[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,14,50,812,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1256630,3,"判断题","在编制施工进度计划的初始方案时，尽可能组织顺序作业，力求资源需要量最",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1256631,"在双代号网络图中，当计划工期与计算工期相等时，自由时差为零的工作为关键工作。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1256632,"通常情况下，施工顺序受施工工艺和施工组织两方面的制约。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1256633,"网络计划中任何工作实际进度比计划进度落后都将影响总工期，需采取措施进行调整。",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1256634,"在编制市政工程中单位工程施工进度计划时，应先确定工作顺序，再确定施工方案。",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1256635,"工作项目之间的工艺关系是由于劳动力、施工机械、材料和构配件等资源的组织和安排需要形成的。",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1256636,"劳动量和机械台班数据应当根据各个部分分项工程的工程量、施工方法和现场的概算定额，并结合当地不发地的具体情况加以确定。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1256637,"月度施工计划和旬作业计划是用于直接组织施工作业的计划，它是控制性施工进度计划。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1256638,"当施工项目的进度计划用时标网络计划表达时，可采用s形曲线比较法进行实际进度与计划进度的比较。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1256639,"施工阶段是工程实体的形成阶段，对施工准备阶段进度进行控制是整个工程项目建设进度控制的重占",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1256640,"主要材料需要量计划，是备料和确定仓库、堆场面积的依据，但对组织材料运输没有太大作用。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1256641,"非节奏流水施工专业队不能连续施工。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1256642,"承包单位的进度控制报告应提交给业主，作为其控制进度、核发进度款的依据。",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":25,"analysis":27},1256643,"在采用流水作业时，流水节拍的大小，与投人的劳动力、机械的数量无直接关系。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1256644,"在编制某市政道路工程施工进度计划时，拟采用流水作业法，划分施工段时应注意各施工段；各施工段上所消耗的材料用量尽可能相近。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1256645,"在施工段不变的条件下，流水步距越大，工期越长，流水步距越小，工期越短。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},1256646,"流水施工的最大优点是工期短，充分利用工作面。",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1256647,"施工进度计划一般用图表表示，通常常用的图表有横断图和网络图。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1256648,"某城市道路改建工程，项目经理部在开工初期编制了施工总进度计划和年度计划图，用以指导现场施工，这种做法是正确的。",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1256649,"对于大型工程项目，在编制控制性施工进度计划时，工作项目的划分应细些。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1256650,"在安排某桥梁工程施工顺序时，按照工艺关系必须要先完成下部结构施工，才能安排上部梁的预制和安装工作。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":25,"analysis":27},1256651,"当施工方案确定之后，工作项目之间的组织工关系也即随之确定。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},1256652,"网络计划中，若工作的总时差不为零，其自由时差也不为零。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":25,"analysis":27},1256653,"横道图进度计划法是传统的进度计划方法，它具有逻辑严密、层次清晰、主要矛盾突出等优点，有利于计划的优化、控制和调整。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1256654,"控制性施工进度计划是实施性进度计划的依据。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1256655,"施工进度计划可按项目的结构分解为基础工程和主体工程的进度计划。",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1256656,"施工过程是施工进度计划的基本组成单元，施工过程内容的多少，划分的粗细程度，应根据计划的需要来决定。",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1256657,"在编制施工进度计划时，有时需要划分施工段，其目的是为了适应顺序作业施工的需要。",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1256658,"在双代号时标网络计划中，用虚箭线表小虚工作，用波形线表示总时差。",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1256659,"进行计划检查方法中的前锋线比较法主要适用于时标网络计划中。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":25,"analysis":27},1256660,"在进度计划的调整过程中通过改变某些工作的逻辑关系可以达到缩短工作的持续时间的作用。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1256661,"对于大型工程项目，在编制控制性施工进度计划时，工作项目应尽可能划分的细一些，可划分到分项工作。",[212,213],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1256662,"施工组织的基本方式有三种：等节拍、不等节拍、无节奏流水施工。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1256663,"沉桩施工场地应平整坚实，坡度不大于10％，沉桩机应安装稳固，并设缆绳，保持机身稳定。",[224,225],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1256664,"钢筋结构图不一定三个投影图都画出来，而是根据需要来决定钢筋图，一般不画平面图，只用立面图和断面图来表示。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},1256665,"桥梁平面图中，通常使用细实线图示道路边线。",[236,237],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1256666,"技术交底是为使参加施工的人员对工程及其技术要求做到心中有数，在完工前向操作者进行的交底工作，是项目管理的重要制度。",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1256667,"施工图交底和图纸会审，应由施工单位组织，由建设单位向施工单位交底。",[248,249],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":25,"analysis":27},1256668,"事前控制的目标是确保工序质量合格，关键是坚持质量标准，重点是工序质量、工作质量和质量控制点的控制。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1256669,"技术交底以书面、口头、会议等形式交底到项目施工人员。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1256670,"管线竣工图一般分为管线竣工平面图和管线竣工断面图。每一单项管线竣工完成，不一定都需要编制单项管线竣工平面图。",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1256671,"编制技术交底时，对重点部位和关键环节，需结合施工图提出设计的特殊要求和山理方法，细部处理要求，容易发生质量事故和安全环保施工的工艺过程，尽量用图表示。",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1256672,"工程质量事故发生后，事故现场有关人员应当立即向施工项目监理人员报告。",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1256673,"双面水准尺多用于三、四等水准测量，其长度有2m和3m两种，且两根为一对。",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1256674,"市政管道工程施工图中，剖面图为双线。",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":21,"analysis":27},1256675,"市政管道工程施工图中，平面图为单线。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},1256676,"机械成孔桩孔灌注桩基础技术交底文件要求，护筒顶端高程应高于地下水位或施工期间的最高河湖水位1.5m，旱地钻孔护筒顶端高程应高出地面50cm。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1256677,"全站仪所观测的数据必须当场记录，否则不能保存。",[308,309],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},1256678,"经纬仪对中的目的是使水平度盘处于水平位置和仪器竖轴处于铅垂位置。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1256679,"影响施工质量的生产要素中，环境因素只能通过采取预测预防的控制方法以消除其对施工质量不利影响。",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]