[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256744":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1256744,840,3,"判断题","确因施工需要在围挡外堆放的材料，应有序堆放，且不得超过48小时。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"确因施工需要在围挡外堆放的材料，应有序堆放，且不得超过24小时。",{"id":6,"name":21,"category":22,"favorite":23},"(市政施工)专业管理实务 岗位知识","建筑工程",0]