[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256619":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1256619,840,3,"判断题","横道图表的水平方向表示工程施工的平面地理位置或施工区段划分，纵坐标表示进度时间。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"横道图表的水平方向表示工程施工的持续时间，其时间单位可大可小。",{"id":6,"name":21,"category":22,"favorite":23},"(市政施工)专业管理实务 岗位知识","建筑工程",0]