[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256629":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1256629,840,3,"判断题","进度计划中的”S”形曲线是以时间为横轴，以累计完成的工程费用的百分数为纵轴的图表化曲线。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(市政施工)专业管理实务 岗位知识","建筑工程",0]