[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256753":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1256753,840,3,"判断题","工程量清单是招标文件的重要组成部分，各投标单位根据自身的管理水平、技术水平和施工经验填报工程数量和单价。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"各投标人依据招标人提供的工程量清单，根据自身的技术能力、施工经验、管理能力、企业定额填写单价和计算合价。",{"id":6,"name":21,"category":22,"favorite":23},"(市政施工)专业管理实务 岗位知识","建筑工程",0]