[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":94},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,17,50,812,[13,28,34,40,46,52,58,64,70,76,82,88],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1256780,3,"判断题","项目计划的跟踪、更新、调整和实施是一个不断进行的静态过程。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1256781,"目前项目经理部的项目信息管理系统，是静态地处理大量项目施工及相关信息。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1256782,"施工日志是市政工程整个施工阶段有关施工活动（包括施工组织管理和施工技术）和现场情况变化的综合性记录",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1256783,"施工日记的内容可分为五类：基本内容、工作内容、检验内容、检查内容、其他内容。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1256784,"信息收集的基本方法有：现场记录、会议记录、计量与支付记录、实验记录、工程照片和录像。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1256785,"建筑工程施工质量验收应划分为单位工程、分部工程、分项工程3类。",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1256786,"施工单位应严格按专项方案组织施工，如因设计、结构、外部环境等因素的确需要修改，修改后的专项方案需要存档备份。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1256787,"对于按规定需要验收的危险性较大的分部分项工程，经过监理工程师确认即可进人到下一步工序的施工。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1256788,"所有隐蔽分项工程应进行隐蔽验收，未经检验或验收不合格不得进行下道分项工程施工。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},1256789,"对于超过一定规模的危险性较大工程的专项方案进行修改时，施工单位应当重新组织专家进行论证。",[80,81],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1256790,"水泥混凝土道路在面层混凝土弯拉强度达到设计强度的80%前，不得开放交通。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1256791,"施工单位可以根据实际情况进行修改、调整专项方案进行组织施工。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[95,99,102,105,108,111],{"id":96,"name":97,"category":7,"favorite":98},1,"领导干部任职前廉政法规知识测试题",92,{"id":100,"name":101,"category":7,"favorite":96},595,"建筑结构与设备",{"id":103,"name":104,"category":7,"favorite":96},715,"招标采购专业知识与法律法规",{"id":106,"name":107,"category":7,"favorite":96},848,"市政方向-通用基础",{"id":109,"name":110,"category":7,"favorite":8},534,"BIM工程师",{"id":112,"name":110,"category":7,"favorite":8},535]