[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256758":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1256758,840,3,"判断题","工程量清单报价采用全国统一的12位数字编码。前六位编码不能变动，后六位编码由清单编制人根据项目设置的清单项目编制。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"十至十二位是清单项目名称编码，由清单编制人员根据招标工程的工程量清单项目名称设置。",{"id":6,"name":21,"category":22,"favorite":23},"(市政施工)专业管理实务 岗位知识","建筑工程",0]