22},"沉淀法",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},1256112,"对于超过一定规模的危险性较大的分部分项工程的专项施工方案，应由（ ）组织专家论证、审查。",[429,431,432,433],{"key":20,"text":430,"correct":22},"政府主管部门",{"key":24,"text":223,"correct":22},{"key":28,"text":225,"correct":22},{"key":31,"text":221,"correct":26},{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},1256113,"下列有关水池施工降、排水要求说法不正确的是",[438,440,442,444],{"key":20,"text":439,"correct":22},"选择可靠的降低水位方法，严格进行降水施工，对降水所用机具随时做好保养维护，并有备用机具",{"key":24,"text":441,"correct":26},"在施工过程中要间断性的降排水，并应对降、排水系统进行检查和维护",{"key":28,"text":443,"correct":22},"降、排水应输送至抽水影响半径范围以外的河道或排水管道，并防止环境水源进入施工基坑",{"key":31,"text":445,"correct":22},"基坑承受压水影响时，应进行承压水降压的影响进行评估",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},1256114,"涵洞施工完成后，当涵洞砌体砂浆或混凝土强度达到设计强度的（ ）时，方可进行填土.",[450,452,454,455],{"key":20,"text":451,"correct":22},"50%.",{"key":24,"text":453,"correct":26},"75%",{"key":28,"text":125,"correct":22},{"key":31,"text":129,"correct":22},{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},1256115,"盖梁支架和脚手架的地基处理应按施工组织设计要求进行，一般采取先用压路机碾压，人工整平后，再在土基上铺设（ ）碎石，然后铺设150mm混凝土的方法处理。",[460,462,464,466],{"key":20,"text":461,"correct":22},"50mm",{"key":24,"text":463,"correct":26},"100mm",{"key":28,"text":465,"correct":22},"150mm",{"key":31,"text":467,"correct":22},"200mm",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":28,"analysis":33},1256116,"下列关于导管要求说法错误的是",[472,474,476,478],{"key":20,"text":473,"correct":22},"导管内壁应光滑圆顺.直径宜为20-30cm.节长宜为2m.",{"key":24,"text":475,"correct":22},"导管不得漏水.使用前应试拼、试压.试压的压力宜为孔低静水压力的1.5倍",{"key":28,"text":477,"correct":26},"导管线偏差不宜超过孔深的1%.且不大于10cm",{"key":31,"text":479,"correct":22},"导管采用法兰盘接头宜加锥形活套；采用螺旋丝扣接头时必须有防止松脱装置",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":31,"analysis":33},1256117,"小导管注浆时，适用于卵石地层的浆液是（ ）",[484,486,488,490],{"key":20,"text":485,"correct":22},"石灰砂浆",{"key":24,"text":487,"correct":22},"改性水玻璃浆",{"key":28,"text":489,"correct":22},"水泥一水玻璃双液浆",{"key":31,"text":491,"correct":26},"水泥浆或水泥砂浆",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":28,"analysis":33},1256118,"采用肥皂水对燃气管道接口进行检查的试验是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"水压试验",{"key":24,"text":499,"correct":22},"清管球清扫",{"key":28,"text":501,"correct":26},"气压试验",{"key":31,"text":503,"correct":22},"严密性试验",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":28,"analysis":33},1256119,"围堰使用期间河流的常水位为+2．Om，可能出现的最高水位（包括浪高）为+3.Om，则该围堰顶的最低标高应为（ ）m。",[508,510,512,514],{"key":20,"text":509,"correct":22},"2.5",{"key":24,"text":511,"correct":22},"3",{"key":28,"text":513,"correct":26},"3.5",{"key":31,"text":515,"correct":22},"4",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":20,"analysis":33},1256120,"下列不属于渗渠质量验收主控项目的选项是",[520,522,524,526],{"key":20,"text":521,"correct":26},"所用预制构件、配件、拋石料",{"key":24,"text":523,"correct":22},"预制管材、滤料及原材料的规格性能",{"key":28,"text":525,"correct":22},"集水管安装的进水孔方向正确.且无堵塞；管道坡度必须符合设计要求",{"key":31,"text":527,"correct":22},"抽水清洗、产水量的测定",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":28,"analysis":33},1256121,"泥混凝土面层振捣密实工序中，振动器的振动顺序正确的是（ ）",[532,534,536,538],{"key":20,"text":533,"correct":22},"插入式振捣器一振动梁一平板式振动器一无缝钢管滚杆提浆赶浆",{"key":24,"text":535,"correct":22},"振动梁一平板式振动器一插入式振捣器一无缝钢管滚杆提浆赶浆",{"key":28,"text":537,"correct":26},"插入式振捣器一平板式振动器一振动梁一无缝钢管滚杆提浆赶浆·",{"key":31,"text":539,"correct":22},"振动梁一插入式振捣器一平板式振动器一无缝钢管滚杆提浆赶浆",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":28,"analysis":33},1256122,"现场实测土路基干密度和含水量不用（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"灌水法",{"key":24,"text":547,"correct":22},"灌砂法",{"key":28,"text":549,"correct":26},"蜡封法",{"key":31,"text":551,"correct":22},"环刀法",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":31,"analysis":33},1256123,"根据《地下铁道工程施工及验收规范》的有关规定，隧道采用钻爆法施工时，必须事先编制爆破方案，在实施前还需履行的程序是（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":22},"报业主批准，并经城市主管部门同意",{"key":24,"text":559,"correct":22},"报监理批准，并经公安部门同意",{"key":28,"text":561,"correct":22},"报上级公司批准，并经城市主管部门同意",{"key":31,"text":563,"correct":26},"报城市主管部门批准，并经公安部门同意",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},1256124,"下列建设维修项目中，不属于城市燃气工程的是（ ）",[568,570,572,574],{"key":20,"text":569,"correct":26},"长输管线建设",{"key":24,"text":571,"correct":22},"汽车加气站建设",{"key":28,"text":573,"correct":22},"气源建设与维修",{"key":31,"text":575,"correct":22},"压缩天然气站维修",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":28,"analysis":33},1256125,"适用于一般土质或易坍塌的软弱围岩、断面较大的隧道施工的浅埋暗挖法是（ ）",[580,582,584,586],{"key":20,"text":581,"correct":22},"全断面法",{"key":24,"text":583,"correct":22},"台阶开挖法",{"key":28,"text":585,"correct":26},"环形开挖预留核心土法",{"key":31,"text":587,"correct":22},"中洞法",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":28,"analysis":33},1256126,"当地下燃气管道穿过排水管、热力管沟、联合地沟等各种用途沟槽时，燃气管道外部必须（ ）。",[592,594,596,598],{"key":20,"text":593,"correct":22},"提高防腐等级",{"key":24,"text":595,"correct":22},"加大管径",{"key":28,"text":597,"correct":26},"做套管",{"key":31,"text":599,"correct":22},"加厚管壁",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":24,"analysis":33},1256127,"钢桩在场地堆放时，堆放高度最多为（ ）层。",[604,606,607,608],{"key":20,"text":605,"correct":22},"2",{"key":24,"text":511,"correct":26},{"key":28,"text":515,"correct":22},{"key":31,"text":609,"correct":22},"5",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]