[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256780":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1256780,840,3,"判断题","项目计划的跟踪、更新、调整和实施是一个不断进行的静态过程。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"项目计划的跟踪、更新、调整和实施是一个不断进行的动态过程，直至项目结束。",{"id":6,"name":21,"category":22,"favorite":23},"(市政施工)专业管理实务 岗位知识","建筑工程",0]