[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,16,50,812,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1256730,3,"判断题","施工现场通道附近的各类洞口与坑槽等处，应设置防护设施与安全标志，夜间应设红灯示警。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1256731,"施工现场未进行三级安全教育是人的不安全行为，而不是与管理缺陷有关的危险源。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1256732,"拆立杆时，先抱住立杆再拆开后两个扣，拆除大横杆、斜撑、剪刀撑时，应先拆中间扣，然后托住中间，再解端头扣。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1256733,"安全生产管理包含微观的安全管理和宏观的安全管理。",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1256734,"架空线必须采用绝缘铜线或绝缘铝线。",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1256735,"搭设临边防护栏杆时，防护栏杆的上杆离地高度为1.2~1.4m。下杆离地高度为0.5~0.6m。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1256736,"纵向扫地杆应采用直角扣件固定在距底座上皮不大于300mm处横杆上。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1256737,"各类作业平台、卸料平台应按相关规定编制施工方案，项目分管负责人审批签字后，方可作业。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1256738,"对大中型项目工程，结构复杂的重点工程除必须在施工组织总体设计中编制施工安全技术措施外，还应编制单位工程或分部分项工程安全技术措施。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},1256739,"“安全第一、预防为主”两者是相辅相成、互相促进的。“预防为主”是实现“安全第一”的基础。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1256740,"施工现场临时用电要做到三级配电、两级保护。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1256741,"照明变压器可以使用双绕组安全隔离变压器或自耦变压器。",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1256742,"人货两用电梯下部三面搭设双层防坠棚，搭设宽度正面不小于2.8m，两侧不小于8m搭设高度为3m。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1256743,"围挡不得用于挡土、承重。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1256744,"确因施工需要在围挡外堆放的材料，应有序堆放，且不得超过48小时。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1256745,"通过建立施工安全管理体系，可以改善企业的安全生产规章制度不健全、管理方法不适当、安全生产状况不佳的现状。",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},1256746,"在施工中发生危及人身安全的紧急情况时，经项目负责人同意后作业人员可以停止作业或者在采取必要的应急措施后撤离危险区域。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1256747,"施工安全技术保证由专项工程、专项技术、专项管理、专项治理4种类别构成",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1256748,"施工现场组织管理上的缺陷也是事故潜在的不安全因素。",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1256749,"专职安全生产管理人员对违章指挥、违章操作的，应当报告项目负责人予以制止。",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1256750,"建筑施工噪声是指在建筑施工过程中产生的干扰周围生活环境的声音。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":25,"analysis":27},1256751,"根据《市政工程工程量计算规范》（GB50857-2013），挖一般土方、挖基坑土方、挖沟槽土方等工作内容已经包含了余土的外运工作内容。",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1256752,"项目部应及时掌握工程变更情况，测算工程变更所带来的项目成本费用的增减，属于施工成本控制中的合同措施。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":25,"analysis":27},1256753,"工程量清单是招标文件的重要组成部分，各投标单位根据自身的管理水平、技术水平和施工经验填报工程数量和单价。",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1256754,"对市政工程进行工程量计算时，应结合选定的施工方法计算，不需考虑安全技术、质量保证等因素。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1256755,"施工项目成本管理的任务主要包括：成本预测、成本计划、成本控制和成本核算四个环节。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1256756,"根据《市政工程工程量计算规范》（GB50857-2013），现浇混凝土构件的工作内容包括模板制作、安装、拆除，混凝土的拌合、运输、浇筑，养护。",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1256757,"施工项目成本控制应贯穿于施工项目从施工准备阶段到项目竣工验收的全过程，它是企业全面成本管理的重要环节。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1256758,"工程量清单报价采用全国统一的12位数字编码。前六位编码不能变动，后六位编码由清单编制人根据项目设置的清单项目编制。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1256759,"严把质量关、安全关属于施工成本控制中的技术措施。",[200,201],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1256760,"工程量清单计价包括招标文件规定的完成工程量清单所列项目的全部费用。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1256761,"在施工项目成本的构成中，材料设备成本点项目成本的比例最大，一般情况下达到70％~80％，因此材料设备采购适合度和消耗管理是项目成本管理的重点。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1256762,"措施项目清单计价，可以计算工程量的措施项目，应按分部分项工程量清单的方式采用综合单价计价。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1256763,"在施工成本控制中，把施工成本的实际值与计划值的差异叫作成本偏差。",[224,225],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1256764,"施工成本控制可分为事先控制、过程控制和事后控制。",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},1256765,"根据《市政工程工程量计算规范》（GB50857-2013），管道铺设中，钢管的工程量计算是按设计图示中心线长度以延长米计算，并扣除附属构筑物、管件及阀门等所占长度。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1256766,"成本考核分为过程考核和项目完成后考核。",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1256767,"工程量必须以承包人完成合同范围内应予以计量的工程量确定。",[248,249],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":25,"analysis":27},1256768,"建立项目成本管理责任制属于施工成本控制中的经济措施。",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1256769,"施工项目成本控制的第一步是进行成本预测。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1256770,"预制混凝土梁根据工程量清单计算规则，应按设计图示尺寸以长度计算。",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1256771,"采用工程量清单计价方式，投标单位对自身发生的成本和单价负责，同时也对工程量的变更来承担风险。",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1256772,"施工资料的工程文件应为复印件。",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1256773,"施工信息不仅量大而且分类复杂，需利用计算机进行项目管理，才可以做到有效的信息检索。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1256774,"目前既有的项目信息管理系统只能连接项目经理部内部各职能部门之间以及项目经理部与各职能部门，与发包人和分包人、与监理机构不能进行连接。",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1256775,"施工信息在传递的过程中，通常形成各种信息流为自下而上的信息流。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1256776,"如果要利用项目管理软件对资源进行管理，还需要建立资源库，并输人完成工作所需的资源信息。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1256777,"信息处理主要包括信息的加工、传输、存储、检索和输出等工作，不包括收集工作。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1256778,"施工技术资料可分为施工管理、施工技术、物资设备管理、工程测量、工程试验、施工记录、质量验收资料等。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":25,"analysis":27},1256779,"工程文件应采用耐久性强的书写材料，如红色墨水、纯蓝色墨水、圆珠笔。",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]