[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":576},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,11,50,812,[13,34,46,58,70,82,94,106,118,129,141,153,165,177,189,201,213,223,235,247,258,270,282,294,306,318,330,339,351,362,373,385,396,407,417,429,439,449,461,470,480,492,501,509,518,526,534,542,553,564],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1256479,1,"单选题","下列不属于工程量计算依据的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","工程量计算规则",false,{"key":24,"text":25,"correct":22},"B","施工设计图纸及其说明",{"key":27,"text":28,"correct":29},"C","施工组织设计或施工方案",true,{"key":31,"text":32,"correct":22},"D","招标文件","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1256480,"下列（ ）事项发生时，发承包双方按照合同约定不需要调整合同价款。",[38,40,42,44],{"key":20,"text":39,"correct":22},"法律法规变化",{"key":24,"text":41,"correct":22},"工程量清单缺项",{"key":27,"text":43,"correct":22},"工程特征不符",{"key":31,"text":45,"correct":29},"工程量偏差在合同约定幅度以内",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1256481,"工程项目信息管理的核心指导文件是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"信息编码体系",{"key":24,"text":53,"correct":22},"信息分类标准",{"key":27,"text":55,"correct":29},"信息管理手册",{"key":31,"text":57,"correct":22},"信息处理方法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1256482,"按照《建设工程文件归档整理规范》，建设工程档案资料分为：监理文件、施工文件、竣工图、竣工验收文件和（ ）五大类。",[62,64,66,68],{"key":20,"text":63,"correct":22},"财务文件",{"key":24,"text":65,"correct":22},"建设用地规划许可证文件",{"key":27,"text":67,"correct":22},"施工图设计文件",{"key":31,"text":69,"correct":29},"工程准备阶段文件",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1256483,"信息是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"情报",{"key":24,"text":77,"correct":29},"对数据的解释",{"key":27,"text":79,"correct":22},"数据",{"key":31,"text":81,"correct":22},"载体",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1256484,"建设工程文件档案资料是由（ ）组成。",[86,88,90,92],{"key":20,"text":87,"correct":22},"建设工程文件",{"key":24,"text":89,"correct":22},"建设工程监理文件",{"key":27,"text":91,"correct":22},"建设工程验收文件",{"key":31,"text":93,"correct":29},"建设工程文件、建设工程档案和建设工程资料",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1256485,"按照建设工程项目目标划分，信息的分类有（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"项目内部信息和外部信息",{"key":24,"text":101,"correct":22},"生产性、技术性、经济性和资源性信息",{"key":27,"text":103,"correct":22},"固定信息和流动信息",{"key":31,"text":105,"correct":29},"投资控制、进度控制、质量控制信息及合同管理信息",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1256486,"分包的施工资料应同步收集、整理，并提交给（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"建设单位",{"key":24,"text":113,"correct":29},"总包单位",{"key":27,"text":115,"correct":22},"建设行政主管部门",{"key":31,"text":117,"correct":22},"监理单位",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1256487,"为了充分利用和发挥信息资源的价值、提高信息管理效率以及实现有序的和科学的信息管理，各方都应该编制各自的（ ）。",[122,124,126,127],{"key":20,"text":123,"correct":22},"项目管理规划",{"key":24,"text":125,"correct":22},"系统开发计划",{"key":27,"text":55,"correct":29},{"key":31,"text":128,"correct":22},"信息编码表",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},1256488,"建设工程项目信息由文字图形信息、语言信息和（ ）构成。",[133,135,137,139],{"key":20,"text":134,"correct":22},"经济类信息",{"key":24,"text":136,"correct":29},"新技术信息",{"key":27,"text":138,"correct":22},"固定信息",{"key":31,"text":140,"correct":22},"环境信息",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":20,"analysis":33},1256489,"监理主要文件档案中的监理工作总结：竣工总结、专题说结和（ ）3类。",[145,147,149,151],{"key":20,"text":146,"correct":29},"月报总结",{"key":24,"text":148,"correct":22},"单位工程监理工作总结",{"key":27,"text":150,"correct":22},"分部、分项工程监理工作总结",{"key":31,"text":152,"correct":22},"建设工程项目监理工作总结",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},1256491,"信息管理部门负责编制信息管理手册，在项目（ ）进行信息管理手册的必要的修改和补充，并检查和督促其执行。",[157,159,161,163],{"key":20,"text":158,"correct":29},"实施过程中",{"key":24,"text":160,"correct":22},"可行性研究阶段",{"key":27,"text":162,"correct":22},"竣工验收时",{"key":31,"text":164,"correct":22},"开工时",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},1256492,"我国在建设工程项目管理中，当前最薄弱的工作领域是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"质量管理",{"key":24,"text":172,"correct":22},"安全管理",{"key":27,"text":174,"correct":22},"成本管理",{"key":31,"text":176,"correct":29},"信息管理",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},1256493,"数据是（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"资料",{"key":24,"text":184,"correct":22},"信息",{"key":27,"text":186,"correct":29},"客观实体属性的反映",{"key":31,"text":188,"correct":22},"数量",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},1256494,"下列不属于施工记录信息的选项是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"材料设备进场记录",{"key":24,"text":196,"correct":29},"施工日志",{"key":27,"text":198,"correct":22},"施工组织设计",{"key":31,"text":200,"correct":22},"质量检查记录",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},1256495,"施工方信息管理手段的核心是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":29},"实现工程管理信息化",{"key":24,"text":208,"correct":22},"为项目建设的增值",{"key":27,"text":210,"correct":22},"进行投资、质量、进度控制",{"key":31,"text":212,"correct":22},"编制信息管理手册",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":27,"analysis":33},1256496,"建设工程项目的信息管理是通过对各个系统、各项工作和各种数据的管理，使项目的（ ）能方便和有效地获取、存储、存档、处理和交流。",[217,219,221,222],{"key":20,"text":218,"correct":22},"成本",{"key":24,"text":220,"correct":22},"图纸",{"key":27,"text":184,"correct":29},{"key":31,"text":79,"correct":22},{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":27,"analysis":33},1256497,"建设工程项目信息分类基本方法有面分类法和（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":22},"系统分类法",{"key":24,"text":230,"correct":22},"标准分类法",{"key":27,"text":232,"correct":29},"线分类法",{"key":31,"text":234,"correct":22},"综合分类法",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":31,"analysis":33},1256498,"施工文件档案管理中规定，在开工前由施工单位现场负责人填写“施工现场质量管理检查记录”，报（ ）检查，并做出检查结论。",[239,241,243,245],{"key":20,"text":240,"correct":22},"建设主管部门",{"key":24,"text":242,"correct":22},"建设审批部门",{"key":27,"text":244,"correct":22},"设计单位负责人",{"key":31,"text":246,"correct":29},"项目总监理工程师",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},1256499,"送建设单位永久保存的监理文件有工程延期报告及审批和（ ）共两大类。",[251,253,255,257],{"key":20,"text":252,"correct":29},"合同争议、违约报告及处理意见",{"key":24,"text":254,"correct":22},"分包单位资技材料",{"key":27,"text":256,"correct":22},"设计变更、治商费用报审与签认",{"key":31,"text":152,"correct":22},{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":31,"analysis":33},1256500,"下列不属于施工资料的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"施工物资资料",{"key":24,"text":265,"correct":22},"施工技术资料",{"key":27,"text":267,"correct":22},"施工管理资料",{"key":31,"text":269,"correct":29},"施工财务资料",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":27,"analysis":33},1256501,"在工程施工技术管理资料中，工程竣工文件作为工程施工技术管理资料的一部分，应包括竣工报告、竣工验收证明书和（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"隐蔽工程验收资料",{"key":24,"text":277,"correct":22},"工程施工质量验收资料",{"key":27,"text":279,"correct":29},"工程质量保修书",{"key":31,"text":281,"correct":22},"工程质量控制资料",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":31,"analysis":33},1256502,"建设工程文件是指（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"在工程建设过程中形成的各种形式的记录，包括监理文件",{"key":24,"text":289,"correct":22},"在工程建设过程中形成的各种形式的记录，包括监理文件、施工文件、设计文件",{"key":27,"text":291,"correct":22},"在工程建设活动中直接形成的具有保存价值的文字、图表、声像等各种形式的历史记录",{"key":31,"text":293,"correct":29},"在工程建设过程中形成的各种形式的信息记录，包括工程准备阶段文件、监理文件、施工文件、竣工图和竣工验收文件",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":20,"analysis":33},1256503,"在安全生产事故发生后，负有报告职责的人员不报或者谎报事故情况，贻误事故抢救，情节严重的，处（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":29},"3年以下有期徒刑或者拘役",{"key":24,"text":301,"correct":22},"3年以上7年以下有期徒刑",{"key":27,"text":303,"correct":22},"5年以下有期徒刑或者拘役",{"key":31,"text":305,"correct":22},"5年以上有期徒刑",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},1256504,"按照住房和城乡建设部有关规定，起重量（ ）kN及以上的起重设备安装工程应当编制专项施工方案。",[310,312,314,316],{"key":20,"text":311,"correct":29},"300",{"key":24,"text":313,"correct":22},"400",{"key":27,"text":315,"correct":22},"500",{"key":31,"text":317,"correct":22},"600",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},1256505,"主控项目的质量经抽样检验合格率应为（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":29},"100％",{"key":24,"text":325,"correct":22},"95％",{"key":27,"text":327,"correct":22},"90％",{"key":31,"text":329,"correct":22},"80％",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":27,"analysis":33},1256506,"单位工程中的分包工程验收后，分包单位应将所分包工程的质量控制资料整理完整后，移交给（ ）。",[334,335,336,337],{"key":20,"text":117,"correct":22},{"key":24,"text":111,"correct":22},{"key":27,"text":113,"correct":29},{"key":31,"text":338,"correct":22},"城市档案主管部门",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":31,"analysis":33},1256507,"新建的城市道路交付使用后（ ）年内不得挖掘。",[343,345,347,349],{"key":20,"text":344,"correct":22},"1",{"key":24,"text":346,"correct":22},"2",{"key":27,"text":348,"correct":22},"3",{"key":31,"text":350,"correct":29},"5",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":20,"analysis":33},1256508,"危险性较大的深基坑工程，专项施工方案应由施工单位技术负责人审核签字。然后上报，由（ ）审核签字。",[355,356,358,360],{"key":20,"text":246,"correct":29},{"key":24,"text":357,"correct":22},"项目负责人",{"key":27,"text":359,"correct":22},"项目经理",{"key":31,"text":361,"correct":22},"施工总监",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},1256509,"《建设工程安全生产管理条例》规定，对达到一定规模的危险性较大的分部分项工程编制专项施工方案，并附具安全验算结果，经施工单位技术负责人、总监理工程师签字后实施，由（ ）进行现场监督。",[366,368,369,371],{"key":20,"text":367,"correct":29},"专职安全生产管理人员",{"key":24,"text":357,"correct":22},{"key":27,"text":370,"correct":22},"技术负责人",{"key":31,"text":372,"correct":22},"安全负责人",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},1256510,"某城市给水工程项目，该工程项目属大中型工程项目施工组织设计，设计单位组织有关单位对施工图设计会审位对施工单位进行了施工技术交底。在施工过程中，监理单位及时编制了施工技术文件，按规范（GB\u002FT50328-2014）的要求进行归档。 专项方案应当由施工单位技术部门组织本单位施工技术、安全、质量等部门的专业技术人员进行审核。经审核合格的，由（ ）签字。",[377,379,381,383],{"key":20,"text":378,"correct":22},"项目技术负责人",{"key":24,"text":380,"correct":29},"施工单位技术负责人",{"key":27,"text":382,"correct":22},"总监理工程师",{"key":31,"text":384,"correct":22},"建设单位项目负责人",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":31,"analysis":33},1256511,"悬索桥的索夹安装时，索夹安装位置纵向误差不得大于（ ）mm。",[389,390,392,394],{"key":20,"text":350,"correct":22},{"key":24,"text":391,"correct":22},"6",{"key":27,"text":393,"correct":22},"8",{"key":31,"text":395,"correct":29},"10",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":24,"analysis":33},1256512,"架体高度在（ ）m及以上悬挑式脚手架工程，属于超过一定规模的危险性工程。",[400,401,403,405],{"key":20,"text":395,"correct":22},{"key":24,"text":402,"correct":29},"20",{"key":27,"text":404,"correct":22},"30",{"key":31,"text":406,"correct":22},"40",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":27,"analysis":33},1256513,"搭设高度在（ ）m及以上的落地式钢管脚手架工程应由承包单位组织专家论证制定专项工程方案编制。",[411,412,413,415],{"key":20,"text":404,"correct":22},{"key":24,"text":406,"correct":22},{"key":27,"text":414,"correct":29},"50",{"key":31,"text":416,"correct":22},"60",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":27,"analysis":33},1256514,"下列不是桥梁支架模板施工方案中应阐述的内容的是（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"技术参数",{"key":24,"text":424,"correct":22},"工艺流程",{"key":27,"text":426,"correct":29},"模板采购合同",{"key":31,"text":428,"correct":22},"检查验收标准与方法",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},1256515,"某城市给水工程项目，该工程项目属大中型工程项目施工组织设计，设计单位组织有关单位对施工图设计会审位对施工单位进行了施工技术交底。在施工过程中，监理单位及时编制了施工技术文件，按规范（GB\u002FT50328-2014）的要求进行归档。 2.图纸会审工作应由（ ）进行组织。",[433,434,435,437],{"key":20,"text":117,"correct":22},{"key":24,"text":111,"correct":29},{"key":27,"text":436,"correct":22},"施工单位",{"key":31,"text":438,"correct":22},"审计单位",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":24,"analysis":33},1256516,"专家组成员构成应当由（ ）名及以上（应组成单数）符合相关专业要求的专家组成。",[443,444,445,447],{"key":20,"text":348,"correct":22},{"key":24,"text":350,"correct":29},{"key":27,"text":446,"correct":22},"7",{"key":31,"text":448,"correct":22},"9",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":31,"analysis":33},1256517,"在施工过程中，通常划分挖基础、砌筑基础、回填土方等，这种按不同材料、不同施工方法划分的项目，称为（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"单项工程",{"key":24,"text":456,"correct":22},"分部工程",{"key":27,"text":458,"correct":22},"单位工程",{"key":31,"text":460,"correct":29},"分项工程",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},1256518,"超过一定规模的危险性较大分部分项工程专项方案应当由（ ）组织召开专家论证会。",[465,466,467,469],{"key":20,"text":117,"correct":22},{"key":24,"text":111,"correct":22},{"key":27,"text":468,"correct":22},"咨询单位",{"key":31,"text":436,"correct":29},{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":27,"analysis":33},1256519,"按照住房和城乡建设部有关规定，开挖深度超过（ ）m的基坑、槽的土方开挖工程应当编制专项施工方案。",[474,476,477,479],{"key":20,"text":475,"correct":22},"3（含3）",{"key":24,"text":350,"correct":22},{"key":27,"text":478,"correct":29},"5（含5）",{"key":31,"text":393,"correct":22},{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},1256520,"按照住房和城乡建设部有关规定，对深基坑工程进行专项施工方案，施工单位应当组织（ ）进行论证、审查。",[484,486,488,490],{"key":20,"text":485,"correct":22},"监理工程师",{"key":24,"text":487,"correct":29},"专家",{"key":27,"text":489,"correct":22},"施工单位技术人员",{"key":31,"text":491,"correct":22},"专业监理工程师",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":27,"analysis":33},1256521,"市政工程中，竣工报告应由（ ）进行提交。",[496,497,498,499],{"key":20,"text":111,"correct":22},{"key":24,"text":117,"correct":22},{"key":27,"text":436,"correct":29},{"key":31,"text":500,"correct":22},"质量监督单位",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},1256522,"专项方案应当由施工单位技术部门组织本单位施工技术、安全、质量等部门的专业技术人员进行审核。经审核合格的，由（ ）签字。",[505,506,507,508],{"key":20,"text":378,"correct":22},{"key":24,"text":380,"correct":29},{"key":27,"text":382,"correct":22},{"key":31,"text":384,"correct":22},{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":20,"analysis":33},1256523,"超过一定规模的危险性较大的分部分项工程专项方案应当由（ ）组织召开专家论证会。",[513,514,515,516],{"key":20,"text":436,"correct":29},{"key":24,"text":111,"correct":22},{"key":27,"text":117,"correct":22},{"key":31,"text":517,"correct":22},"质量监督局",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},1256524,"市政工程的竣工验收，应由（ ）项目负责人组织参建各方单位项目负责人进行单位工程验收。",[522,523,524,525],{"key":20,"text":111,"correct":29},{"key":24,"text":117,"correct":22},{"key":27,"text":436,"correct":22},{"key":31,"text":500,"correct":22},{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":20,"analysis":33},1256525,"大修的城市道路竣工后（ ）年内不得挖掘。",[530,531,532,533],{"key":20,"text":348,"correct":29},{"key":24,"text":350,"correct":22},{"key":27,"text":446,"correct":22},{"key":31,"text":350,"correct":22},{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":24,"analysis":33},1256526,"具备独立施工条件并能形成独立使用功能的建筑物或构筑物为一个（ ）。",[538,539,540,541],{"key":20,"text":454,"correct":22},{"key":24,"text":458,"correct":29},{"key":27,"text":456,"correct":22},{"key":31,"text":460,"correct":22},{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":24,"analysis":33},1256527,"（ ）是规划和指导施工全过程的综合性技术经济文件。",[546,548,549,551],{"key":20,"text":547,"correct":22},"施工方案",{"key":24,"text":198,"correct":29},{"key":27,"text":550,"correct":22},"施工进度计划",{"key":31,"text":552,"correct":22},"施工安全方案",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},1256528,"脚手架搭设前，（ ）应按脚手架专项施工方案的要求对搭设和使用人员进行技术交底。",[557,559,560,562],{"key":20,"text":558,"correct":29},"现场工程技术负责人",{"key":24,"text":357,"correct":22},{"key":27,"text":561,"correct":22},"安全监督人员",{"key":31,"text":563,"correct":22},"安装负责人",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":27,"analysis":33},1256529,"压力管道水压试验前，除接口外管道两侧及管顶以上回填高度不应小于（ ）m。",[568,570,572,574],{"key":20,"text":569,"correct":22},"0.3",{"key":24,"text":571,"correct":22},"0.4",{"key":27,"text":573,"correct":29},"0.5",{"key":31,"text":575,"correct":22},"0.6",[577,580,583,586,589,592],{"id":15,"name":578,"category":7,"favorite":579},"领导干部任职前廉政法规知识测试题",92,{"id":581,"name":582,"category":7,"favorite":15},595,"建筑结构与设备",{"id":584,"name":585,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":587,"name":588,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":590,"name":591,"category":7,"favorite":8},534,"BIM工程师",{"id":593,"name":591,"category":7,"favorite":8},535]