[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":640},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,13,50,812,[13,38,53,68,83,97,112,124,138,152,166,181,196,211,225,239,254,268,282,297,312,326,340,354,368,382,397,410,421,435,449,463,478,492,506,520,534,549,564,574,580,586,592,598,604,610,616,622,628,634],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1256580,2,"多选题","不定期检查是指在工程或设备开工和停工前（ ）进行的安全检查。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","检修中",true,{"key":24,"text":25,"correct":26},"B","专业性检查",false,{"key":28,"text":29,"correct":26},"C","季节性检查",{"key":31,"text":32,"correct":22},"D","工程或设备竣工",{"key":34,"text":35,"correct":22},"E","设备试运转时","ADE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1256581,"“四口”防护是指（ ）通道口等各种洞口的防护应符合要求。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"楼梯口",{"key":24,"text":45,"correct":26},"饮水井口",{"key":28,"text":47,"correct":22},"电梯井口",{"key":31,"text":49,"correct":26},"大门出人口",{"key":34,"text":51,"correct":22},"预留洞口","ACE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1256582,"施工安全保证体系的构成包含（ ）和施工安全信息保证体系。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"施工安全的组织保证体系",{"key":24,"text":60,"correct":22},"施工安全的制度保证体系",{"key":28,"text":62,"correct":22},"施工安全的技术保证体系",{"key":31,"text":64,"correct":26},"施工安全投人保证体系",{"key":34,"text":66,"correct":22},"施工安全处罚制度","ABCE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1256583,"施工现场组织管理上的缺陷构成的危险源主要包括（ ）等。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"施工队伍资格不符合要求",{"key":24,"text":75,"correct":22},"违规分包或转包",{"key":28,"text":77,"correct":22},"建设费用不足",{"key":31,"text":79,"correct":22},"现场管理不到位",{"key":34,"text":81,"correct":26},"深基坑支护作业","ABCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":82,"analysis":37},1256584,"我国关于环境保护相关的法律法规有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"中华人民共和国环境保护法",{"key":24,"text":90,"correct":22},"中华人民共和国固体废物污染环境防治法",{"key":28,"text":92,"correct":22},"中华人民共和国水污染防治法",{"key":31,"text":94,"correct":22},"中华人民共和国环境噪声污染防治法",{"key":34,"text":96,"correct":26},"建设工程安全管理条例",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1256585,"某工地正在进行下水道工程的窨井砌砖作业，当时有6名砖瓦工在深达5m的无槽壁支撑的沟槽中施工，1名砖瓦工在地面休息。突然，地面休息的工人发现沟槽有不明水冒出，同时沟槽坍塌，沟槽边堆高达1.8m的土方下滑，急忙向沟底工人发出塌方危险信号，沟底6名工人向不同方向逃逸，其中5人幸免于难，1人被埋在土中，露出胳膊。5人见状忙用手挖土将人救出，同时报告现场负责人。该负责人立即调来运土翻斗车送伤者去医院抢救，因不知道最近的医院地址，用了近40皿n时间才送达。经医院检查，伤者因窒息时间过长已经死亡。施工负责人忙于接待死者家属，等到第3天才想起通知上级主管部门，等事故调查组接到拖延的事故报告到达现场时窨井已砌好，事故现场已面目全非。 人的不安全行为有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"工人们冒险进人深达5m且没有支撑的沟槽作业",{"key":24,"text":104,"correct":22},"沟槽临近施工宿舍内的生活污水倾倒在沟槽附近，渗人地下造成槽壁冒水",{"key":28,"text":106,"correct":26},"戴安全帽",{"key":31,"text":108,"correct":26},"系安全带",{"key":34,"text":110,"correct":26},"穿防滑鞋","AB",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":67,"analysis":37},1256586,"安全检查可分为（ ）和不定期检查。",[116,118,119,120,122],{"key":20,"text":117,"correct":22},"日常性检查",{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":22},{"key":31,"text":121,"correct":26},"上班检查",{"key":34,"text":123,"correct":22},"节假日前后的检查",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":82,"analysis":37},1256587,"班组安全生产教育由班组长主持，进行本工种岗位安全操作及班组安全制度、安全纪律教育的主要内容有（ ）。",[128,130,132,134,136],{"key":20,"text":129,"correct":22},"本班组作业特点及安全操作规程",{"key":24,"text":131,"correct":22},"本岗位易发生事故的不安全因素及其防范对策",{"key":28,"text":133,"correct":22},"本岗位的作业环境及使用的机械设备、工具安全要求",{"key":31,"text":135,"correct":22},"爱护和正确使用安全防护装置（设施）及个人劳动防护用品",{"key":34,"text":137,"correct":26},"高处作业、机械设备、电气安全基础知识",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":67,"analysis":37},1256588,"根据《市政工程工程量计算规范》（GB508572013），强夯法加固地基列清单工程量时需要根据（ ）项目特征分别列项。",[142,144,146,148,150],{"key":20,"text":143,"correct":22},"夯击能量",{"key":24,"text":145,"correct":22},"夯击遍数",{"key":28,"text":147,"correct":22},"地耐力要求",{"key":31,"text":149,"correct":26},"夯击影响深度",{"key":34,"text":151,"correct":22},"夯填材料种类",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":82,"analysis":37},1256589,"A公司中标的某城市场高架跨线桥工程，为15跨25m预应力简支梁桥，桥面宽22m，采用?1200mm的钻孔灌注桩基础，埋置式承台，Y型独立式立柱。工程中标价2850万元。经过成本预测分析，项目目标成本为2600万，其中间接成本占10％。在工程进行过程中发生了如下事件：事件1.工程开工2个月后，因资金不足，贷款500万元，共支付利息30万元。事件2.某承台开挖时发现文物，按上级有关部门要求停工30d，导致总工期拖延10d，未发生直接成本损失。 项目部编制目标成本计划的依据有（ ）。",[156,158,160,162,164],{"key":20,"text":157,"correct":22},"合同文件",{"key":24,"text":159,"correct":22},"施工组织设计",{"key":28,"text":161,"correct":22},"设计图纸",{"key":31,"text":163,"correct":22},"投标报价清单",{"key":34,"text":165,"correct":26},"预算定额",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":180,"analysis":37},1256590,"施工项目成本控制中，成本偏差分析的方法主要有（ ）。",[170,172,174,176,178],{"key":20,"text":171,"correct":22},"横道图法",{"key":24,"text":173,"correct":26},"差额计算法",{"key":28,"text":175,"correct":22},"表格法",{"key":31,"text":177,"correct":22},"曲线法",{"key":34,"text":179,"correct":26},"比率法","ACD",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":195,"analysis":37},1256591,"下列选项中，属于施工成本控制的步骤的是（ ）。",[185,187,189,191,193],{"key":20,"text":186,"correct":26},"计划",{"key":24,"text":188,"correct":22},"预测",{"key":28,"text":190,"correct":22},"分析",{"key":31,"text":192,"correct":22},"比较",{"key":34,"text":194,"correct":22},"纠编","BCDE",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":210,"analysis":37},1256592,"根据《市政工程工程量计算规范》（GB50857-2013），道路面层中沥青混凝土项目的工作内容应该包括的是（ ）。",[200,202,204,206,208],{"key":20,"text":201,"correct":22},"清理下承面",{"key":24,"text":203,"correct":22},"拌合、运输",{"key":28,"text":205,"correct":26},"铺垫层",{"key":31,"text":207,"correct":22},"摊铺、整形",{"key":34,"text":209,"correct":22},"压实","ABDE",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":180,"analysis":37},1256593,"对施工项目进行成本控制，应该做到既增收又节支。下列选项中属于施工成本控制的基本内容的有（ ）。",[215,217,219,221,223],{"key":20,"text":216,"correct":22},"认真会审图纸",{"key":24,"text":218,"correct":26},"加强合同决算管理",{"key":28,"text":220,"correct":22},"制订先进的、经济合理的施工方案",{"key":31,"text":222,"correct":22},"落实技术组织措施",{"key":34,"text":224,"correct":26},"组织平行施工，加快施工进度",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":82,"analysis":37},1256594,"下列选项中，属于市政工程工程量计算的依据的是（ ）。",[229,231,233,235,237],{"key":20,"text":230,"correct":22},"招标文件",{"key":24,"text":232,"correct":22},"施工合同",{"key":28,"text":234,"correct":22},"设计文件",{"key":31,"text":236,"correct":22},"市政工程计量规范",{"key":34,"text":238,"correct":26},"施工定额",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":253,"analysis":37},1256595,"施工项目成本是指工程项目的施工过程中所发生的全部生产费用的总和，主要由（ ）构成。",[243,245,247,249,251],{"key":20,"text":244,"correct":22},"直接成本",{"key":24,"text":246,"correct":22},"间接成本",{"key":28,"text":248,"correct":26},"计划成本",{"key":31,"text":250,"correct":26},"管理成本",{"key":34,"text":252,"correct":22},"税金","ABE",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":253,"analysis":37},1256596,"按项目施工的进展进行成本分析的内容包括（ ）。",[258,260,262,264,266],{"key":20,"text":259,"correct":22},"年度成本分析",{"key":24,"text":261,"correct":22},"月（季）度成本分析",{"key":28,"text":263,"correct":26},"成本盈亏异常分析",{"key":31,"text":265,"correct":26},"机械使用费分析",{"key":34,"text":267,"correct":22},"分部分项工程成本分析",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":52,"analysis":37},1256597,"对综合单价法的有关内容，说法正确的有（ ）。",[272,274,276,278,280],{"key":20,"text":273,"correct":22},"综合单价分为全费用综合单价和部分费用综合单价",{"key":24,"text":275,"correct":26},"部分费用综合单价的内容不包括间接费",{"key":28,"text":277,"correct":22},"分部分项工程的人工、材料、机械含量的比例不同，计算综合单价的基数不同",{"key":31,"text":279,"correct":26},"全费用综合单价内容包括直接工程费、措施费、利润和税金。",{"key":34,"text":281,"correct":22},"综合单价如果是全费用综合单价，则综合单价乘以各分项工程量汇总后，就生成工程承发包价格。",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":296,"analysis":37},1256598,"根据《市政工程工程量计算规范》（GB50857-2013），对基坑和沟槽的判断，下列正确的是（ ）。",[286,288,290,292,294],{"key":20,"text":287,"correct":22},"底宽≤7m且底长>3倍底宽为沟槽",{"key":24,"text":289,"correct":26},"底宽≤7m的为沟槽",{"key":28,"text":291,"correct":26},"底宽\u003C7m且底长≥3倍底宽为沟槽",{"key":31,"text":293,"correct":22},"底长≤3倍底宽，且底面积≤150的为基坑",{"key":34,"text":295,"correct":26},"底长\u003C3倍底宽，且底面积\u003C150㎡的为基坑","AD",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":311,"analysis":37},1256599,"施工项目成本分析，就是根据（ ）提供的资料，对施工成本的形成过程和影响成本的因素进行分析，以寻求进一步降低成本的途径。",[301,303,305,307,309],{"key":20,"text":302,"correct":26},"事中控制",{"key":24,"text":304,"correct":26},"事后控制",{"key":28,"text":306,"correct":22},"业务核算",{"key":31,"text":308,"correct":22},"会计核算",{"key":34,"text":310,"correct":22},"统计核算","CDE",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":111,"analysis":37},1256600,"建设工程资料包括：（ ）。",[316,318,320,322,324],{"key":20,"text":317,"correct":22},"工程技术资料",{"key":24,"text":319,"correct":22},"工程管理资料",{"key":28,"text":321,"correct":26},"工程财务资料",{"key":31,"text":323,"correct":26},"工程组织资料",{"key":34,"text":325,"correct":26},"工程安全资料",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":253,"analysis":37},1256601,"系统的特点有（ ）等。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"目的性",{"key":24,"text":333,"correct":22},"环境适应性",{"key":28,"text":335,"correct":26},"真实性",{"key":31,"text":337,"correct":26},"稳定性",{"key":34,"text":339,"correct":22},"整体性",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":82,"analysis":37},1256602,"施工资料应不少于4套，分别由（ ）保存。",[344,346,348,350,352],{"key":20,"text":345,"correct":22},"施工企业",{"key":24,"text":347,"correct":22},"建设单位",{"key":28,"text":349,"correct":22},"监理单位",{"key":31,"text":351,"correct":22},"市建设工程质量监督站",{"key":34,"text":353,"correct":26},"省建设厅",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":67,"analysis":37},1256603,"信息分类编码的原则为（ ）等。",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"惟一性",{"key":24,"text":361,"correct":22},"合理性",{"key":28,"text":363,"correct":22},"可扩充性",{"key":31,"text":365,"correct":26},"有效性",{"key":34,"text":367,"correct":22},"规范性",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":311,"analysis":37},1256604,"“施工日志”是为了对施工过程中有关技术管理和质量管理活动作出连续完整的原始记录。对施工日志的要求有：（ ）。",[372,374,376,378,380],{"key":20,"text":373,"correct":26},"新颖",{"key":24,"text":375,"correct":26},"生动",{"key":28,"text":377,"correct":22},"及时、准确、完整",{"key":31,"text":379,"correct":22},"连续性",{"key":34,"text":381,"correct":22},"可追溯性",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":396,"analysis":37},1256605,"建设工程信息管理的基本环节包括（ ）。",[386,388,390,392,394],{"key":20,"text":387,"correct":22},"信息的收集、传递",{"key":24,"text":389,"correct":22},"信息的加工、整理",{"key":28,"text":391,"correct":22},"信息的检索，存储",{"key":31,"text":393,"correct":26},"数据和信息的收集、传递",{"key":34,"text":395,"correct":26},"数据和信息的加工、整理","ABC",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":311,"analysis":37},1256606,"建设工程项目信息工作原则有（ ）等。",[401,403,404,406,408],{"key":20,"text":402,"correct":26},"适用性",{"key":24,"text":363,"correct":26},{"key":28,"text":405,"correct":22},"标准化",{"key":31,"text":407,"correct":22},"时效性",{"key":34,"text":409,"correct":22},"定量化",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":210,"analysis":37},1256607,"信息的特点有（ ）等。",[414,415,417,418,420],{"key":20,"text":335,"correct":22},{"key":24,"text":416,"correct":22},"系统性",{"key":28,"text":365,"correct":26},{"key":31,"text":419,"correct":22},"不完全性",{"key":34,"text":407,"correct":22},{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":67,"analysis":37},1256608,"下列属于桥梁模板支架施工方案应说明内容的有（ ）。",[425,427,429,431,433],{"key":20,"text":426,"correct":22},"阐述模板支撑体系的主要搭接方法及检查验收",{"key":24,"text":428,"correct":22},"明确立杆纵、横方向间距",{"key":28,"text":430,"correct":22},"提高架体整体稳定性措施",{"key":31,"text":432,"correct":26},"模板采购合同",{"key":34,"text":434,"correct":22},"剪刀撑的位置和数量",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":82,"analysis":37},1256609,"任何单位和个人都不得擅自改变城市绿化规划用地性质或者破坏绿化规划用地的（ ）。",[439,441,443,445,447],{"key":20,"text":440,"correct":22},"地形",{"key":24,"text":442,"correct":22},"地貌",{"key":28,"text":444,"correct":22},"水体",{"key":31,"text":446,"correct":22},"植被",{"key":34,"text":448,"correct":26},"绿化率",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":311,"analysis":37},1256610,"某城市给水工程项目，该工程项目属大中型工程项目施工组织设计，设计单位组织有关单位对施工图设计会审位对施工单位进行了施工技术交底。在施工过程中，监理单位及时编制了施工技术文件，按规范（GB\u002FT50328-2014）的要求进行归档。 4.下列需要制作安全专项方案并需专家论证的有（ ）。",[453,455,457,459,461],{"key":20,"text":454,"correct":26},"开挖深度为4m的基坑的土方开挖、支护、降水工程",{"key":24,"text":456,"correct":26},"搭设高度为6m的混凝土支撑模板",{"key":28,"text":458,"correct":22},"搭设高度50m及以上落地钢管脚手架工程",{"key":31,"text":460,"correct":22},"采用爆破拆除的工程",{"key":34,"text":462,"correct":22},"施工高度为60m的建筑幕墙安装工程",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":477,"analysis":37},1256611,"因特殊情况需要临时占用城市道路的，须经（ ）批准，方可按照规定占用。",[467,469,471,473,475],{"key":20,"text":468,"correct":22},"市政工程行政主管部门",{"key":24,"text":470,"correct":26},"绿化行政主管部门",{"key":28,"text":472,"correct":22},"公安交通管理部门",{"key":31,"text":474,"correct":26},"建设厅",{"key":34,"text":476,"correct":26},"规划局","AC",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":210,"analysis":37},1256612,"下列说法正确的有（ ）。",[482,484,486,488,490],{"key":20,"text":483,"correct":22},"因工程建设需要挖掘城市道路的，应当持城市规划部门批准签发的文件和有关设计文件，到市政工程行政主管部门和公安交通管理部门办理审批手续，方可按照规定挖掘。",{"key":24,"text":485,"correct":22},"新建的城市道路交付使用后5年内不得挖掘",{"key":28,"text":487,"correct":26},"大修的城市道路竣工后5年内不得挖掘",{"key":31,"text":489,"correct":22},"经批准挖掘城市道路的，应当在施工现场设置明显标志",{"key":34,"text":491,"correct":22},"经批准临时占用城市道路的，不得损坏城市道路",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":253,"analysis":37},1256613,"属于桥梁模板支架支撑系统应验算的内容包括（ ）。",[496,498,500,502,504],{"key":20,"text":497,"correct":22},"需验算支撑节点详图，并计数该类型的不知情况和安装方法",{"key":24,"text":499,"correct":22},"梁底模板验算",{"key":28,"text":501,"correct":26},"梁顶模板验算",{"key":31,"text":503,"correct":26},"支架立杆稳定性验算",{"key":34,"text":505,"correct":22},"支架横杆稳定性验算",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":396,"analysis":37},1256614,"深基坑专项施工方案编制的内容有（ ）。",[510,512,514,516,518],{"key":20,"text":511,"correct":22},"工程概况",{"key":24,"text":513,"correct":22},"施工计划",{"key":28,"text":515,"correct":22},"计算书及相关图纸",{"key":31,"text":517,"correct":26},"交通疏散方案",{"key":34,"text":519,"correct":26},"项目管理措施",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":82,"analysis":37},1256615,"应出席专家论证会的人员有（ ）。",[524,526,528,530,532],{"key":20,"text":525,"correct":22},"专家组成员",{"key":24,"text":527,"correct":22},"建设单位项目负责人或技术负责人",{"key":28,"text":529,"correct":22},"监理单位项目总监理工程师及相关人员",{"key":31,"text":531,"correct":22},"施工单位分管安全的负责人",{"key":34,"text":533,"correct":26},"材料供应商",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":548,"analysis":37},1256616,"专项方案进行技术交底时应采用（ ）形式，并形成书面记录。",[538,540,542,544,546],{"key":20,"text":539,"correct":26},"会议",{"key":24,"text":541,"correct":22},"书面形式",{"key":28,"text":543,"correct":22},"现场讲授",{"key":31,"text":545,"correct":26},"口述转达",{"key":34,"text":547,"correct":26},"邮件转发","BC",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":563,"analysis":37},1256617,"下列市政工程中需要进行专家论证的有（ ）。",[553,555,557,559,561],{"key":20,"text":554,"correct":26},"开挖深度超过10m的人工挖孔桩工程",{"key":24,"text":556,"correct":22},"顶管程",{"key":28,"text":558,"correct":22},"水下作业工程",{"key":31,"text":560,"correct":22},"滑模模板工程",{"key":34,"text":562,"correct":26},"搭设高度30m及以上落地式钢管脚手架工程","BCD",{"id":565,"libraryId":5,"type":566,"typeLabel":567,"stem":568,"options":569,"answer":573,"analysis":37},1256618,3,"判断题","在编制施工进度计划时，必须考虑各分部分项工程的合理顺序，尽可能组织平行作业，以力求加快工程进度。",[570,572],{"key":20,"text":571,"correct":26},"正确",{"key":24,"text":573,"correct":22},"错误",{"id":575,"libraryId":5,"type":566,"typeLabel":567,"stem":576,"options":577,"answer":573,"analysis":37},1256619,"横道图表的水平方向表示工程施工的平面地理位置或施工区段划分，纵坐标表示进度时间。",[578,579],{"key":20,"text":571,"correct":26},{"key":24,"text":573,"correct":22},{"id":581,"libraryId":5,"type":566,"typeLabel":567,"stem":582,"options":583,"answer":571,"analysis":37},1256620,"计算工程所需的劳动量和机械台班数量时，应首先确定所采用定额。",[584,585],{"key":20,"text":571,"correct":22},{"key":24,"text":573,"correct":26},{"id":587,"libraryId":5,"type":566,"typeLabel":567,"stem":588,"options":589,"answer":573,"analysis":37},1256621,"编制市政工程单位工程施工进度计划时，需要依据施工承包合同、施工组织设计、承包人的管理水平和设备状况，但与工程所有地的施工条件无关。",[590,591],{"key":20,"text":571,"correct":26},{"key":24,"text":573,"correct":22},{"id":593,"libraryId":5,"type":566,"typeLabel":567,"stem":594,"options":595,"answer":573,"analysis":37},1256622,"施工总进度计划宜优先采用横道图计划。",[596,597],{"key":20,"text":571,"correct":26},{"key":24,"text":573,"correct":22},{"id":599,"libraryId":5,"type":566,"typeLabel":567,"stem":600,"options":601,"answer":571,"analysis":37},1256623,"在施工施工顺序时，如果违背工艺关系，可能会造成工程质量事故或安全事故的出现。",[602,603],{"key":20,"text":571,"correct":22},{"key":24,"text":573,"correct":26},{"id":605,"libraryId":5,"type":566,"typeLabel":567,"stem":606,"options":607,"answer":573,"analysis":37},1256624,"某城市道路工程，分包出部分分部工程。在制订施工进度计划时，只需要总承包人制订施工进度计划，分包商人不需要再专门制订分包工程的施工进度计划。",[608,609],{"key":20,"text":571,"correct":26},{"key":24,"text":573,"correct":22},{"id":611,"libraryId":5,"type":566,"typeLabel":567,"stem":612,"options":613,"answer":573,"analysis":37},1256625,"施工进度控制是一个系统、静态的过程。因此，在施工前应认真编制，在施工中只需要进行有效控制即可。",[614,615],{"key":20,"text":571,"correct":26},{"key":24,"text":573,"correct":22},{"id":617,"libraryId":5,"type":566,"typeLabel":567,"stem":618,"options":619,"answer":571,"analysis":37},1256626,"一个项目的施工总进度规划或施工总进度计划是工程项目的控制性施工进度计划。",[620,621],{"key":20,"text":571,"correct":22},{"key":24,"text":573,"correct":26},{"id":623,"libraryId":5,"type":566,"typeLabel":567,"stem":624,"options":625,"answer":571,"analysis":37},1256627,"在对施工过程进行划分时，应结合所选择的施工方案来定。",[626,627],{"key":20,"text":571,"correct":22},{"key":24,"text":573,"correct":26},{"id":629,"libraryId":5,"type":566,"typeLabel":567,"stem":630,"options":631,"answer":571,"analysis":37},1256628,"将每一施工过程每天所需的机械类型、数量和施工日期进行汇总，取可得出施工机械需要量计算。",[632,633],{"key":20,"text":571,"correct":22},{"key":24,"text":573,"correct":26},{"id":635,"libraryId":5,"type":566,"typeLabel":567,"stem":636,"options":637,"answer":571,"analysis":37},1256629,"进度计划中的”S”形曲线是以时间为横轴，以累计完成的工程费用的百分数为纵轴的图表化曲线。",[638,639],{"key":20,"text":571,"correct":22},{"key":24,"text":573,"correct":26},[641,645,648,651,654,657],{"id":642,"name":643,"category":7,"favorite":644},1,"领导干部任职前廉政法规知识测试题",92,{"id":646,"name":647,"category":7,"favorite":642},595,"建筑结构与设备",{"id":649,"name":650,"category":7,"favorite":642},715,"招标采购专业知识与法律法规",{"id":652,"name":653,"category":7,"favorite":642},848,"市政方向-通用基础",{"id":655,"name":656,"category":7,"favorite":8},534,"BIM工程师",{"id":658,"name":656,"category":7,"favorite":8},535]