[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256781":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1256781,840,3,"判断题","目前项目经理部的项目信息管理系统，是静态地处理大量项目施工及相关信息。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"施工项目信息管理系统的基本要求：项目信息管理系统应能使设计信息、施工准备阶段的管理信息、施工过程项目管理各专业的信息、项目结算信息、项目统计信息等有良好的接口。",{"id":6,"name":21,"category":22,"favorite":23},"(市政施工)专业管理实务 岗位知识","建筑工程",0]