[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":737},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,12,50,812,[13,33,48,63,78,93,108,123,138,153,168,183,198,212,226,240,255,269,283,298,312,327,341,355,369,382,396,411,425,439,453,467,481,495,509,524,539,554,568,583,597,611,626,640,653,667,682,696,709,723],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":31,"analysis":32},1256530,2,"多选题","分段不分层时无间歇时间的等节拍专业流水的施工工期计算公式正确的是（ ）。",[19,22,24,27,29],{"key":20,"text":20,"correct":21},"A",true,{"key":23,"text":23,"correct":21},"B",{"key":25,"text":25,"correct":26},"C",false,{"key":28,"text":28,"correct":26},"D",{"key":30,"text":30,"correct":21},"E","ABE","",{"id":34,"libraryId":5,"type":15,"typeLabel":16,"stem":35,"options":36,"answer":47,"analysis":32},1256531,"对比分析施工实际进度与计划进度时，常采用的方法有（ ）。",[37,39,41,43,45],{"key":20,"text":38,"correct":26},"表格比较法",{"key":23,"text":40,"correct":21},"横道图比较法",{"key":25,"text":42,"correct":21},"S形曲线比较法",{"key":28,"text":44,"correct":21},"香蕉曲线比较法",{"key":30,"text":46,"correct":21},"进度前锋线法","BCDE",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":62,"analysis":32},1256532,"流水作业法的主要特点包括（ ）。",[52,54,56,58,60],{"key":20,"text":53,"correct":26},"充分利用工作面进行施工，总工期较短",{"key":23,"text":55,"correct":21},"每天投人的资源量较为均衡，有利于资源供应的组织工作",{"key":25,"text":57,"correct":26},"不强调分工协作，各作业单位都是间歇作业",{"key":28,"text":59,"correct":21},"专业化作业队能够连续作业，相邻作业队的施工时间能最大限度地搭接",{"key":30,"text":61,"correct":26},"如果各工作面之间需共用某种资源时，施工现场的组织管理比较复杂，协调工作量大","BD",{"id":64,"libraryId":5,"type":15,"typeLabel":16,"stem":65,"options":66,"answer":77,"analysis":32},1256533,"在编制某市政工程施工进度计划时，主要包括的内容有（ ）。",[67,69,71,73,75],{"key":20,"text":68,"correct":21},"各施工项目的工程量",{"key":23,"text":70,"correct":21},"劳动量或机械台班量",{"key":25,"text":72,"correct":21},"工作持续时间",{"key":28,"text":74,"correct":21},"施工班组人数及施工进度",{"key":30,"text":76,"correct":26},"人员素质","ABCD",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":92,"analysis":32},1256534,"关于双代号网络计划的说法正确的有（ ）。",[82,84,86,88,90],{"key":20,"text":83,"correct":26},"可能没有关键线路",{"key":23,"text":85,"correct":21},"至少有一条关键线路",{"key":25,"text":87,"correct":21},"当计划工期等于计算工期时，关键工作为总时差为零的工作",{"key":28,"text":89,"correct":26},"在网络计划执行过程中，关键线路不能转移",{"key":30,"text":91,"correct":26},"由关键节点组成的线路是关键线路","BC",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":107,"analysis":32},1256535,"分段的大小应与（ ）相适应，保证足够的工作面，以便于操作，发挥生产效率。",[97,99,101,103,105],{"key":20,"text":98,"correct":21},"劳动组织",{"key":23,"text":100,"correct":26},"施工步距",{"key":25,"text":102,"correct":21},"机械设备",{"key":28,"text":104,"correct":21},"施工机械生产能力",{"key":30,"text":106,"correct":26},"人员结构","ACD",{"id":109,"libraryId":5,"type":15,"typeLabel":16,"stem":110,"options":111,"answer":122,"analysis":32},1256536,"施工进度计划检查完成后，应向企业提供施工进度报告，报告应包括的内容有（ ）。",[112,114,116,118,120],{"key":20,"text":113,"correct":21},"劳务记录及预测",{"key":23,"text":115,"correct":26},"计划施工进度图及简要说明",{"key":25,"text":117,"correct":26},"待解决的问题",{"key":28,"text":119,"correct":21},"工程变更",{"key":30,"text":121,"correct":21},"索赔及工程款收支情况","ADE",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":137,"analysis":32},1256537,"顺序作业法的主要特点有（ ）。",[127,129,131,133,135],{"key":20,"text":128,"correct":21},"没有充分利用工作面进行施工",{"key":23,"text":130,"correct":26},"用于需要突击性施工时施工作业的组织",{"key":25,"text":132,"correct":21},"施工现场的组织、管理比较简单",{"key":28,"text":134,"correct":26},"专业化作业队能够连续作业",{"key":30,"text":136,"correct":21},"有利于资源供应的组织工作","ACE",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":152,"analysis":32},1256538,"在编制单位工程施工进度计划时，应包括的内容有（ ）。",[142,144,146,148,150],{"key":20,"text":143,"correct":21},"施工段落划分",{"key":23,"text":145,"correct":21},"施工顺序确定",{"key":25,"text":147,"correct":21},"施工机具选择",{"key":28,"text":149,"correct":26},"施工组织机构",{"key":30,"text":151,"correct":26},"专项方案确定","ABC",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":167,"analysis":32},1256539,"施工阶段进度控制的具体措施有（ ）。",[157,159,161,163,165],{"key":20,"text":158,"correct":21},"组织措施",{"key":23,"text":160,"correct":26},"安全措施",{"key":25,"text":162,"correct":21},"经济措施",{"key":28,"text":164,"correct":21},"合同措施",{"key":30,"text":166,"correct":21},"技术措施","ACDE",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":182,"analysis":32},1256540,"桥梁施工中，有些施工顺序不受固定顺序的限制是指如（ ）。",[172,174,176,178,180],{"key":20,"text":173,"correct":26},"钻孔灌注桩和桥墩的施工顺序",{"key":23,"text":175,"correct":21},"上部结构预制与下部结构施工顺序",{"key":25,"text":177,"correct":21},"整个桥梁施工是从一岸向另一岸推进，还是从两岸向中间推进",{"key":28,"text":179,"correct":21},"先施工水中基础还是先施工岸边基础或两者同时进行",{"key":30,"text":181,"correct":26},"后张法预应力张拉与混冱土浇筑","BCD",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":32},1256541,"若某项工作比原计划拖后，当拖后的时间小于其拥有的总时差时，则（ ）。",[187,189,191,193,195],{"key":20,"text":188,"correct":26},"不影响其后续工作和工程总工期",{"key":23,"text":190,"correct":26},"不影响其后续工作，但影响总工期",{"key":25,"text":192,"correct":26},"影响其后续工作且影响工程总期",{"key":28,"text":194,"correct":21},"影响后续工作最迟开始时间",{"key":30,"text":196,"correct":21},"影响其后续工作但不影响工程总期","DE",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":197,"analysis":32},1256542,"在某市政道路工程进度计划采用双代号网络图进行编制，关键工作具备的特点是（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":26},"工程量大",{"key":23,"text":205,"correct":26},"技术最复杂",{"key":25,"text":207,"correct":26},"消耗资源多",{"key":28,"text":209,"correct":21},"自由时差为零",{"key":30,"text":211,"correct":21},"总时差最小",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":167,"analysis":32},1256543,"常见的影响工程进度的风险有：组织风险、（ ）等。",[216,218,220,222,224],{"key":20,"text":217,"correct":21},"合同风险",{"key":23,"text":219,"correct":26},"不可抗力",{"key":25,"text":221,"correct":21},"管理风险",{"key":28,"text":223,"correct":21},"技术风险",{"key":30,"text":225,"correct":21},"资源（人力、物力和财力）风险",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":107,"analysis":32},1256544,"施工过程的单位可大可小，可以是（ ）。",[230,232,234,236,238],{"key":20,"text":231,"correct":21},"分项工程",{"key":23,"text":233,"correct":26},"整个施工项目",{"key":25,"text":235,"correct":21},"单位工程",{"key":28,"text":237,"correct":21},"分部工程",{"key":30,"text":239,"correct":26},"单项工程",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":254,"analysis":32},1256545,"编制施工进度图的依据有（ ）。",[244,246,248,250,252],{"key":20,"text":245,"correct":21},"设计图纸",{"key":23,"text":247,"correct":21},"自然调查条件",{"key":25,"text":249,"correct":26},"预算文件",{"key":28,"text":251,"correct":21},"劳动力供应情况",{"key":30,"text":253,"correct":21},"合同规定开工、竣工日期","ABDE",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":31,"analysis":32},1256546,"施工段的划分一般应该遵循原则有（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":21},"要尽可能考虑工程的结构特征",{"key":23,"text":262,"correct":21},"各工作段的工作量尽可能相等",{"key":25,"text":264,"correct":26},"要不大于最小工作面",{"key":28,"text":266,"correct":26},"施工段数必须大于施工程数",{"key":30,"text":268,"correct":21},"要考虑合理的劳动组织要求",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":254,"analysis":32},1256547,"在编制完成单位工程施工进度计划时，需要编制的资源需要量计划主要有（ ）。",[273,275,277,279,281],{"key":20,"text":274,"correct":21},"劳动力需要计划",{"key":23,"text":276,"correct":21},"主要材料需要计划",{"key":25,"text":278,"correct":26},"临时材料需要计划",{"key":28,"text":280,"correct":21},"构件和半成品需要量计划",{"key":30,"text":282,"correct":21},"施工机械需要量计划",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":297,"analysis":32},1256548,"流水施工的工艺参数是（ ）。",[287,289,291,293,295],{"key":20,"text":288,"correct":26},"施工段数",{"key":23,"text":290,"correct":26},"施工层数",{"key":25,"text":292,"correct":21},"施工过程数",{"key":28,"text":294,"correct":21},"流水强度",{"key":30,"text":296,"correct":26},"流水步距","CD",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":182,"analysis":32},1256549,"经纬仪在必要辅助工具支持下可以直接用来测量（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":26},"方位角",{"key":23,"text":305,"correct":21},"水平角",{"key":25,"text":307,"correct":21},"竖直角",{"key":28,"text":309,"correct":21},"视距",{"key":30,"text":311,"correct":26},"级坐标",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":326,"analysis":32},1256550,"桥梁施工图中，钢筋混凝土结构图包括（ ）。",[316,318,320,322,324],{"key":20,"text":317,"correct":21},"构件构造图",{"key":23,"text":319,"correct":26},"桥梁总体布置图",{"key":25,"text":321,"correct":26},"桥梁结构图",{"key":28,"text":323,"correct":26},"桥梁平面图",{"key":30,"text":325,"correct":21},"钢筋结构图","AE",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":152,"analysis":32},1256551,"桥梁脚手架搭设完成后，应组织（ ）对整个架体结构进行全面的检查和验收，经验收合格后，方可使用。",[331,333,335,337,339],{"key":20,"text":332,"correct":21},"技术人员",{"key":23,"text":334,"correct":21},"施工人员",{"key":25,"text":336,"correct":21},"安全人员",{"key":28,"text":338,"correct":26},"采购人员",{"key":30,"text":340,"correct":26},"合约人员",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":77,"analysis":32},1256552,"城市道路平面交叉口施工图的识读内容包括（ ）。",[345,347,349,351,353],{"key":20,"text":346,"correct":21},"了解设计范围和施工范围",{"key":23,"text":348,"correct":21},"了解路面的性质及所用材料",{"key":25,"text":350,"correct":21},"了解道路中心线、车行道、人行道、缘石半径、进水等位置",{"key":28,"text":352,"correct":21},"了解相交道路的坡度和坡向",{"key":30,"text":354,"correct":26},"了解施工方法过程",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":152,"analysis":32},1256553,"道路路线工程图主要是用（ ），综合起来表达路线的空间位置、线型和尺寸。",[359,361,363,365,367],{"key":20,"text":360,"correct":21},"路线平面图",{"key":23,"text":362,"correct":21},"路线纵断面图",{"key":25,"text":364,"correct":21},"路线横断面图",{"key":28,"text":366,"correct":26},"高程图",{"key":30,"text":368,"correct":26},"结构图",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":77,"analysis":32},1256554,"表示桥梁工程的图样一般可分为（ ）。",[373,375,377,378,380],{"key":20,"text":374,"correct":21},"桥位平面图",{"key":23,"text":376,"correct":21},"桥位地质断面图",{"key":25,"text":319,"correct":21},{"key":28,"text":379,"correct":21},"构件结构图",{"key":30,"text":381,"correct":26},"桥梁截面图",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":254,"analysis":32},1256555,"市政给排水管道施工组织设计应由施工项目部技术负责人向项目部（ ）管理人员技术交底。",[386,388,390,392,394],{"key":20,"text":387,"correct":21},"施工",{"key":23,"text":389,"correct":21},"技术",{"key":25,"text":391,"correct":26},"设备",{"key":28,"text":393,"correct":21},"质量",{"key":30,"text":395,"correct":21},"安全",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":410,"analysis":32},1256556,"对钢筋编号时，宜（ ）。",[400,402,404,406,408],{"key":20,"text":401,"correct":21},"先编主、次部位的主筋",{"key":23,"text":403,"correct":21},"后编主、次部位的构造筋",{"key":25,"text":405,"correct":26},"从左到右",{"key":28,"text":407,"correct":26},"从下到上",{"key":30,"text":409,"correct":26},"先主后次","AB",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":137,"analysis":32},1256557,"某市政道路桥梁工程施工项目，承包人建立了以项目总工第一责任人的质量管理体系，监理单位也建立了相应的质量建立体系。项目施工完后，报请政府相关机构进行质量验收时，遭受拒绝。 我国现行对工程质量通常采用按造成损失严重程度分为（ ）类。",[415,417,419,421,423],{"key":20,"text":416,"correct":21},"一般质量事故",{"key":23,"text":418,"correct":26},"蜂窝麻面",{"key":25,"text":420,"correct":21},"严重质量事故",{"key":28,"text":422,"correct":26},"钢筋外露",{"key":30,"text":424,"correct":21},"重大质量事故",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":167,"analysis":32},1256558,"绘制剖面图常用的剖切方法包括（ ）。",[429,431,433,435,437],{"key":20,"text":430,"correct":21},"用一个剖切面剖切",{"key":23,"text":432,"correct":26},"用多条平行剖切面剖切",{"key":25,"text":434,"correct":21},"局部剖切",{"key":28,"text":436,"correct":21},"分层剖切",{"key":30,"text":438,"correct":21},"用两个以上平行剖切面剖切",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":47,"analysis":32},1256559,"现浇预应力混凝土盖梁施工应控制好（ ）四个环节。",[443,445,447,449,451],{"key":20,"text":444,"correct":26},"准备",{"key":23,"text":446,"correct":21},"支架搭设",{"key":25,"text":448,"correct":21},"拆除",{"key":28,"text":450,"correct":21},"预应力张拉",{"key":30,"text":452,"correct":21},"模板设计",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":152,"analysis":32},1256560,"衡量观测成果的精度的标准有（ ）。",[457,459,461,463,465],{"key":20,"text":458,"correct":21},"中误差",{"key":23,"text":460,"correct":21},"容许误差",{"key":25,"text":462,"correct":21},"相对误差",{"key":28,"text":464,"correct":26},"总体误差",{"key":30,"text":466,"correct":26},"偶然误差",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":62,"analysis":32},1256561,"编制给排水管道工程技术交底时，需要说明作业人员的（ ）、特殊工种持证上岗要求等。",[471,473,475,477,479],{"key":20,"text":472,"correct":26},"管理人员配置",{"key":23,"text":474,"correct":21},"劳动力配置",{"key":25,"text":476,"correct":26},"进退场计划",{"key":28,"text":478,"correct":21},"培训",{"key":30,"text":480,"correct":26},"管理要求",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":167,"analysis":32},1256562,"下列选项中，属于沉入桩分部工程技术交底主要内容的有（ ）。",[485,487,489,491,493],{"key":20,"text":486,"correct":21},"施工准备",{"key":23,"text":488,"correct":26},"试验方法",{"key":25,"text":490,"correct":21},"施工工艺流程",{"key":28,"text":492,"correct":21},"成品保护措施",{"key":30,"text":494,"correct":21},"安全技术措施",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":77,"analysis":32},1256563,"技术交底是为使参加施工的人员对工程及其技术要求做到心中有数，掌握设计要求、（ ）及安全注意事项等。",[499,501,503,505,507],{"key":20,"text":500,"correct":21},"相关图纸内容",{"key":23,"text":502,"correct":21},"工程特点",{"key":25,"text":504,"correct":21},"质量标准",{"key":28,"text":506,"correct":21},"施工方法",{"key":30,"text":508,"correct":26},"法律法规",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":523,"analysis":32},1256564,"已知设计坡度线的放样方法有（ ）。",[513,515,517,519,521],{"key":20,"text":514,"correct":21},"水平视线法",{"key":23,"text":516,"correct":26},"高程确定法",{"key":25,"text":518,"correct":26},"水平距离测设法",{"key":28,"text":520,"correct":21},"倾斜视线法",{"key":30,"text":522,"correct":26},"级坐标测设法","AD",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":538,"analysis":32},1256565,"质量控制是质量管理的一部分而不是全部，在明确的质量目标和具体的条件下，通过行动方案和资源配置的（ ），进行质量目标的事前预控、事中控制，实现预期质量目标的系统过程。",[528,530,532,534,536],{"key":20,"text":529,"correct":26},"管理",{"key":23,"text":531,"correct":21},"计划",{"key":25,"text":533,"correct":26},"研究",{"key":28,"text":535,"correct":21},"实施",{"key":30,"text":537,"correct":21},"检查","BDE",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":553,"analysis":32},1256566,"编制土方工程技术交底时，需要说明机械设备的（ ）、使用要求等。",[543,545,547,549,551],{"key":20,"text":544,"correct":21},"名称",{"key":23,"text":546,"correct":21},"型号",{"key":25,"text":548,"correct":26},"厂家",{"key":28,"text":550,"correct":21},"性能",{"key":30,"text":552,"correct":26},"检验要求","ABD",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":107,"analysis":32},1256567,"全站仪的测距模式有（ ）模式。",[558,560,562,564,566],{"key":20,"text":559,"correct":21},"精测",{"key":23,"text":561,"correct":26},"夜间",{"key":25,"text":563,"correct":21},"跟踪",{"key":28,"text":565,"correct":21},"粗测",{"key":30,"text":567,"correct":26},"红外线",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":582,"analysis":32},1256568,"水准仪的水准器的分划值越小，说明（ ）。",[572,574,576,578,580],{"key":20,"text":573,"correct":26},"内圆弧半径增大",{"key":23,"text":575,"correct":21},"其灵敏度高",{"key":25,"text":577,"correct":26},"气泡整平困难",{"key":28,"text":579,"correct":26},"整平精度低",{"key":30,"text":581,"correct":21},"整平精度高","BE",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":77,"analysis":32},1256569,"根据《关于做好房屋建筑和市政基础设施施质量事故报告和调查处理工作的通知》（建质[201明111号），按事故造成的损失程度，工程质量事故分为（ ）。",[587,589,591,593,595],{"key":20,"text":588,"correct":21},"特别重大事故",{"key":23,"text":590,"correct":21},"重大事故",{"key":25,"text":592,"correct":21},"较大事故",{"key":28,"text":594,"correct":21},"一般事故",{"key":30,"text":596,"correct":26},"质量问题",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":31,"analysis":32},1256570,"编制技术交底过程中，必要时应说明其合法性规定的小型工具有（ ）。",[601,603,605,607,609],{"key":20,"text":602,"correct":21},"经纬仪",{"key":23,"text":604,"correct":21},"水准仪",{"key":25,"text":606,"correct":26},"对焊机",{"key":28,"text":608,"correct":26},"调直机",{"key":30,"text":610,"correct":21},"靠尺",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":625,"analysis":32},1256571,"竖曲线的要素有（ ）。",[615,617,619,621,623],{"key":20,"text":616,"correct":26},"交叉点",{"key":23,"text":618,"correct":26},"转折角",{"key":25,"text":620,"correct":21},"半径",{"key":28,"text":622,"correct":21},"切线长",{"key":30,"text":624,"correct":21},"外距","CDE",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":31,"analysis":32},1256572,"桩基工程专项施工方案应由施工项目部技术负责人向项目部（ ）交底。",[630,632,634,636,638],{"key":20,"text":631,"correct":21},"技术管理人员",{"key":23,"text":633,"correct":21},"质量管理人员",{"key":25,"text":635,"correct":26},"班组长",{"key":28,"text":637,"correct":26},"设备管理人员",{"key":30,"text":639,"correct":21},"安全管理人员",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":410,"analysis":32},1256573,"经纬仪安置包括（ ）。",[644,646,648,649,651],{"key":20,"text":645,"correct":21},"对中",{"key":23,"text":647,"correct":21},"整平",{"key":25,"text":645,"correct":26},{"key":28,"text":650,"correct":26},"读数",{"key":30,"text":652,"correct":26},"调焦",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":47,"analysis":32},1256574,"编制道路工程技术交底时，需要说明主要材料的（ ）；每次领料批量要求等。",[657,659,661,663,665],{"key":20,"text":658,"correct":26},"施工所需材料厂家、名称、规格、性能、型号",{"key":23,"text":660,"correct":21},"材料质量标准",{"key":25,"text":662,"correct":21},"材料品种规格等直观要求",{"key":28,"text":664,"correct":21},"材料感官判断合格的方法",{"key":30,"text":666,"correct":21},"强调从有“检验合格”标识牌的材料堆放处领料",{"id":668,"libraryId":5,"type":15,"typeLabel":16,"stem":669,"options":670,"answer":681,"analysis":32},1256575,"“建筑施工安全检查评分汇总表”是对各分项检查结果的汇总，主要包括（ ）物料提升与外用电梯、塔吊起重吊装和施工机具等内容。",[671,673,675,677,679],{"key":20,"text":672,"correct":21},"安全管理",{"key":23,"text":674,"correct":21},"文明施工",{"key":25,"text":676,"correct":21},"“三宝”“四口”防护",{"key":28,"text":678,"correct":26},"爱护和正确使用安全防护装置（设施）及个人劳动防护用品",{"key":30,"text":680,"correct":21},"施工用电","ABCE",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":31,"analysis":32},1256576,"“三宝”防护是指（ ）的正确使用。",[686,688,690,692,694],{"key":20,"text":687,"correct":21},"安全帽",{"key":23,"text":689,"correct":21},"安全带",{"key":25,"text":691,"correct":26},"防撞标志",{"key":28,"text":693,"correct":26},"交通安全标志",{"key":30,"text":695,"correct":21},"安全网",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":553,"analysis":32},1256577,"企业必须建立的安全生产管理基本制度，包括（ ）、伤亡事故的调查和处理等制度。",[700,702,703,705,707],{"key":20,"text":701,"correct":21},"安全生产责任制",{"key":23,"text":494,"correct":21},{"key":25,"text":704,"correct":26},"人员轮岗制度",{"key":28,"text":706,"correct":21},"安全生产培训和教育",{"key":30,"text":708,"correct":26},"听查课制度",{"id":710,"libraryId":5,"type":15,"typeLabel":16,"stem":711,"options":712,"answer":77,"analysis":32},1256578,"模板工程安全技术交底包括（ ）。",[713,715,717,719,721],{"key":20,"text":714,"correct":21},"不得在脚手架上堆放大批模板等材料",{"key":23,"text":716,"correct":21},"禁止使用2X4木料作顶撑",{"key":25,"text":718,"correct":21},"支撑、牵杠等不得搭在门窗框和脚手架上",{"key":28,"text":720,"correct":21},"支模过程中，如需中途停歇，应将支撑、搭头、柱头板等钉牢。拆模间歇时，应将已活动的弹板、牵杠、支撑等运走或妥善堆放，防止因踏空、扶空而坠落",{"key":30,"text":722,"correct":26},"通路中间的斜撑、拉杆等应设在1m高以上",{"id":724,"libraryId":5,"type":15,"typeLabel":16,"stem":725,"options":726,"answer":297,"analysis":32},1256579,"作业人员有权（ ）。",[727,729,731,733,735],{"key":20,"text":728,"correct":26},"对作业程序擅自改变",{"key":23,"text":730,"correct":26},"对安全问题提出控告",{"key":25,"text":732,"correct":21},"拒绝违章指挥",{"key":28,"text":734,"correct":21},"拒绝强令冒险作业",{"key":30,"text":736,"correct":26},"对设计方案擅自变更",[738,742,745,748,751,754],{"id":739,"name":740,"category":7,"favorite":741},1,"领导干部任职前廉政法规知识测试题",92,{"id":743,"name":744,"category":7,"favorite":739},595,"建筑结构与设备",{"id":746,"name":747,"category":7,"favorite":739},715,"招标采购专业知识与法律法规",{"id":749,"name":750,"category":7,"favorite":739},848,"市政方向-通用基础",{"id":752,"name":753,"category":7,"favorite":8},534,"BIM工程师",{"id":755,"name":753,"category":7,"favorite":8},535]