[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,15,50,812,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1256680,3,"判断题","全站仪的测距精度受到气温、气压、大气折光等因素的影响。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1256681,"建设工程项目质量的影响因素，主要是指在项目质量目标策划、决策和实现过程中影响质量形成的各种人的因素。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1256682,"施工组织设计技术交底注意事项，包括地基处理、基础工程、主体项目施工，附属工程等的注意事项及工期、质量、安全等要求。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1256683,"道路平面图中，道路中心线用粗实线表示。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1256684,"钢筋应按不同的钢种、等级、牌号、规格及生产厂家分批验收，确认合格后方可使用。",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1256685,"全站仪能同时测定目标点的平面位置（X，Y）与高程（H）。",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1256686,"面层技术交底应由专业施工员编写，并进行交底。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1256687,"竖直角与天顶距是同一个概念。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1256688,"动力机制是建设工程项目质量控制系统运行的核心机制。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},1256689,"沥青路面工程施工方案可采用会议形式或现场讲授形式进行交底，并形成书面记录。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1256690,"编制道路基层技术交底时，需要说明与本道工序相关的下道工序应具备的条件，是否已经过验收并合格。",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1256691,"经纬仪没有必要的辅助工具支持下不能直接用来测量视距。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1256692,"编制技术交底文件时，需对下道工序成品的保护提出要求；对本道工序成品提出具体保护要求。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1256693,"绘制路线纵断面图时，当路线坡度发生变化时，变坡点应用直径为2mm的中粗线圆圈表示；切线应采用细实线表示；竖曲线应采用粗实线表示。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1256694,"在路桥工程图中，钢筋直径的尺寸单位采用mm，其余尺寸单位均采用cm，图中无需标注出单位。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":25,"analysis":27},1256695,"管道强度、严密性试验与冲洗消毒安全技术交底要求，管道结构达到设计强度，外观验收合格后，沟槽土回填完成的条件下应及时进行闭水试验。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},1256696,"建设工程的质量政府监督仅体现在质量验收环节",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1256697,"钢筋采用绑扎接头时，受拉区域，HPB235钢筋绑扎接头的末端可不做弯钩，HRB335.HRB400钢筋应做成弯钩。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1256698,"质量的主体是产品、体系、项目或过程，质量的客体是顾客和其他相关方。",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1256699,"自高处向模板内倾斜混凝土时，其自由倾落高度不得超过3m，当倾落高度超过3m时，应通过串筒、溜槽或振动溜槽等设施下落。",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1256700,"沥青混合料路面混合料摊铺与碾压施工安全技术交底应要求，两台以上压路机作业时，前后间距不得小于1m，左右间距不得小于3m。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1256701,"桩基础的作用是将承台以上结构物传来的外力通过承台，由桩传到较深的地基持力层中去。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1256702,"绘制路基横断面图时，桩号应标注在图样下方，填高（HT）、挖深（HW）、填方面积（AT）和挖方面积（AW）应标注在图样右下方，并用中粗点划线示出征地界线。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1256703,"光电测距仪具有精度高、作业效率高、受地形影响小的优占",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1256704,"DSI水准仪的观测精度要高于DS3水准仪。",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1256705,"某道路平面图中，注写有“2K+590”，则该注写表示此点距离道路起占2590mm。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1256706,"涵洞工程图主要由纵剖面图、平面图、侧面图，除上述三种投影图外，还应画出必要的构造详图，如钢筋布置图、翼墙断面图等。",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1256707,"碗口支架中立杆上的上碗扣应能上下窜动和灵活转动，不得有卡滞现象。",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1256708,"编制管道基础技术交底文件时，对管道基础工程具体施工时间、完成时间等需提出详细要求。",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1256709,"水准仪的使用中，消除视差的方法是仔细转动目镜对光螺旋，直至尺像与十字丝网面重合。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":25,"analysis":27},1256710,"经纬仪整平的目的是使水平度盘中心和测站点标志中心在同一铅垂线上。",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1256711,"路基工程填土施工，清除淤泥前应探明淤泥性质和深度，并采取相应的安全技术措施。",[212,213],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1256712,"在工程开工前，总监理工程师应组织专业监理工程师审查承包单位报送的施工组织设计报审表，提出意见，并经专业监理工程师审核后报建设单位。",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1256713,"主城、新市区范围内的工程施工现场一次性使用砂浆4立方米以上的，应当使用预拌砂浆。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1256714,"安全责任制不健全是施工现场与管理缺陷有关的危险源。",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1256715,"模板拆除应按规定程序进行，先支的后拆，先拆非承重部分，后拆承重部分。",[236,237],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1256716,"拆除建筑物，一般自上而下顺序进行，也可数层同时拆除。",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1256717,"在高处外墙安装门、窗，无外脚手时.应张挂安全网。无安全网时，操作人员不必系安全带。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1256718,"疏散通道、楼梯及坡道内，不应设置突出物，不得堆放施工材料和机具。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1256719,"施工现场专用变压器的供电的TN-S接零保护系统中，电气设备的金属外壳必须与保护零线连接。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1256720,"距地面2m以上作业区要有防护栏杆、挡板或安全网。安全帽、安全带、安全网要定期检查，不符合要求的，严禁使用。",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1256721,"灌注桩成孔后，当暂不浇注混凝土时，孔口暂不处理。",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1256722,"总配电箱中漏电保护器的额定漏电动作电流不应大于30mA。",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1256723,"安全电压额定值的等级为42v、36V、24v、12V、6V。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1256724,"在房屋高差较大或荷载差异较大的情况下，当未留设沉降缝时，容易在交接部位产生较大的不均匀沉降裂缝。",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":21,"analysis":27},1256725,"塔吊供电系统无法实行三相五线制时，其专用电源初端应增设重复接地装置，接地电阻不可超过10?。",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1256726,"从宏观讲，事故发生的原因中，主要的原因是人的不安全行为和物的不安全状态。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1256727,"施工安全技术措施仅按施工阶段编写。",[308,309],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1256728,"环境保护以“废”治理为主，坚持“预防为主，管治结合，以管促治，谁污染谁治理，谁开发谁保护”的原则。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1256729,"架空线必须架设在专用电杆上或脚手架上.严禁架设在树木上。",[320,321],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]