[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-840-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},840,"(市政施工)专业管理实务 岗位知识","建筑工程",0,10,50,812,[13,34,46,58,70,82,94,106,118,130,142,154,166,175,186,198,210,222,234,246,257,269,281,293,304,316,328,340,350,362,374,386,398,407,419,431,440,452,464,476,488,500,512,524,536,548,560,571,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1256429,1,"单选题","施工现场与管理缺陷有关的危险源有劳动组织不合理、安全责任制不健全、（ ）等。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","绝缘强度不够",false,{"key":24,"text":25,"correct":26},"B","对事故隐患整改不力",true,{"key":28,"text":29,"correct":22},"C","设备配置不安全",{"key":31,"text":32,"correct":22},"D","作业场地烟、雾、尘弥漫，视物不清","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1256430,"施工现场物的不安全状态包括设备无安全保险装置、防护罩未在适当位置、（ ）等。",[38,40,42,44],{"key":20,"text":39,"correct":26},"临边无护栏或护栏损坏",{"key":24,"text":41,"correct":22},"造成安全装置失效",{"key":28,"text":43,"correct":22},"未戴护目镜或面罩",{"key":31,"text":45,"correct":22},"坑道掘进、隧道开凿支撑不当",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1256431,"施工安全教育的主要内容不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"现场规章制度",{"key":24,"text":53,"correct":22},"本岗位安全操作",{"key":28,"text":55,"correct":26},"交通安全须知",{"key":31,"text":57,"correct":22},"安全生产须知",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1256432,"施工现场与管理缺陷有关的危险源有违规分包或转包工程、现场管理不到位、（ ）等。",[62,64,66,68],{"key":20,"text":63,"correct":26},"安全教育培训不够",{"key":24,"text":65,"correct":22},"B设备防护装置调整不当",{"key":28,"text":67,"correct":22},"照明光线不足",{"key":31,"text":69,"correct":22},"结构不合安全要求",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1256433,"某工地正在进行下水道工程的窨井砌砖作业，当时有6名砖瓦工在深达5m的无槽壁支撑的沟槽中施工，1名砖瓦工在地面休息。突然，地面休息的工人发现沟槽有不明水冒出，同时沟槽坍塌，沟槽边堆高达1.8m的土方下滑，急忙向沟底工人发出塌方危险信号，沟底6名工人向不同方向逃逸，其中5人幸免于难，1人被埋在土中，露出胳膊。5人见状忙用手挖土将人救出，同时报告现场负责人。该负责人立即调来运土翻斗车送伤者去医院抢救，因不知道最近的医院地址，用了近40皿n时间才送达。经医院检查，伤者因窒息时间过长已经死亡。施工负责人忙于接待死者家属，等到第3天才想起通知上级主管部门，等事故调查组接到拖延的事故报告到达现场时窨井已砌好，事故现场已面目全非。 应急救援预案中现场应急处置内容包括事故应急处置程序、（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"个人安全措施",{"key":24,"text":77,"correct":22},"现场应急处置措施",{"key":28,"text":79,"correct":22},"报警电话及上级管理部门、相关应急救援单位联络方式和联系人员",{"key":31,"text":81,"correct":22},"事故报告的基本要求和内容",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1256434,"照明变压器应使用（ ）变压器。",[86,88,90,92],{"key":20,"text":87,"correct":22},"自耦",{"key":24,"text":89,"correct":22},"普通",{"key":28,"text":91,"correct":22},"桥式",{"key":31,"text":93,"correct":26},"双绕组",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1256435,"基坑（槽）、边坡、基础桩、模板和临时建筑作业前，施工单位应按设计单位要求编制施工方案，（ ）审批签字，项目分管负责人组织有关部门验收，经验收合格签字后，方可作业。",[98,100,102,104],{"key":20,"text":99,"correct":26},"单位技术负责人",{"key":24,"text":101,"correct":22},"项目技术负责人",{"key":28,"text":103,"correct":22},"项目负责人",{"key":31,"text":105,"correct":22},"单位分管负责人",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1256436,"塔吊的防护，以下说法错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"三保险”、“五限位”齐全有效。夹轨器要齐全",{"key":24,"text":113,"correct":22},"路轨接地两端各设一组，中间间距不大于25m，电阻不大于4欧姆",{"key":28,"text":115,"correct":22},"轨道横拉杆两端各设一组，中间杆距不大于6m",{"key":31,"text":117,"correct":26},"轨道中间严禁堆杂物，路轨两侧和两端外堆物应离塔吊回转台尾部35cm以上",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1256437,"安全检查可分为（ ）。（其中①日常性检查；②专业性检查；③季节性检查；④节假日前后的检查；⑤不定期检查）",[122,124,126,128],{"key":20,"text":123,"correct":22},"①③④",{"key":24,"text":125,"correct":22},"②⑤",{"key":28,"text":127,"correct":22},"①②⑤",{"key":31,"text":129,"correct":26},"①②③④⑤",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1256438,"气割、电焊“十不烧”规定不包括（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"焊工应持证上岗，无特种作业安全操作证的人员，不准进行焊、割作业",{"key":24,"text":137,"correct":22},"凡一、二、三级动火范围的焊、割作业，未经动火审批，不准进行焊、割",{"key":28,"text":139,"correct":22},"焊工不了解焊件内部是否安全，不得进行焊、割",{"key":31,"text":141,"correct":26},"没有图纸不得焊、割",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1256439,"安全生产须知不包括（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"新工人进人工地前必须认真学习本工种安全技术操作规程",{"key":24,"text":149,"correct":22},"进人施工现场，必须戴好安全帽、扣好帽带",{"key":28,"text":151,"correct":26},"回家应换洗衣服",{"key":31,"text":153,"correct":22},"高空作业时，不准往下或向上抛材料和工具等物件",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1256440,"安全检查中的专业性检查不是针对（ ）进行的检查。",[158,160,162,164],{"key":20,"text":159,"correct":22},"特种作业",{"key":24,"text":161,"correct":26},"特殊人员",{"key":28,"text":163,"correct":22},"特殊场所",{"key":31,"text":165,"correct":22},"特种设备",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1256441,"施工现场物的不安全状态包括设备无安全保险装置、临边无护栏或护栏损坏、（ ）等。",[170,171,173,174],{"key":20,"text":41,"correct":22},{"key":24,"text":172,"correct":26},"照明光线不良",{"key":28,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1256442,"施工现场与管理缺陷有关的危险源有劳动组织不合理、没有安全操作规程或规程不健全、（ ）等。",[179,181,183,185],{"key":20,"text":180,"correct":26},"没有或不认真实施事故防范措施",{"key":24,"text":182,"correct":22},"设备绝缘不良",{"key":28,"text":184,"correct":22},"危房内作业",{"key":31,"text":32,"correct":22},{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":33},1256443,"对一个工程项目，（ ）是安全生产第一责任人。",[190,192,194,196],{"key":20,"text":191,"correct":26},"项目经理",{"key":24,"text":193,"correct":22},"工程师",{"key":28,"text":195,"correct":22},"安全员",{"key":31,"text":197,"correct":22},"班组长",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},1256444,"下列关于施工成本控制的施工中，论述正确的是（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"项目总工是项目成本管理的第一责任人",{"key":24,"text":205,"correct":22},"按照全面成本控制原则，应组织项目部各部门负责人参与成本控制",{"key":28,"text":207,"correct":22},"压缩生产用工和辅助用工，严格控制生产人员比例",{"key":31,"text":209,"correct":26},"合理布置材料的现场堆放和保管，减少二次搬运甩",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":28,"analysis":33},1256445,"工程量清单应采用综合单价计价。下列选项中，不属于综合单价构成的是（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"人工费",{"key":24,"text":217,"correct":22},"材料费",{"key":28,"text":219,"correct":26},"税金",{"key":31,"text":221,"correct":22},"利润",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},1256446,"某沟槽长25m，宽7.4m，高为2.0m，采用人工挖土，土质为四类土，放坡系数为0.25，根据工程量清单计算规则，则该沟槽的挖土方工程量为（ ）m3。",[226,228,230,232],{"key":20,"text":227,"correct":26},"370",{"key":24,"text":229,"correct":22},"395",{"key":28,"text":231,"correct":22},"407.5",{"key":31,"text":233,"correct":22},"420",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},1256447,"A公司中标的某城市场高架跨线桥工程，为15跨25m预应力简支梁桥，桥面宽22m，采用?1200mm的钻孔灌注桩基础，埋置式承台，Y型独立式立柱。工程中标价2850万元。经过成本预测分析，项目目标成本为2600万，其中间接成本占10％。在工程进行过程中发生了如下事件：事件1.工程开工2个月后，因资金不足，贷款500万元，共支付利息30万元。事件2.某承台开挖时发现文物，按上级有关部门要求停工30d，导致总工期拖延10d，未发生直接成本损失。 下列选项中，不属于成本控制的依据的是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"合同文件",{"key":24,"text":241,"correct":22},"施工成本计划",{"key":28,"text":243,"correct":22},"工程变更",{"key":31,"text":245,"correct":26},"施工进度计划",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":28,"analysis":33},1256448,"间接成本里包含的费用有（ ）。",[250,251,253,255],{"key":20,"text":215,"correct":22},{"key":24,"text":252,"correct":22},"材料费用",{"key":28,"text":254,"correct":26},"企业管理费",{"key":31,"text":256,"correct":22},"临时设施费",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":31,"analysis":33},1256449,"在工程实施阶段，有关工程计量和计价的说法错误的是（ ）。",[261,263,265,267],{"key":20,"text":262,"correct":22},"分部分项工程量依据双方确认的工程量，合同约定的综合单价计算",{"key":24,"text":264,"correct":22},"工程量清单中若出现工程量偏差，应按承包人履行合同义务过程中完成的工程量计算",{"key":28,"text":266,"correct":22},"当工程量变化在合同约定幅度以外的，综合单价应予以调整",{"key":31,"text":268,"correct":26},"计日工应按承包人上报的事项计算",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":31,"analysis":33},1256450,"两算对比的主要目的是将（ ）进行比较，以客观、全面反映本工程各子目的盈亏情况。",[273,275,277,279],{"key":20,"text":274,"correct":22},"中标价与施工图预算价",{"key":24,"text":276,"correct":22},"中标价与施工预算价",{"key":28,"text":278,"correct":22},"施工图预算价与施工预算价",{"key":31,"text":280,"correct":26},"中标价与直接成本分析价",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":20,"analysis":33},1256451,"材料采购员择优选购材料，正确计量，认真验收，主要可以降低材料的（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":26},"采购成本",{"key":24,"text":288,"correct":22},"加工成本",{"key":28,"text":290,"correct":22},"库存成本",{"key":31,"text":292,"correct":22},"周转成本",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},1256452,"全面负责项目成本控制工作，是项目成本控制的责任中心的是（ ）。",[297,298,300,302],{"key":20,"text":191,"correct":26},{"key":24,"text":299,"correct":22},"行政管理人员",{"key":28,"text":301,"correct":22},"工程技术人员",{"key":31,"text":303,"correct":22},"财务成本人员",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":31,"analysis":33},1256453,"某市政道路K0+000~K0+100为沥青混凝土结构，表面层为3cm厚细粒式沥青混凝土，路面宽度为12m，路面两边铺侧缘石，路肩各宽1m。则该面层的工程量为（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"36m3",{"key":24,"text":311,"correct":22},"42m3",{"key":28,"text":313,"correct":22},"1200㎡",{"key":31,"text":315,"correct":26},"1400㎡",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":28,"analysis":33},1256454,"下列关于施工项目成本管理的论述中，错误的是（ ）。",[320,322,324,326],{"key":20,"text":321,"correct":22},"施工项目成本预测是成本决策与编制成本计划的依据",{"key":24,"text":323,"correct":22},"施工项目成本计划应该在项目施工组织设计优化的前提下编制",{"key":28,"text":325,"correct":26},"应采用静态控制原理对实际施工项目成本的发生过程进行有效控制",{"key":31,"text":327,"correct":22},"施工项目成本核算是成本分析的依据",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},1256455,"控制返工率，降低质量安全成本属于施工成本控制的（ ）。",[332,334,336,338],{"key":20,"text":333,"correct":22},"组织措施",{"key":24,"text":335,"correct":26},"技术措施",{"key":28,"text":337,"correct":22},"合同措施",{"key":31,"text":339,"correct":22},"管理措施",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":28,"analysis":33},1256456,"下列选项中，不属于施工项目成本中的直接成本的是（ ）。",[344,345,346,348],{"key":20,"text":215,"correct":22},{"key":24,"text":217,"correct":22},{"key":28,"text":347,"correct":26},"工程排污费",{"key":31,"text":349,"correct":22},"文明施工及环境保护措施费",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":28,"analysis":33},1256457,"A公司中标的某城市场高架跨线桥工程，为15跨25m预应力简支梁桥，桥面宽22m，采用?1200mm的钻孔灌注桩基础，埋置式承台，Y型独立式立柱。工程中标价2850万元。经过成本预测分析，项目目标成本为2600万，其中间接成本占10％。在工程进行过程中发生了如下事件：事件1.工程开工2个月后，因资金不足，贷款500万元，共支付利息30万元。事件2.某承台开挖时发现文物，按上级有关部门要求停工30d，导致总工期拖延10d，未发生直接成本损失。 根据《市政工程工程量计算规范》（ ）B50857一2013），下列说法正确的是（ ）。",[354,356,358,360],{"key":20,"text":355,"correct":22},"道路面层铺筑按设计图示尺寸，以体积计算",{"key":24,"text":357,"correct":22},"桥梁钻孔桩基础如以米计算时，按设计图示尺寸，以桩长计算，但不包括桩尖",{"key":28,"text":359,"correct":26},"现浇混凝土桥面铺装应以面积计算",{"key":31,"text":361,"correct":22},"埋置式承台的现浇混凝土应按设计图示尺寸，以面积计算",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":24,"analysis":33},1256458,"如果工程施工过程中发生工程变更，合同中有类似于变更工程的价格，则（ ）确定变更价款。",[366,368,370,372],{"key":20,"text":367,"correct":22},"由承包人提出价格，发包人确认后",{"key":24,"text":369,"correct":26},"参照类似的合同价格",{"key":28,"text":371,"correct":22},"按合同已有价格",{"key":31,"text":373,"correct":22},"由承包人提出价格，工程师确认后。",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":28,"analysis":33},1256459,"某市政道路K0+000~K0+500为沥青混凝土结构，基层为20cm厚石灰粉煤灰基层，路面宽度为8m，路肩各宽1m，为保证压实，每边各加宽20cm。根据工程量清单计算规则，则该基层的工程量为（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":22},"800㎡",{"key":24,"text":381,"correct":22},"4200m3",{"key":28,"text":383,"correct":26},"5000㎡",{"key":31,"text":385,"correct":22},"5200㎡",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":28,"analysis":33},1256460,"根据《市政工程工程量计算规范》（GB50857-2013），土方体积应该按挖掘前（ ）计算。",[390,392,394,396],{"key":20,"text":391,"correct":22},"松填",{"key":24,"text":393,"correct":22},"夯填",{"key":28,"text":395,"correct":26},"天然密实体积",{"key":31,"text":397,"correct":22},"虚土",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":20,"analysis":33},1256461,"建立进度控制小组，将进度控制任务落实到个人属于施工项目进度控制措施中（ ）。",[402,403,404,406],{"key":20,"text":333,"correct":26},{"key":24,"text":335,"correct":22},{"key":28,"text":405,"correct":22},"经济措施",{"key":31,"text":337,"correct":22},{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},1256462,"下列措施中，不属于施工成本目标控制的方法是的（ ）。",[411,413,415,417],{"key":20,"text":412,"correct":26},"以目标成本控制成本支出",{"key":24,"text":414,"correct":22},"合理配置施工人员",{"key":28,"text":416,"correct":22},"用净值法进行工期成本的同步控制",{"key":31,"text":418,"correct":22},"运用目标管理控制工程成本",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":31,"analysis":33},1256463,"某城市道路全长640m，路面宽度为12m，路肩宽度为1m，由于该段地基湿软，对其进行碎石桩处理。前后桩间距8m，路基宽度范围内一排3根桩，桩径为0.5m，桩长为2m。根据工程量清单计算规则，则该碎石桩的工程量为（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":22},"162m",{"key":24,"text":426,"correct":22},"432m",{"key":28,"text":428,"correct":22},"456m",{"key":31,"text":430,"correct":26},"486m",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":28,"analysis":33},1256464,"下列选项中，不属于施工成本控制的依据的是（ ）。",[435,437,438,439],{"key":20,"text":436,"correct":22},"工程承包合同",{"key":24,"text":241,"correct":22},{"key":28,"text":245,"correct":26},{"key":31,"text":243,"correct":22},{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},1256465,"根据《建设工程工程量清单计价规范》GB50500-2013规定，税金项目清单不包括（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"城乡维护建设税",{"key":24,"text":447,"correct":22},"教育费附加",{"key":28,"text":449,"correct":22},"营业税",{"key":31,"text":451,"correct":26},"土地使用税",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":31,"analysis":33},1256466,"工程量清单一个最基本的功能是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"作为计价、询标和评标的基础",{"key":24,"text":459,"correct":22},"为施工过程中支付工程进度款提供依据",{"key":28,"text":461,"correct":22},"为办理竣工结算及工程索赔提供了重要依据",{"key":31,"text":463,"correct":26},"作为信息的载体，为潜在的投标者提供必要的信息",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":20,"analysis":33},1256467,"工程单价分析中，工、料、机单价应是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":26},"考虑预期价格浮动后的优选价",{"key":24,"text":471,"correct":22},"考虑预期价格浮动后的预算定额价",{"key":28,"text":473,"correct":22},"考虑预期价格浮动后的市场指导价",{"key":31,"text":475,"correct":22},"考虑预期价格浮动后的概算定额价",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":31,"analysis":33},1256468,"施工项目（ ）是施工项目成本决策与计划的依据。",[480,482,484,486],{"key":20,"text":481,"correct":22},"成本分析",{"key":24,"text":483,"correct":22},"成本预测",{"key":28,"text":485,"correct":22},"成本考核",{"key":31,"text":487,"correct":26},"成本控制",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},1256469,"某路面面层，总长为1.6km。路面面层材料采用改性沥青AC-13，厚度为5cm，宽度为9m。需要摊铺（ ）m3AC-13改性沥青混凝土。",[492,494,496,498],{"key":20,"text":493,"correct":22},"540",{"key":24,"text":495,"correct":26},"720",{"key":28,"text":497,"correct":22},"10800",{"key":31,"text":499,"correct":22},"14400",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},1256470,"施工项目成本分析的基本方法不包括（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":26},"表格法",{"key":24,"text":507,"correct":22},"比较法",{"key":28,"text":509,"correct":22},"因素分析法",{"key":31,"text":511,"correct":22},"比率法",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":28,"analysis":33},1256471,"在施工成本计划的编制程序中，按照（ ），计算各分部分项工程的计划人工、材料、机械使用量。",[516,518,520,522],{"key":20,"text":517,"correct":22},"施工方案",{"key":24,"text":519,"correct":22},"预控偏差总和",{"key":28,"text":521,"correct":26},"企业施工定额",{"key":31,"text":523,"correct":22},"市场生产要素价格信息",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1256472,"以下关于工程量清单计价的说法中，论述不正确的是（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"工程量清单是招标文件的组成部分",{"key":24,"text":531,"correct":26},"工程量清单应采用工料单价计价",{"key":28,"text":533,"correct":22},"工程量清单可由招标人编制",{"key":31,"text":535,"correct":22},"工程量清单单价由投标人自主报价",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":28,"analysis":33},1256473,"下列选项中，不属于施工成本控制的原则的是（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":22},"成本最低化原则",{"key":24,"text":543,"correct":22},"全面成本控制原则",{"key":28,"text":545,"correct":26},"静态控制原则",{"key":31,"text":547,"correct":22},"目标管理原则",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":28,"analysis":33},1256474,"下列有关工程量计算的论述中，错误的是（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":22},"土方开挖体积应按挖掘前的天然密实体积计算",{"key":24,"text":555,"correct":22},"挖方出现流沙时，如设计未明确，结算时，应根据实际情况由发包人与承包人双方现场签证确认工程量",{"key":28,"text":557,"correct":26},"计算开挖沟槽断面体积时，若存在不同类别土壤时，应分别按放坡起点、放坡系数，依不同土类别厚度取算术平均值计算",{"key":31,"text":559,"correct":22},"管沟施工每侧所需工作面宽度取值与管道结构宽有关",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},1256475,"A公司中标的某城市场高架跨线桥工程，为15跨25m预应力简支梁桥，桥面宽22m，采用?1200mm的钻孔灌注桩基础，埋置式承台，Y型独立式立柱。工程中标价2850万元。经过成本预测分析，项目目标成本为2600万，其中间接成本占10％。在工程进行过程中发生了如下事件：事件1.工程开工2个月后，因资金不足，贷款500万元，共支付利息30万元。事件2.某承台开挖时发现文物，按上级有关部门要求停工30d，导致总工期拖延10d，未发生直接成本损失。 针对事件1，本项目利息应计人（ ）成本。",[564,566,568,569],{"key":20,"text":565,"correct":22},"直接成本",{"key":24,"text":567,"correct":26},"间接成本",{"key":28,"text":219,"correct":22},{"key":31,"text":570,"correct":22},"措施成本",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},1256476,"根据工程量清单计价有关规定，不得作为竞争性费用的项目为（ ）。",[575,576,578,579],{"key":20,"text":215,"correct":22},{"key":24,"text":577,"correct":26},"安全文明施工费",{"key":28,"text":256,"correct":22},{"key":31,"text":217,"correct":22},{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":31,"analysis":33},1256477,"下列关于施工成本控制的步骤，正确排序的是（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"比较→预测→分析→纠偏→检查",{"key":24,"text":587,"correct":22},"预测→比较→分析→纠偏→检查",{"key":28,"text":589,"correct":22},"预测→分析→纠偏→检查→比较",{"key":31,"text":591,"correct":26},"比较→分析→预测→纠偏→检查",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},1256478,"工程量清单漏项或设计变更引起的新的工程量清单项目，其相应综合单价由（ ）提出，经确认后作为结算的依据。",[596,598,600,602],{"key":20,"text":597,"correct":22},"发包人",{"key":24,"text":599,"correct":26},"承包人",{"key":28,"text":601,"correct":22},"监理单位",{"key":31,"text":603,"correct":22},"设计单位",[605,608,611,614,617,620],{"id":15,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":15},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]