[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256737":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1256737,840,3,"判断题","各类作业平台、卸料平台应按相关规定编制施工方案，项目分管负责人审批签字后，方可作业。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"第十条各类作业平台、卸料平台应按相关规定编制施工方案,项目分管负责人审批签字并组织有关部门验收,经验收合格签字后,方可作业。",{"id":6,"name":21,"category":22,"favorite":23},"(市政施工)专业管理实务 岗位知识","建筑工程",0]