[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256655":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1256655,840,3,"判断题","施工进度计划可按项目的结构分解为基础工程和主体工程的进度计划。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"施工进度计划不可按项目的结构分解。",{"id":6,"name":21,"category":22,"favorite":23},"(市政施工)专业管理实务 岗位知识","建筑工程",0]